69623-IFB-DRAWING_SET_-_Rev_120214.pdf
PDF 21 MB Posted
- Solicitation number
- W912PQ-15-B-0001
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2015_01_06_16_08_36.pdf | ||
| OF_1419A_Page_2.pdf | ||
| OF_1419A_Page_3.pdf | ||
| OF_1419.pdf | ||
| REQUEST_FOR_INFORMATION_0009.pdf | ||
| Gabreski_Airport_Geotechnical_Report_Final_2013-08-07.pdf | ||
| REQUEST_FOR_INFORMATION_0008.pdf | ||
| REQUEST_FOR_INFORMATION_0007_.pdf | ||
| RFI__0006.pdf | ||
| RFI_0005.pdf | ||
| RFI_0004.pdf | ||
| ARFS088000.NY11.pdf | ||
| RFI_0003_Response.pdf | ||
| 69623_A-602-rev1.pdf | ||
| REQUEST_FOR_INFORMATION_0002.pdf | ||
| 2014_12_15_12_11_24.pdf | ||
| Pre-Bid_Slides_Fire_Station.pptx | PPTX presentation | |
| ARFS085113_NY11.pdf | ||
| Request_For_Information_(RFI)_0001_Response.pdf | ||
| SOLICITATION_AMENDMENT_0002.pdf | ||
| CONTRACTOR_REQUEST_FORM_(Master).xlsx | XLSX spreadsheet | |
| SOLICITATION_AMENDMENT_0001.pdf | ||
| Change_Order_1.pdf | ||
| 100__IFB_VOL_1_-_SPECS_-_Rev_120214.pdf | ||
| 100__IFB_VOL_2_-_SPECS_-_Rev_120214.pdf | ||
| W912PQ-15-B-0001.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
descriptiondateno. by ckd
Gabreski Air National Guard Base 106th Rescue Wing
Repair & Add To Fire Station
New York Air National Guard
Contract Drawings
69623
Contract WKVB 002397/ WKVB 099052
October 2014
C O P Y R I G H T
B U
R N
S
M c D
O N
N E
L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
Francis S. Gabreski Airport Westhampton Beach, NY
ISSUE FOR BID
0 10/15/14 VV ISSUE FOR BIDBB
Index ckdbyno. date description
Contract Drawings
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
4 Contract: WKVB002397
WKVB099052
NOT TO SCALE
FRANCIS
GABRESKI
AIRPORT
VICINITY MAP
ELECTRICAL DRAWINGS
TITLEDWG. NO.
GENERAL DRAWINGS
TITLE
COVER
GENERAL DRAWINGS
DWG. NO.
COVER
MECHANICAL DRAWINGS
TITLEDWG. NO.
N
ISSUE FOR BID
CIVIL DRAWINGS
TITLEDWG. NO.
New York Air National Guard
INDEX
Repair & Add to Fire Station
ARCHITECTURAL DRAWINGS
TITLEDWG. NO.
STRUCTURAL DRAWINGS
TITLEDWG. NO.
0 10/15/14 VV ISSUE FOR BIDBB
G-001 ACCESS AND SAFETY PLAN
G-002 ACCESS AND SAFETY PLAN NOTES
G-003 EXISTING CONDITIONS PLAN
CD100 DEMOLITION PLAN
C-101 SITE PLAN
C-102 UTILITY PLAN
C-103 GRADING AND DRAINAGE PLAN
C-104 SOIL EROSION AND SEDIMENT CONTROL PLAN
C-105 BID OPTIONS AND LANDSCAPING PLAN
C-500 DETAILS
C-501 DETAILS
C-502
CONCRETE PAVEMENT JOINTING PLAN AND JOINT DETAILS (BID
OPTION1)
C-503 DETAILS
C-504 DETAILS
C-505 DETAILS
C-506 DETAILS
C-507 DETAILS
A-001
ARCHITECTURAL SYMBOLS, ABBREVIATIONS & GENERAL NOTES
A-002 BUILDING CODE ANALYSIS AND LIFE SAFETY CRITERIA
A-003 LIFE SAFETY PLAN
AD11 DEMOLITION PLAN
A-012 OVERALL NEW CONSTRUCTION FLOOR PLAN
A-013 ROOF PLAN
A-014 REFLECTED CEILING PLAN
A-101 ENLARGED FLOOR PLAN - PART A
A-102 ENLARGED FLOOR PLAN - PART B
A-201 EXTERIOR BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-401 ENLARGED PLANS
A-402 ENLARGED ENTRY PLAN & ELEVATION
A-501 PARTITION TYPES
A-502 COLUMN ENCLOSURE DETAILS
A-503 EXTERIOR WALL DETAILS
A-504 SECTION DETAILS
A-505 SECTION DETAILS
A-506 MILLWORK DETAILS
A-507 MILLWORK DETAILS
A-510
CEILING DETAILS
A-511
PENETRATION DETAILS
A-512
ROOF DETAILS
A-513
ROOF DETAILS
A-515
MISCELLANEOUS DETAILS
A-601
ROOM FINISH SCHEDULE
A-602 DOOR, WINDOW & LOUVER SCHEDULE
A-603
DOOR DETAILS
A-604
DOOR DETAILS
A-605
WINDOW & LOUVER DETAILS
A-606
SIGNAGE SCHEDULE
A-701 PRE-FABRICATED METAL BUILDING DETAILS
E-001 ELECTRICAL SYMBOLS LEGEND
ED002 ELECTRICAL SITE PLAN - DEMOLITION
E-002 ELECTRICAL SITE PLAN - NEW WORK
ED101 ELECTRICAL DEMOLITION PLAN
E-101 POWER PLAN
E-102
MECHANICAL EQUIPMENT POWER PLAN
E-103
MECHANICAL EQUIPMENT POWER PLAN - ROOF
E-104 GROUNDING PLAN
E-201 LIGHTING FLOOR PLAN - AREA A
E-202 LIGHTING FLOOR PLANS - AREAS B & C
E-301 FIRE STATION ALERTING SYSTEM PLAN
E-401 ENLARGED POWER FLOOR PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-601 ELECTRICAL DEMOLITION & NEW WORK ONE-LINE DIAGRAMS
E-901 ELECTRICAL PANEL SCHEDULES
E-902 ELECTRICAL PANEL SCHEDULES
E-903 LIGHTING FIXTURE AND CONTROLS SCHEDULES
FA001
FIRE ALARM SYMBOLS, NOTES, LEGEND AND ABBREVIATIONS
FA101 FIRE ALARM & MASS NOTIFICATION SYSTEMS PLAN
FA501 FIRE ALARM AND MASS NOTIFICATION DETAILS AND RISER
FA901 FIRE ALARM/MASS NOTIFICATION SYSTEM MATRIX
T-001
COMMUNICATIONS AND SECURITY LEGENDS, ABBREVIATIONS AND
NOTES
T-101 COMMUNICATIONS PLAN
T-102 CCTV AND SECURITY PLAN
T-501 COMMUNICATIONS DETAILS
T-502 COMMUNICATIONS AND SECURITY DETAILS
T-601 COMMUNICATIONS AND IDS RISER DIAGRAMS AND SCHEDULE
S-001 GENERAL NOTES
S-002 LEGENDS AND ABBREVIATIONS
S-003 SPECIAL INSPECTIONS SHEET
S-004 COMPONENTS AND CLADDING WIND LOADS
S-005 TYPICAL CONCRETE DETAILS
S-006 TYPICAL MASONRY DETAILS
S-007 TYPICAL STEEL DETAILS
S-008 TYPICAL ROOF DECK & JOIST DETAILS
SD-100 FOUNDATION DEMOLITION PLAN
SD-110 ROOF FRAMING DEMOLITION PLAN
S-100 FOUNDATION PLAN
S-110 ROOF FRAMING PLAN
S-300 FOUNDATION SECTIONS AND DETAILS
S-301 ENTRYWAY SECTIONS AND DETAILS
S-302 APPARATUS BAY SECTIONS AND DETAILS
S-303 ROOF FRAMING SECTIONS AND DETAILS
