REQUEST_FOR_INFORMATION_0009.pdf

PDF 32 KB Posted

Attached to
Repair Fire Station Bldg. 300 and add to Fire Station Bldg. 300
Solicitation number
W912PQ-15-B-0001
Issued by

About this file

Request for Information 0009

View the file

Other files

File Type Posted
2015_01_06_16_08_36.pdf PDF
OF_1419A_Page_2.pdf PDF
OF_1419A_Page_3.pdf PDF
OF_1419.pdf PDF
Gabreski_Airport_Geotechnical_Report_Final_2013-08-07.pdf PDF
REQUEST_FOR_INFORMATION_0008.pdf PDF
REQUEST_FOR_INFORMATION_0007_.pdf PDF
RFI__0006.pdf PDF
RFI_0005.pdf PDF
RFI_0004.pdf PDF
ARFS088000.NY11.pdf PDF
RFI_0003_Response.pdf PDF
69623_A-602-rev1.pdf PDF
REQUEST_FOR_INFORMATION_0002.pdf PDF
2014_12_15_12_11_24.pdf PDF
Pre-Bid_Slides_Fire_Station.pptx PPTX presentation
ARFS085113_NY11.pdf PDF
Request_For_Information_(RFI)_0001_Response.pdf PDF
SOLICITATION_AMENDMENT_0002.pdf PDF
CONTRACTOR_REQUEST_FORM_(Master).xlsx XLSX spreadsheet
SOLICITATION_AMENDMENT_0001.pdf PDF
Change_Order_1.pdf PDF
100__IFB_VOL_1_-_SPECS_-_Rev_120214.pdf PDF
100__IFB_VOL_2_-_SPECS_-_Rev_120214.pdf PDF
W912PQ-15-B-0001.pdf PDF
69623-IFB-DRAWING_SET_-_Rev_120214.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

5 January 2015

Q31- Our Curtain Wall supplier is advising the spec designated a blast resistant curtain wall system, however the recent amendment indicates the glazing to be type 6. To the best of our knowledge type 6 glazing is not available in military grade blast resistance.

Please clarify.

A31: The specifications require the glazing to be performance engineered. All exterior glazing, windows, storefronts, doors, and door hardware for inhabited areas of this project must meet minimum DoD blast resistance requirements. The Contractor is required to provide glazing that meets this requirement. Even though glazing type 6 indicates a minimum lamination thickness, the glazing could be increased based on the performance blast calculations assuming explosive weight II at 30' standoff. The storefront specification 084113 is showing outdated blast criteria. The prospective bidders should refer to the aluminum window specification 085113 for the correct updated criteria and ignore the criteria in 084113.

Q32 - On Drawing T-101, the Enlarged plan Comm. Rm 132 shows 4 racks / cabinets but the rack elevation Detail 1 on drawing T-502 shows only 2 racks. Confirm Qty of racks and or cabinets.

A32: The prospective bidders shall refer to drawing T-101 for quantities.

Q33 - On drawing T-502 Detail 1 rack elevation, please confirm the following

* Keyed Note 4 – CATV Amplifier, who is furnishing and installing? No info provided.

A: Contractor furnished / Contractor installed (CFCI).

* Keyed Note 5 – CATV Optical receiver, who is furnishing and installing? No info provided.

A: Contractor furnished / Contractor installed (CFCI).

* Keyed Note 10 – Protective entrance terminal, who is furnishing and installing?

OSP cabling is GFGI, no info provided.

A: Contractor furnished / Contractor installed (CFCI).

* Keyed Note 14 - CATV Splitter, who is furnishing and installing? OSP cabling is

GFGI, no info provided.

A: Contractor furnished / Contractor installed (CFCI).

Q34 - On drawing T-101 Keyed Note 6 talks about a secured cabinet in Comm. Rm 132, is that he fiber cabinet provided by the base or a 7’ equipment cabinet?

A34: The cabinet is Contractor furnished / Contractor installed, but the secure equipment within is Government furnished / Government installed.

Q35 - Where does the fiber cabling for the type 6 drops get terminated in the Comm. Rm. 132?

Within the fiber cabinet provided by the base?

A35: The secure Type 6 drops will be terminated within the equipment/patch panel in the secure cabinet in Room 132.

Q36 - How does the CATV cabling get terminated in Comm. Rm 132? Directly into the CATV amp?

A36: CATV cabling from the outlets shall be run to a splitter, then to a signal amplifier.

Q37 - . The specs talk about patch cords but does not state lengths or how many per cable are needed? More info needed.

A37: All patch cords will be provided by the Base Communications Flight.