REQUEST FOR INFORMATION (RFI)
23 December 2014
Q10- Regarding CD100 note 11, please provide a quantity or allowance for all bidders to carry for this contaminated soil remediation.
A10: “General Demolition Note” number 11 does not make reference to contaminated soil. Rather, the note directs the prospective Contractor to haul excess or unsuitable soil from the site. The amount of soil has not been determined. The bidders should provide their own estimate as to the quantity of soil that may need to be hauled.
Q11- In regards to the Fire Alarm:
A11:
-Who is Authority Having Jurisdiction for this project?
The Authority Having Jurisdiction is the Base Fire Marshall.
-Is it possible to be provided more detail regarding the phone system interface?
The combination MNS/FACP will have a connection to the building phone system, which will be utilized for a public address paging system.
-What function is being performed by the CAT6 cable that is referenced?
Please refer to the response above.
-What kind of inter connection is required to the base wide system?
The combination MNS/FACP also reports to the respective base-wide systems via the transceivers and antennas.
-There is reference to radio transceivers and an antenna but no specifics?
Prospective bidders shall disregard “Government Furnished” within keyed note number 14 on sheet FA501-0. Contractor shall provide transceivers and antennas, which are compatible with the Base-Wide system.
-Is there a specification for the annunciator panel?
Specification section 283100 “Fire Alarm and Mass Notification Systems” states for the Contractor to provide “manufacturer’s standard construction” annunciator by the same manufacturer as the complete system within Part 2, 2.03.J.5.
Q12- Dwg E601, is the transformer furnished by PSE&G or Elect Contractor?
A12: The transformer shall be provided by the Contractor in accordance with PSE&G specifications/requirements.
Q13- Is there a specification for the generator?
A13: The make and model number of the existing diesel generator has been provided on sheet E601-0 within keyed note number 6.
Q14- Are there two existing generator circuit breakers in the generator enclosure, the riser diagrams are not the same?
A14: Yes.
Q15- On the FBO website there is a link for Amendment 3, when the attachment is opened it is Amendment 2. Please clarify
A15: On the FBO website what is referenced as Amendment 2 is the same as Amendment 1- it was posted twice in error. Amendment 3 on the website is really Amendment 2. As of December 23, 2014 there are only 2 Amendments.