S-304 ROOF FRAMING SECTIONS AND DETAILS
S-701 PEMB BID OPTION FOUNDATION
M-001
MECHANICAL SYMBOLS, LEGEND & ABBREVIATIONS
MD-101 HVAC DEMOLITION FLOOR PLAN
M-101 DUCTWORK 1ST FLOOR PLAN - AREA A
M-102 HVAC 1ST FLOOR PLAN - AREA B
M-103 HVAC PIPING 1ST FLOOR PLAN - AREA A
M-104 HVAC ROOF PLAN
M-301 HVAC SECTIONS
M-302 HVAC SECTIONS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-504 HVAC DETAILS
M-601
HVAC EQUIPMENT SCHEDULES
M-602
HVAC EQUIPMENT SCHEDULES
M-650
VRF PIPING FLOW DIAGRAM (CU-1)
M-651
VRF PIPING FLOW DIAGRAM (CU-2)
M-700 CONTROLS LEGEND
M-701
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
M-702
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
M-703
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
M-704
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
M-705
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
M-706
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
M-707
CONTROL DIAGRAM & SEQUENCE OF OPERATIONS
FX-001
LEGEND, NOTES AND DESIGN CRITERIA
FX-101 FLOOR PLAN
FX-601 DIAGRAMS
P-001
PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS
PD-101 DEMOLITION PLUMBING FLOOR PLAN - BELOW SLAB
PD-102 DEMOLITION PLUMBING FLOOR PLAN - ABOVE SLAB
PD-103 DEMOLTION PLUMBING ROOF PLAN
P-101 PLUMBING FLOOR PLAN "A" - BELOW SLAB
P-102 PLUMBING FLOOR PLAN "B" - BELOW SLAB
P-103 PLUMBING FLOOR PLAN "A" - ABOVE SLAB
P-104 PLUMBING FLOOR PLAN "B" - ABOVE SLAB
P-105 PLUMBING ROOF PLAN
P-201 ENLARGED PLUMBING FLOOR PLANS
P-202 ENLARGED PLUMBING FLOOR PLANS
P-301 SANITARY RISER DIAGRAM "A"
P-302 SANITARY RISER DIAGRAM "B"
P-303 PLUMBING RISER DIAGRAM "A"
P-304 PLUMBING RISER DIAGRAM "B"
P-401 PLUMBING DETAILS
P-402 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
I:\USAIRNG\69623\CAD\WKSPACE\69623-NDX.DWG 10/10/2014 1:27 PM VVYAS
CONTRACT SCOPE DELINEATION PLAN
ckdbyno. date description
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
Contract: REPAIR FIRE STATION, BLDG. 300 WKVB002397
ADD TO FIRE STATION WKVB099052
ISSUE FOR BID
0 10/15/14 VV ISSUE FOR BIDBB
NOT TO SCALE
CONTRACT SCOPE
DELINEATION PLAN
N
(SRM) "REPAIR" PROJECT:
PROJECT NO. WKVB002397
(P-341) "ADD" PROJECT:
PROJECT NO. WKVB099052
I:\USAIRNG\69623\CAD\WKSPACE\69623-SCOPE.DWG 12/3/2014 8:35 AM BPBAKAS
LEGEND
EXISTING FIRE STATION
TEMPORARY TRAILER
BLDG ADDITION
BLDG LETTERING/
PLAQUES ABI #3
ALTERNATE BID ITEM'S - FOR WKVB099052
ABI #1 - MASONRY GARAGE
ABI #2 - CONCRETE PAVEMENT
ABI #3 - BUILDING LETTERING
ABI #4 - TREES
BLDG LETTERING/
PLAQUES ABI #3
BLDG LETTERING/
PLAQUES ABI #3
TREES (TYP.), ABI #4
ABI #1
MASONRY BUILDING
PRE ENGINEERED
METAL BUILDING
(PEMB)
CONCRETE
PAVEMENT ABI #2
NOTE:
60% COST TO "REPAIR" WKVB002397
40% COST TO "ADD TO" WKVB099052
CONCRETE
PAVEMENT ABI #2
CONCRETE
PAVEMENT ABI #2
ALTERNATE BID ITEM'S - FOR WKVB002397
ABI #5 - COMMUNICATIONS
ABI #5 - COMMUNICATIONS
O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
NOVEMBER 26, 2013 M. FERNANDEZ
L. MONZON D. LENZ
ACCESS AND SAFETY PLAN
G-001 0
69623-G001.dwg
LIST OF ABBREVIATIONS
ABI ALTERNATE BID ITEM
ACP ASBESTOS CEMENT PIPE
ALUM ALUMINUM
ANG AIR NATIONAL GUARD
ASSY ASSEMBLY
AT / FP ANTI TERRORISM / FORCE PROTECTION
BC BOTTOM OF CURB
BCE BASE CIVIL ENGINEER
BIT BITUMINOUS CONCRETE
BLDG BUILDING
CB CATCH BASIN
CATV CABLE TELEVISION
CI CAST IRON PIPE
CIC CAST IRON COVER
CLF CHAIN LINK FENCE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
COTR CONTRACTING OFFICER'S
TECHNICAL REPRESENTATIVE
DI DUCTILE IRON PIPE
DIA DIAMETER
DMH DRAINAGE MANHOLE
E EASTING
EL ELECTRICAL
EMH ELECTRIC MANHOLE
FAR FEDERAL AVIATION REGULATION
FF FINISH FLOOR
GALV GALVANIZED
HMA HOT MIX ASPHALT
HT HEIGHT
HYD HYDRANT
INV INVERT
KSM KILOGRAM / SQUARE METER
LF LINEAR FOOT
LOD LIMIT OF DISTURBANCE
MAX MAXIMUM
MC MINOR CONSTRUCTION
MFR MANUFACTURER
MIN MINIMUM
MM MILLIMETERS
N NORTHING
NO NUMBER
NOM NOMINAL
OC OFF CENTER
OD OUTSIDE DIMENSION
POB POINT OF BEGINNING
PIV POST INDICATOR VALVE
PVC POLYVINYL CHLORIDE PIPE
RAD RADIUS
RCP REINFORCED CONCRETE PIPE
SESC SOIL EROSION AND SEDIMENT CONTROL
SMH SANITARY MANHOLE
SRM SUSTAINMENT, RESTORATION & MAINTENANCE
SQ FT SQUARE FOOT
SQ M SQUARE METER
SWPPP STORM WATER POLLUTION PREVENTION PLAN
TC TOP OF CURB
TYP TYPICAL
UP UTILITY POLE
UD UNDERDRAIN
VC VITRIFIED CLAY PIPE
VIF VERIFY IN FIELD
W/O WITHOUT
CONSTRUCTION ACCESS PLAN
NOT TO SCALE
PROJECT SITE
RUNWAY 6-24
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
WKVB002397
WKVB099052
69623
REPAIR & ADD TO FIRE STATION
I:\USAIRNG\69623\CAD\CIVIL\69623-G001.DWG 10/14/2014 2:37 PM FPASCERI
SITE ACCESS
STAGING AREA
HAUL ROUTE
TEMPORARY FENCE
A
INSET
A
COMMERCIAL
VEHICLE ENTRANCE
(CHECK POINT)
GATE HOUSE
INSTALLATION BOUNDARY /
LEASE LINE (TYP)
ACCESS GATE
ACCESS GATE
ISSUE FOR BIDLRM DLL
10/15/14
TENSION WIRE
LINE POSTBRACE
TEMPORARY SECURITY FENCE
NOT TO SCALE
END BAY
10'-0" (MAXIMUM)
MULTIPLES OF
10'-0" (MAXIMUM)
CORNER
POST
CHAIN LINK
FABRIC
TRUSS
ROD
RUBBER TIRE FILLED WITH
CONCRETE (TYPICAL)
AIRCRAFT
OPERATION'S AREA
O
D
R
I
V
E
R
H
E
A
A
D
MOEN ST.
