REQUEST FOR INFORMATION (RFI)
5 January 2015
Q31- Our Curtain Wall supplier is advising the spec designated a blast resistant curtain wall system, however the recent amendment indicates the glazing to be type 6. To the best of our knowledge type 6 glazing is not available in military grade blast resistance.
Please clarify.
A31: The specifications require the glazing to be performance engineered. All exterior glazing, windows, storefronts, doors, and door hardware for inhabited areas of this project must meet minimum DoD blast resistance requirements. The Contractor is required to provide glazing that meets this requirement. Even though glazing type 6 indicates a minimum lamination thickness, the glazing could be increased based on the performance blast calculations assuming explosive weight II at 30' standoff. The storefront specification 084113 is showing outdated blast criteria. The prospective bidders should refer to the aluminum window specification 085113 for the correct updated criteria and ignore the criteria in 084113.
Q32 - On Drawing T-101, the Enlarged plan Comm. Rm 132 shows 4 racks / cabinets but the rack elevation Detail 1 on drawing T-502 shows only 2 racks. Confirm Qty of racks and or cabinets.
A32: The prospective bidders shall refer to drawing T-101 for quantities.
Q33 - On drawing T-502 Detail 1 rack elevation, please confirm the following
* Keyed Note 4 – CATV Amplifier, who is furnishing and installing? No info provided.
A: Contractor furnished / Contractor installed (CFCI).
* Keyed Note 5 – CATV Optical receiver, who is furnishing and installing? No info provided.
A: Contractor furnished / Contractor installed (CFCI).
* Keyed Note 10 – Protective entrance terminal, who is furnishing and installing?
OSP cabling is GFGI, no info provided.
A: Contractor furnished / Contractor installed (CFCI).
* Keyed Note 14 - CATV Splitter, who is furnishing and installing? OSP cabling is
GFGI, no info provided.
A: Contractor furnished / Contractor installed (CFCI).
Q34 - On drawing T-101 Keyed Note 6 talks about a secured cabinet in Comm. Rm 132, is that he fiber cabinet provided by the base or a 7’ equipment cabinet?
A34: The cabinet is Contractor furnished / Contractor installed, but the secure equipment within is Government furnished / Government installed.
Q35 - Where does the fiber cabling for the type 6 drops get terminated in the Comm. Rm. 132?
Within the fiber cabinet provided by the base?
A35: The secure Type 6 drops will be terminated within the equipment/patch panel in the secure cabinet in Room 132.
Q36 - How does the CATV cabling get terminated in Comm. Rm 132? Directly into the CATV amp?
A36: CATV cabling from the outlets shall be run to a splitter, then to a signal amplifier.
Q37 - . The specs talk about patch cords but does not state lengths or how many per cable are needed? More info needed.
A37: All patch cords will be provided by the Base Communications Flight.