C
O
K
S
M
I
H
V
E
A
V
E
N
R
U
E
S
M
I
S M
I T
H
S
T
LEGEND:
CONTRACTOR ACCESS
NOTE:
1. FENCING WITHIN AIRFIELD AREA SHALL BE
PROVIDED WITH 3 STRANDS OF BARBED WIRE AT
THE TOP FENCE.
2. FENCE POST WITHIN THE AIRFIELD AREA SHALL BE
DRIVEN TO A DEPTH OF 3 FEET IN LANDSCAPED
AREAS AND SUPPORTED BY CONCRETE FILLED
RUBBER TIRES ON PAVED AREAS.
TEMPORARY
TRAILER
SEE NOTES 1 & 2,
DETAIL 2 THIS SHEET
LEGEND:
LIMIT OF DISTURBANCE
EXISTING BUILDING
NEW BUILDING
TEMPORARY GATE
TEMPORARY FENCE
DOUBLE SWING GATE
NOT TO SCALE
TEMPORARY SECURITY
FENCE IN AIRFIELD
MULTIPLES OF
10'-0" MAXIMUM
END BAY 10'-0" (MAXIMUM)
BARBED WIRE AT
AIRFIELD AREAS ONLY.
BOTTOM RAIL
LINE POST
TOP RAIL
BRACE
TRUSS
RODS
CHAIN
LINK
FABRIC
FINISH
GRADE
ANGLE OR
CORNER POST
T
Y P
SEE
NOTE 2
16'-30'
12"
9"
MIN
MIN
FINISH GRADE
PLUNGER ROD CATCH
GATE POST
GATE FRAME
GATE POST
TRUSS
RODS
CHAIN
LINK
FABRIC
BRACE
TRUSS
RODS
CHAIN
LINK
FABRIC
LATCH TO
ACCOMMODATE
PADLOCK
BRACE
M I N
CONCRETE
FOOTING (TYP)
TEMPORARY SECURITY FENCE IN PAVEMENT
TEMPORARY SECURITY FENCE IN LANDSCAPED AREAS
BARBED WIRE AT
AIRFIELD AREAS ONLY.
SCALE IN FEET
50' 100'
BARBED WIRE AT
AIRFIELD AREAS ONLY.
ACCESS AND SAFETY NOTES
I. ACCESS AND STAGING
1. ACCESS AND HAUL ROUTES FOR ALL
CONTRACTOR PERSONNEL, VEHICLES,
EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED
ON THE CONSTRUCTION ACCESS PLAN AND ARE
SUBJECT TO THE APPROVAL OF AIRPORT AND
THE CONTRACTING OFFICER. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO
COORDINATE OFF-SITE HAUL ROUTES WITH THE
APPROPRIATE OWNER WHO HAS JURISDICTION
OVER THE AFFECTED ROUTE. ACCESS ROUTES
AND HAUL ROUTES ARE SUBJECT TO CHANGE AT
THE DIRECTION OF THE CONTRACTING OFFICER
AND MAY CHANGE BASED ON OPERATIONAL
REQUIREMENTS OF THE AIRPORT.
2. LOCATION OF ACCESS/HAUL ROADS ARE AS
INDICATED ON THE ACCESS AND SAFETY PLAN
(SHEET G001).
3. ALL HAUL ROADS SHALL BE MAINTAINED SUCH
THAT UNOBSTRUCTED ACCESS WILL BE
PROVIDED AT ALL TIMES FROM THE ROAD TO THE
STAGING AREA AND FROM THE STAGING AREA TO
THE WORK SITE. THE MAINTENANCE OF HAUL
ROADS SHALL BE THE SOLE RESPONSIBILITY OF
THE CONTRACTOR AT NO ADDITIONAL COST TO
THE GOVERNMENT.
4. CONTRACTOR SHALL COORDINATE HIS/HER
ACTIVITIES THROUGHOUT THE PROJECT IN A
MANNER THAT ALLOWS EMERGENCY ACCESS TO
ALL EXISTING ROADWAYS AT ALL TIMES WITHOUT
DELAYS TO EMERGENCY VEHICLE'S RESPONSE
TIME.
5. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE
DUE TO CONSTRUCTION ACTIVITIES,
CONTRACTOR SHALL NOTIFY AIRPORT, POLICE,
LOCAL FIRE AUTHORITY, AND ALL OTHER
EMERGENCY SERVICES OF THE CLOSURE.
6. CONTRACTOR SHALL RESTRICT ALL OPERATIONS
TO AREAS WITHIN THE CONSTRUCTION LIMITS
UNLESS COORDINATED OTHERWISE WITH THE
CONTRACTING OFFICER.
7. CONTRACTOR SHALL MAINTAIN THE ACCESS
ROUTE TO BE FREE FROM DEBRIS CAUSED FROM
CONSTRUCTION ACTIVITY ON A DAILY BASIS.
8. CONTRACTOR IS RESPONSIBLE FOR
ESTABLISHING A STAGING AND STOCKPILE AREA
FOR MATERIALS AND EQUIPMENT. LOCATION OF
CONTRACTOR'S STAGING SHALL BE AS
ILLUSTRATED ON THE CONSTRUCTION ACCESS
PLAN AND IS SUBJECT TO THE APPROVAL OF THE
CONTRACTING OFFICER. CONTRACTOR MAY
SUBMIT ALTERNATIVES TO THE STAGING AREA
LOCATIONS AS SHOWN. CONTRACTOR'S
STAGING AREA IS SUBJECT TO CHANGE AT THE
DIRECTION OF THE CONTRACTING OFFICER.
9. CONTRACTOR SHALL USE STAGING AREA FOR
MATERIAL STORAGE AND VEHICLE PARKING.
CONTRACTOR VEHICLE AND EQUIPMENT SHALL
ONLY BE WITHIN THE DESIGNATED STAGING
AREA.
10.LOCATION OF CONTRACTOR'S STAGING AREA
SHALL BE AS SHOWN ON PLAN. WHEN NOT
ENGAGED IN CONSTRUCTION ACTIVITY, THE
CONTRACTOR'S CONSTRUCTION EQUIPMENT AND
VEHICLES SHALL BE PARKED IN THE
CONTRACTOR'S STAGING AREA.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL
MAY BE SEARCHED BY SECURITY POLICE WHEN
ENTERING THE BASE AND MAY EXPERIENCE
DELAYS.
12.STAGING AREA AND ANY OTHER AREA
DISTURBED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE SEEDED AND
MULCHED, AND RETURNED TO ORIGINAL OR
BETTER CONDITION UPON CONCLUSION OF
CONSTRUCTION ACTIVITIES.
13.CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 48 HOURS TO THE CONTRACTING
OFFICER REGARDING CONSTRUCTION
DELIVERIES PRIOR TO THOSE DELIVERIES.
DELIVERIES SHALL BE SCHEDULED
MONDAY-FRIDAY, 8:00 AM TO 3:00 PM.
14.CONTRACTOR SHALL PROVIDE AND INSTALL A
PROFESSIONALLY PAINTED SIGN, MEETING
CONTRACTING OFFICER APPROVAL, AT THE
CONSTRUCTION ENTRANCE TO DIRECT MATERIAL
SUPPLIERS AND EMPLOYEES TO THE
CONSTRUCTION SITE. THE SIGN SHALL CONFORM
TO DIVISION I OF THE PROJECT'S
SPECIFICATIONS.
15.SITE SHALL BE CLOSED OFF THROUGH THE USE
OF TEMPORARY FENCE AT THE CONTRACTOR'S
EXPENSE.
16. ADDITIONAL SECURITY ACCESS PROCEDURES
WILL BE ADDRESSED AT THE PRE-CONSTRUCTION
MEETING.
II. COORDINATION AND COMMUNICATION
1. CONTRACTOR SHALL APPOINT A CONSTRUCTION
SUPERINTENDENT, SUBJECT TO THE APPROVAL
OF THE CONTRACTING OFFICER, WHO SHALL BE
PRESENT ON THE CONSTRUCTION SITE AT ALL
TIMES DURING WORKING HOURS WHILE
SUBCONTRACTORS ARE ON SITE. THE
SUPERINTENDENT SHALL BE DESIGNATED THE
RESPONSIBLE CONTRACTOR'S REPRESENTATIVE
WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING CONSTANT COORDINATION
BETWEEN ANY SUBCONTRACTORS AND THE
CONTRACTING OFFICER. ALL CONSTRUCTION
ACTIVITIES PLANNED BY THE CONTRACTOR
SHALL BE REVIEWED AND APPROVED BY
AIRPORT AND THE CONTRACTING OFFICER.
3. THE FOLLOWING CONTACT INFORMATION IS
PROVIDED FOR CONTRACTOR'S USE IN CASE OF
AN EMERGENCY:
a. EMERGENCY
b. AIRPORT MANAGER, ANTHONY CEGLIO
631-852-8095
c. VILLAGE OF WESTHAMPTON BEACH
PUBLIC WORKS
631-288-2011
d. POLICE DEPARTMENT
631-288-3444
e. POLICE CHIEF RAYMOND DEAN
631-723-7333
f. FIRE DEPARTMENT
631-723-7333
III. TRAFFIC CONTROL
1. ALL CONSTRUCTION EQUIPMENT AND VEHICLES
SHALL BE MARKED WITH COMPANY PAINT
DESIGNS, INSIGNIAS OR OTHER COMPANY
MARKINGS, WHICH ARE CLEARLY VISIBLE.
2. CONSTRUCTION EQUIPMENT SHALL HAVE
AUTOMATIC SIGNALING DEVICES TO SOUND AN
ALARM WHEN MOVING IN REVERSE.
3. ONLY RUBBER-TIRED VEHICLES SHALL BE
ALLOWED ON EXISTING PAVEMENT THAT IS TO
REMAIN.
4. NO PEDESTRIAN TRAFFIC INSIDE THE
CONSTRUCTION LIMITS WILL BE PERMITTED.
5. ANY DAMAGE TO ROADS AND PAVEMENT DUE TO
CONSTRUCTION EQUIPMENT OR CONSTRUCTION
TRAFFIC SHALL BE REPAIRED TO THEIR ORIGINAL
CONDITION BY THE CONTRACTOR AT HIS/HER
OWN EXPENSE TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
6. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL
CORDON OFF THE CONSTRUCTION WORK AREAS
BY TEMPORARY FENCE APPROVED BY THE
CONTRACTING OFFICER.
7. CONTRACTOR SHALL PROVIDE EACH VEHICLE
WITH A FLAG ATTACHED TO THE VEHICLE WHICH
SHOULD BE AT LEAST 3 FEET SQUARE HAVING
INTERNATIONAL ORANGE AND WHITE
CHECKERED PATTERN SO THAT THE FLAG IS
EASILY VISIBLE.
8. PRIOR TO THE REMOVAL OF BARRICADES AND
TRAFFIC CONTROL DEVICES, THE CONTRACTOR
SHALL REQUEST THE CONTRACTING OFFICER TO
SCHEDULE AN INSPECTION.
9. CONTRACTOR SHALL ATTEND ANY
AIRPORT-MANDATED VEHICLE OPERATOR OR
FOREIGN OBJECT DEBRIS/DAMAGE (FOD)
CONTROL TRAINING COURSE.
IV. AIRFIELD OPERATIONS COORDINATION
1. CONTRACTOR SHALL COMPLY WITH ALL
REQUIREMENTS INDICATED IN FEDERAL AVIATION
ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC)
150/5370-2F, OPERATIONAL SAFETY ON AIRPORTS
DURING CONSTRUCTION (CURRENT EDITION).
COORDINATE AIRPORT SPECIFIC REQUIREMENTS
WITH AIRPORT MANAGEMENT.
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT
OPERATIONS AREA WITHOUT CLEARANCE FROM
AIRPORT AND THE CONTRACTING OFFICER, AND
SHALL CONDUCT WORK IN SUCH A MANNER TO
ENSURE A MINIMUM HINDRANCE TO AVIATION
OPERATIONS. CONTRACTOR SHALL PROVIDE A
MINIMUM NOTICE OF 4 DAYS TO AIRPORT FOR
ACCESS TO AN AIRCRAFT OPERATIONS AREA.
PEDESTRIAN TRAFFIC AND PRIVATELY OWNED
VEHICLES SHALL NOT BE ALLOWED IN THE
AIRCRAFT OPERATIONS AREA (AOA).
V. EQUIPMENT AND STOCKPILE HEIGHT
1. THE MAXIMUM ALLOWABLE HEIGHT OF
CONSTRUCTION EQUIPMENT OPERATING IN AN
AIRCRAFT OPERATIONS AREA IS GOVERNED BY
FEDERAL AVIATION ADMINISTRATION (FAA)
ADVISORY CIRCULAR AC 150/5370-2F AND AC
150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE
AIRFIELD APPROACH SURFACES OR WHEN
CRANES WILL BE USED ON-SITE, CONTRACTOR
SHALL PROVIDE A MINIMUM NOTICE OF 45 DAYS
TO THE CONTRACTING OFFICER AND AIRPORT
PRIOR TO THE START OF CONSTRUCTION TO
COORDINATE THE SUBMITTAL OF FAA FORM
7460-1 TO THE FAA REGIONAL OFFICE. THE
CONTRACTOR SHALL SUBMIT A 7460-1 FOR ANY
EQUIPMENT EXCEEDING 20 FEET ABOVE GROUND
LEVEL. PERMISSION TO USE CRANES SHALL BE
ISSUED BY AIRPORT AND THE CONTRACTING
OFFICER AFTER APPROVAL BY THE FAA.
2. DURING PERIODS OF LOW VISIBILITY, VEHICLES
AND EQUIPMENT SHALL BE IDENTIFIED BY AN
APPROPRIATELY SIZED FLASHING OR STEADY
BURNING AMBER BEACON MOUNTED ON THE
UPPER MOST PART OF THE VEHICLE OR
EQUIPMENT SUCH THAT IT IS CONSPICUOUS
FROM ANY DIRECTION INCLUDING FROM THE AIR.
IF A VEHICLE OR PIECE OF EQUIPMENT IS NOT
FURNISHED WITH SUCH A BEACON, IT MUST BE
ESCORTED INTO THE AIRCRAFT OPERATIONS
AREA BY A PROPERLY LIGHTED VEHICLE.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND
CRANES SHALL HAVE BOOMS OR ARMS LOWERED
TO THEIR LOWEST ELEVATION.
4. CONTRACTOR SHALL NOT STOCKPILE
CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS
IN ANY AREA WHERE SUCH STOCKPILES WOULD
PENETRATE AVIATION SURFACES. ALL
STOCKPILES ADJACENT TO AIRCRAFT
OPERATIONS AREA SHALL BE IDENTIFIED WITH A
360-DEGREE RED OBSTRUCTION LIGHT PLACED
AT THE HIGHEST POINT OF THE STOCKPILE.
STOCKPILING OF MATERIAL WITHIN THE AIRFIELD
SAFETY AREAS IS PROHIBITED. THE
CONTRACTOR SHALL NOT STOCKPILE
CONSTRUCTION MATERIALS, SPOILS DEBRIS, OR
REFUSE IN ANY AREA WHERE SUCH STOCKPILES
ARE WITHIN 250 FEET OF RUNWAY CENTERLINE
OR 75 FEET OF A TAXIWAY CENTERLINE, THE
CONTRACTOR SHALL SUBMIT A 7460-1 FOR ANY
STOCKPILE HEIGHTS EXCEEDING 20 FEET ABOVE
GROUND LEVEL.
5. STOCKPILED MATERIAL SHALL BE CONSTRAINED
IN A MANNER TO PREVENT ITS MOVEMENT BY
WIND FORCES.
VI. EXCAVATION AND TRENCHES
1. CONTRACTOR SHALL COMPLY WITH THE MOST
CURRENT EDITION OF OSHA REGULATIONS AND
THE STATE LAWS CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR
ENSURING THAT ALL EXCAVATION, TRENCHING,
AND SHORING ARE PERFORMED IN A MANNER
THAT COMPLIES WITH LOCAL REGULATIONS AND
OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) REGULATIONS FOR
CONSTRUCTION.
3. CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 48 HOURS TO THE CONTRACTING
OFFICER AND ASSOCIATED UTILITY COMPANIES
AND AGENCIES BEFORE PROCEEDING WITH ANY
EXCAVATION.
4. DEWATERING OF UTILITY TRENCHES AND OTHER
EXCAVATIONS MAY BE REQUIRED.
5. OPEN ONLY THOSE TRENCHES FOR WHICH
MATERIAL IS ON-HAND AND READY FOR PLACING
THEREIN. AS SOON AS POSSIBLE AFTER THE
MATERIAL HAS BEEN PLACED AND WORK
APPROVED, BACKFILL AND COMPACT TRENCHES
AS SPECIFIED.
6. OPEN TRENCHES AND EXCAVATIONS AT THE
CONSTRUCTION SITE SHALL BE PROMINENTLY
MARKED WITH ORANGE BARRICADES WITH
FLASHING AMBER LIGHTS ACCEPTABLE TO THE
CONTRACTING OFFICER.
VII. EROSION AND SEDIMENT CONTROL NOTES
BEST MANAGEMENT PRACTICES
1. CONSTRUCTION ACTIVITY POLLUTION
PREVENTION IS REQUIRED FOR THIS PROJECT.
PREVENTION OF POLLUTION RESULTING FROM
CONSTRUCTION ACTIVITIES SHALL BE
ACCOMPLISHED BY CONTROLLING SOIL EROSION,
WATERWAY SEDIMENTATION, AND AIRBORNE
DUST GENERATION. CONTRACTOR SHALL
ENSURE THAT NO SEDIMENT RESULTING FROM
CONSTRUCTION ACTIVITIES INFRINGES ONTO
ADJACENT PROPERTIES. CONTRACTOR SHALL
COORDINATE EROSION AND SEDIMENT CONTROL
WITH OTHER CONSTRUCTION ENTITIES
PERFORMING WORK ON ADJACENT PROPERTIES.
2. SOIL EROSION AND SEDIMENT CONTROLS ARE
MEASURES USED TO REDUCE THE AMOUNT OF
SOIL PARTICLES THAT ARE CARRIED OFF AN
AREA AND DEPOSITED INTO A DRAINAGE
COLLECTION SYSTEM OR INTO A BODY OF
WATER. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ENSURING THAT EROSION
AND SEDIMENTATION ARE CONTROLLED TO THE
EXTENT PRACTICABLE. ALL APPLICABLE SOIL
EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE IMPLEMENTED AND MAINTAINED
THROUGHOUT THE DURATION OF CONSTRUCTION
ACTIVITIES. PRIOR TO INITIATING CONSTRUCTION
IN AN AREA, ALL TEMPORARY EROSION AND
SEDIMENT CONTROL PRACTICES SHALL BE IN
PLACE. UPON PROJECT COMPLETION ALL
TEMPORARY SOIL EROSION AND SEDIMENT
CONTROL MEASURES SHALL BE REMOVED.
3. THIS PROJECT SHALL BE CONSTRUCTED IN
COMPLIANCE WITH THE SOIL EROSION AND
SEDIMENTATION CONTROL MEASURES AS
ESTABLISHED AND APPROVED BY NEW YORK
STATE DEPARTMENT OF ENVIRONMENTAL
CONSERVATION.
4. TEMPORARY EROSION CONTROL SHALL BE THE
CONTRACTOR'S RESPONSIBILITY, WHO SHALL
UTILIZE APPROPRIATE BEST MANAGEMENT
PRACTICES (BMPS). THOSE BMPS SHALL CONSIST
OF SILT FENCE, WATTLES OR OTHER MEANS TO
CONTROL EROSION AS NEEDED. THE
CONTRACTOR SHALL PROVIDE AND FOLLOW THE
EROSION AND SWPPP PLANS AS NEEDED.
5. CONTRACTOR SHALL PLACE SILT FENCE AS
SHOWN ON DRAWING C-104 PRIOR TO BEGINNING
WORK. THE DEVICES SHALL BE PLACED
DOWN-SLOPE OF DISTURBED AREAS WHERE
SHEET EROSION WOULD OCCUR. SILT FENCE
SHALL BE CLEANED AND REPAIRED WHEN
SEDIMENT BUILDUP REACHES ONE-THIRD OF SILT
FENCE HEIGHT. AFTER SIGNIFICANT RUNOFF
EVENTS, THE CONTRACTOR SHALL INSPECT ALL
EROSION CONTROL STRUCTURES FOR SILT
BUILD-UP THAT INTERFERES WITH THE
PERFORMANCE OF THE EROSION CONTROL
STRUCTURE AND REPAIR OR REPLACE THOSE
STRUCTURES, AS NECESSARY.
6. ALL STORM DRAIN INLETS SHALL BE PROTECTED
BY APPROPRIATE BMPS DURING CONSTRUCTION,
UNTIL ALL SOURCES WITH POTENTIAL FOR
DISCHARGE TO THE INLETS HAVE BEEN
STABILIZED.
7. ALL EXISTING DRAIN INLETS SHALL HAVE SILT
PROTECTION INSTALLED IN ACCORDANCE WITH
DETAILS 3 AND 4 ON DRAWING C507. EROSION
PROTECTION MAY BE REMOVED WHEN
VEGETATION IS ESTABLISHED.
8. TEMPORARY CHECK DAMS MAY BE PLACED IN
DRAINAGE SWALES TO LIMIT THE AMOUNT OF
SEDIMENT THAT TRAVELS DOWNSTREAM. THESE
DEVICES MUST BE MAINTAINED AND THE
SEDIMENT REMOVED BEHIND THE DEVICE ON A
REGULAR BASIS TO REMAIN EFFECTIVE.
9. CONTRACTOR SHALL INSTALL A STABILIZED
CONSTRUCTION ENTRANCE AT LOCATIONS
WHERE CONSTRUCTION TRAFFIC SHALL ENTER
THE PROJECT SITE FROM ROADWAYS AND
PAVEMENTS. SEE DRAWING G-001 AND DETAIL 1
ON DRAWING C-507.
10.SEE DRAWING C-507 FOR ADDITIONAL DETAILS ON
EROSION AND SEDIMENT CONTROL.
CONSTRUCTION ACCESS
THE SITE SHALL HAVE ROADS AND ACCESS DRIVES
OF SUFFICIENT WIDTH AND LENGTH TO PREVENT
SEDIMENT FROM TRACKING ONTO PUBLIC
ROADWAYS. SEDIMENT SHALL BE REMOVED
IMMEDIATELY FROM THE ROAD BY SHOVELING OR
SWEEPING WHEN SEDIMENT IS TRANSPORTED ONTO
A PUBLIC ROAD SURFACE OR OTHER PAVED AREA
BY EQUIPMENT OR VEHICLES EXITING THE
CONSTRUCTION SITE. BULK CLEARING OF
ACCUMULATED SEDIMENT SHALL BE TRANSPORTED
TO A CONTROLLED SEDIMENT DISPOSAL AREA OR
THE POINT OF LIKELY ORIGIN BEFORE THE END OF
EACH WORK DAY. ROAD WASHING SHALL BE
ALLOWED ONLY AFTER THE SEDIMENT IS REMOVED
IN THE ABOVE MANNER.
FINAL GRADING AND CLEAN UP
AFTER COMPLETION OF FINAL GRADING, THE
DISTURBED AREAS SHALL BE REVEGETATED. ALL
TEMPORARY EROSION AND SEDIMENT CONTROL
DEVICES SHALL BE REMOVED UPON PROJECT
COMPLETION. TRAPPED SEDIMENT AND OTHER
DISTURBED SOIL AREAS RESULTING FROM THE
DISPOSITION OF TEMPORARY CONTROL MEASURES
SHALL BE PERMANENTLY STABILIZED TO PREVENT
FURTHER EROSION AND SEDIMENTATION.
PETROLEUM PRODUCTS
ALL ON-SITE VEHICLES SHALL BE MONITORED FOR
PETROLEUM LEAKS AND SHALL RECEIVE PROPER
PREVENTATIVE MAINTENANCE TO REDUCE THE
CHANCE OF LEAKAGE. PETROLEUM PRODUCTS
SHALL BE STORED IN TIGHTLY-SEALED CONTAINERS
THAT ARE CLEARLY LABELED. ALL SPILLS SHALL BE
CLEANED UP IMMEDIATELY AFTER DISCOVERY.
WASTE OIL AND OTHER PETROLEUM PRODUCTS
SHALL NOT BE DISCHARGED ONTO THE GROUND OR
INTO WATER BODIES. PETROLEUM PRODUCTS USED
ON-SITE SHALL BE APPLIED ACCORDING TO THE
MANUFACTURER RECOMMENDATIONS.
STORM WATER PERMIT
CONTRACTOR IS RESPONSIBLE FOR OBTAINING A
STORM WATER PERMIT FOR LAND DISTURBANCE OF
MORE THAN 1 ACRE PRIOR TO CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING
WITH LOCAL AUTHORITIES TO COMPLETE AND
SUBMIT THE STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) FOR APPROVAL.
CONTRACTOR IS RESPONSIBLE FOR ALL FEES
ASSOCIATED WITH SUBMITTAL OF THE PERMIT AT
NO ADDITIONAL COST TO THE GOVERNMENT. THE
PERMITTING PROCESS MAY INCLUDE THE
FOLLOWING:
1. SUBMIT STORM WATER QUALITY PERMIT
APPLICATION FEE TO NEW YORK STATE
DEPARTMENT OF ENVIRONMENTAL
CONSERVATION.
2. SUBMIT AFFIDAVIT STATING PROPERTY OWNER'S
COMMITMENT TO COMPLY WITH STORM WATER
QUALITY MANAGEMENT PLAN AND NYSDEC
REGULATIONS FOR STORM WATER QUALITY
MANAGEMENT.
3. SUBMIT NEW YORK POLLUTION DISCHARGE
ELIMINATION SYSTEM (SPDES) GENERAL PERMIT
NO. GP-01-10-001 AND NOTICE-OF-INTENT (NOI)
FORM TO
NYDEC, BUREAU OF WATER PERMITS
625 BROADWAY, 4TH FLOOR
ALBANY, NY 12233-3505.
VIII. OTHER SAFETY REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN SAFETY
PRACTICES THAT CONFORM TO OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO OBTAIN AND PAY FOR ALL APPLICABLE
PERMITS, FEES AND LICENSES FOR
CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE
INSPECTIONS THROUGHOUT THE PROJECT AND
REMEDY ANY SAFETY CONCERNS IMMEDIATELY.
4. CONTRACTOR SHALL MAINTAIN AT ALL TIMES ONE
FIRE LANE FREE FROM OBSTRUCTION AND
MAINTAIN ACCESS TO THE BASE.
5. THERE SHALL BE NO PERMANENT WASTE SITES
ON AIRPORT PROPERTY. ANY TEMPORARY
WASTE AREA SHALL BE APPROVED BY THE
CONTRACTING OFFICER AND SHALL BE KEPT IN
AN ORDERLY CONDITION. REMOVAL OF WASTE
THAT IS NOT PROPERLY MAINTAINED IS SUBJECT
TO THE DIRECTION OF THE CONTRACTING
OFFICER.
6. DEBRIS-WASTE AND LOOSE MATERIALS CAPABLE
OF CAUSING DAMAGE TO AIRCRAFT AND
HELICOPTER LANDING GEAR, PROPELLERS AND
ROTORS OR OF BEING INGESTED BY JET ENGINES
SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT
MOVEMENT AREAS. MATERIAL DROPPED WITHIN
THESE AREAS SHALL BE REMOVED
CONTINUOUSLY DURING WORKING HOURS.
7. CONTRACTOR SHALL COORDINATE THE
RELOCATION OF ANY CLIENT-OWNED EQUIPMENT
WITH THE CONTRACTING OFFICER.
8. EROSION CONTROL DEVICES SHALL BE USED FOR
THE ACCESS AND HAUL ROUTES, STAGING AREA,
AND ANY MATERIAL STOCKPILES WHEN
NECESSARY TO CONTROL EROSION AND STORM
WATER RUNOFF. SEE EROSION AND SEDIMENT
CONTROL DRAWINGS FOR EROSION AND
SEDIMENT CONTROL REQUIREMENTS.
9. CONTRACTOR SHALL MAKE NECESSARY
PROVISIONS TO LIMIT DUST CAUSED BY
CONSTRUCTION ACTIVITIES TO A LIMIT
ACCEPTABLE TO AIRPORT. THE CONTRACTOR
SHALL CONTROL BLOWING DUST ON THE
PROJECT SITE FROM ANY HAUL ROUTE OR WORK
AREA.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND
FOOD SCRAPS, FROM CONSTRUCTION
PERSONNEL AND ACTIVITIES SHALL BE REMOVED
FROM THE PROJECT LIMITS ON A DAILY BASIS.
11.GASOLINE, DIESEL FUEL, OIL, AND OTHER
HAZARDOUS WASTE RESULTING FROM
CONTRACTOR'S OPERATIONS OR ACTIVITIES
SHALL BE PROPERLY DISPOSED OF IN
ACCORDANCE WITH THE SPECIFICATIONS AND
LOCAL REGULATORY REQUIREMENTS AND
PROPERLY REMOVED FROM THE PROJECT
PROPERTY. IF HAZARDOUS MATERIALS ARE
ENCOUNTERED OR UNCOVERED DURING
CONSTRUCTION ACTIVITIES, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
12.IF CONSTRUCTION REQUIRES THE DISRUPTION
OR DISCONNECTION OF ANY WATER LINES OR
FIRE HYDRANTS ON PROJECT PROPERTY OR
ADJOINING PROPERTY, THE CONTRACTOR SHALL
PROVIDE A MINIMUM ADVANCE NOTICE OF 48
HOURS TO THE LOCAL FIRE AUTHORITY AND ALL
OTHER EMERGENCY SERVICES.
13.FAILURE TO COMPLY WITH AIRPORT AND THE
CONTRACTING OFFICER SAFETY REQUIREMENTS
SHALL RESULT IN THE SUSPENSION OF
CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY
CONCERNS ARE ADDRESSED BY THE
CONTRACTOR TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
14. ANY WORKERS AND EQUIPMENT NOT IN
COMPLIANCE WITH SAFETY PLAN SHALL
IMMEDIATELY BE REMOVED FROM THE WORK
AREA AND SHALL NOT BE PERMITTED TO RETURN
THROUGHOUT THE REMAINDER OF THE PROJECT.
IX. CONTRACTOR SAFETY PLAN SUBMITTAL
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION
SAFETY PLAN WITH HIS/HER PROJECT SCHEDULE.
THE SAFETY PLAN SHALL CONFORM TO DIVISION I
OF THE PROJECT SPECIFICATIONS AND IDENTIFY
THE FOLLOWING ITEMS:
a. PROPOSED ACCESS POINTS, STAGING AREA
AND HAUL ROUTES.
b. TEMPORARY MARKINGS TO BE USED, IF ANY.
c. LOCATION AND TYPE OF BARRICADES OR
OTHER TRAFFIC CONTROL DEVICES.
d. METHODS BY WHICH THE CONTRACTOR WILL
COMMUNICATE WITH THE BASE.
e. AREAS TO WHICH CONSTRUCTION
OPERATIONS SHALL BE LIMITED, ALONG WITH
PROPOSED MEASURES TO MINIMIZE THE
POSSIBILITY OF CONTRACTOR EQUIPMENT
AND WORKERS ACCIDENTALLY ENTERING THE
AIRCRAFT OPERATIONS AREA.
f. PRIMARY CONSTRUCTION SUPERINTENDENT
CONTACT INFORMATION.
g. ANY REQUESTED TEMPORARY AMENDMENTS
TO THE AIRPORT SECURITY PLAN FOR
SPECIAL CONDITION OR MODIFICATIONS.
2. ANY PROPOSED CHANGES TO THE SAFETY PLAN
MUST BE SUBMITTED TO THE CONTRACTING
OFFICER FOR REVIEW PRIOR TO
IMPLEMENTATION.
X. GENERAL NOTES
1. SPECIFIC AREA LIMITS AS INDICATED ON
CONSTRUCTION ACCESS PLAN ARE
APPROXIMATE.
2. THE CONTRACTOR SHALL MAINTAIN ON THE SITE
ONE SET OF RED LINE "AS CONSTRUCTED"
DRAWINGS. THE SET SHALL BE DELIVERED TO
THE CONTRACTING OFFICER NO LATER THAN
SEVEN (7) CALENDAR DAYS AFTER THE FINAL
INSPECTION.
3. ALL WORK SHALL BE CONSTRUCTED IN
COMPLIANCE WITH THE GENERAL PERMIT #
GP-01-10-001 FOR STORMWATER DISCHARGE.
CONTRACTOR IS RESPONSIBLE FOR
COORDINATING ALL REQUIREMENTS WITH STATE
AND LOCAL AUTHORITIES AND SUBMITTING
DOCUMENTS FOR PERMITTING.
4. THE CONTRACTOR SHALL REMOVE STANDING
WATER FROM THE PROJECT WORK LIMITS AS
NECESSARY TO PROTECT THE SUBGRADE,
SUBBASE, AND/OR BASE COURSE OF THE
PROPOSED PAVEMENT AREAS, SURROUNDING
PAVEMENT-TO-REMAIN, OR OTHER COMPLETED
WORKS. NO DIRECT OR SEPARATE PAYMENT
SHALL BE MADE FOR THIS DEWATERING EFFORT
AS THE COST IS INCIDENTAL TO THE PROJECT.
5. THE CONTRACTOR SHALL CONTACT ALL
ASSOCIATED UTILITY COMPANIES AND AGENCIES
PRIOR TO COMMENCEMENT OF WORK FOR THE
LOCATION OF UTILITIES (CALL 811). COORDINATE
ACCESS OF UTILITY COMPANY PERSONNEL WITH
BASE.
6. THE LOCATION OF STRUCTURES AND
UNDERGROUND UTILITIES AS INDICATED HAVE
BEEN OBTAIN FROM EXISTING RECORDS AND
FIELD SURVEYS. UNDERGROUND STRUCTURES
AND UTILITIES MAY BE PRESENT WHICH ARE NOT
DOCUMENTED OR LOCATED. EXISTING UTILITIES
SHOWN ON THE PLANS MAY NOT BE ACCURATE
IN LOCATION, SIZE AND TYPE OF MATERIAL, AND
ARE NOT GUARANTEED TO BE ACCURATE.
7. IT SHALL BE THE CONTRACTOR RESPONSIBILITY
TO FIELD - VERIFY EXISTING STRUCTURES,
UTILITIES AND SURVEY INFORMATION, AND TO
TAKE NECESSARY PRECAUTIONS DURING
DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL FIELD-CHECK ALL EXISTING
CONDITIONS AND BE THOROUGHLY FAMILIAR
WITH THE SITE BEFORE ANY WORK COMMENCES.
IN THE EVENT OF UNEXPECTED UTILITY OR
STRUCTURE INTERFERENCE IS ENCOUNTERED,
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE CONTRACTING OFFICER.
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
WKVB002397
WKVB099052
69623
REPAIR & ADD TO FIRE STATION
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
NOVEMBER 26, 2012 M. FERNANDEZ
L. MONZON D. LENZ
ACCESS AND SAFETY PLAN NOTES
G-002 0
69623-G002.DWG
I:\USAIRNG\69623\CAD\CIVIL\69623-G002.DWG 10/14/2014 2:37 PM FPASCERI
ISSUE FOR BIDLRM DLL
10/15/14
ELECT.
METER
C H
A
N
K
F
E N
C E
A
S
P
H
A
L
T
C O
N C
ASPHALT
GAZEBO
CONC.
PAD
GRASS
LIGHT
BASE
C O
N C
C
O
N
C
P
A
D
UTILITY
POLE
W
V
CONC.
PAD
W
V
ASPHALT
CONC.
CONC.
COVER
TRANS.
CONC.
PAD
DBL. YELLOW LINE
YELLOW LINE
RED LINE
ASPHALT
WHITE LINE
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
WKVB002397
WKVB099052
69623
REPAIR & ADD TO FIRE STATION
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
DECEMBER 02, 2013 M. FERNANDEZ
L. MONZON D. LENZ
EXISTING CONDITIONS PLAN
G-003 0
69623-G003.DWG
SCALE IN FEET
20'10' 40'
EXISTING FIRE STATION
BLDG 300
MOEN STREET
BLDG. 358
BLDG. 235
I:\USAIRNG\69623\CAD\CIVIL\69623-G003.DWG 10/14/2014 2:38 PM FPASCERI
SURVEY INVESTIGATION NOTES:
1. BACKGROUND INFORMATION FOR LANDSIDE
AREAS TAKEN FROM A SURVEY PREPARED BY L.K.
MCLEAN ASSOCIATES P.C. DATED JANUARY 24, 2013.
2. BACKGROUND INFORMATION FOR AIRSIDE AREAS
TAKEN FROM A SURVEY PREPARED BY YOUNG &
YOUNG AND DATED MAY 3, 2011.
4. HORIZONTAL CONTROL IS BASED NEW YORK STATE
PLANE COORDINATE SYSTEM, LONG ISLAND ZONE,
NORTH AMERICAN DATUM (NAD) 1983.
5. VERTICAL DATUM IS REFERENCED TO NORTH
AMERICAN VERTICAL DATUM (NAVD) 1988.
6. CONTRACTOR SHALL RETAIN A LICENSED
SURVEYOR TO SURVEY PROJECT IMPROVEMENTS.
IF BENCHMARKS SHOWN ARE IN AREAS THAT
REQUIRE DEMOLITION, OTHER BENCHMARKS SHALL
BE ESTABLISHED BEFORE DEMOLITION AND
CONSTRUCTION WORK BEGINS. CONTRACTOR
SHALL SUPPLY CERTIFIED, CONTROL POINT DATA
TO CONTRACTING OFFICER AFTER COMPLETION OF
CONSTRUCTION.
EXISTING CONDITIONS NOTES:
1. THE LOCATIONS OF STRUCTURES AND
UNDERGROUND UTILITIES AS INDICATED HAVE BEEN
OBTAINED FROM EXISTING RECORDS AND FIELD
SURVEYS. UNDERGROUND STRUCTURES AND
UTILITIES MAY BE PRESENT WHICH ARE NOT
DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL
EXISTING CONDITIONS AND BE THOROUGHLY
FAMILIAR WITH THE SITE BEFORE ANY WORK
COMMENCES. ANY DISCREPANCIES IN THE
DRAWINGS SHALL BE IMMEDIATELY REPORTED TO
THE CONTRACTING OFFICER BEFORE ANY FURTHER
WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY
TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES,
AND SURVEY INFORMATION, AND TO TAKE
NECESSARY PRECAUTIONS DURING DEMOLITION
AND CONSTRUCTION. CONTRACTOR SHALL VERIFY
EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES,
INCLUDING SERVICE CONNECTIONS TO
UNDERGROUND UTILITIES, PRIOR TO BEGINNING
WORK. CONTRACTOR SHALL CONTACT THE
CONTRACTING OFFICER AND ALL ASSOCIATED
UTILITY COMPANIES AND AGENCIES TO IDENTIFY
THE LOCATION OF UTILITIES. THERE IS NO
GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT
THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF
EXISTING UNDERGROUND UTILITIES INDICATED ARE
REPRESENTATIVE OF THOSE TO BE ENCOUNTERED
DURING CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER OF
OPERATIONAL PLANS. IN THE EVENT AN
UNEXPECTED UTILITY OR STRUCTURE
INTERFERENCE OR CONFLICT IS ENCOUNTERED
DURING CONSTRUCTION, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
ANY UTILITY SERVICES OR STRUCTURES
DISTURBED BY THE CONTRACTOR'S OPERATIONS
SHALL BE RESTORED IMMEDIATELY AT
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
5. THE CONTRACTOR IS RESPONSIBLE FOR
PROTECTING ITEMS NOT TO BE DAMAGED DURING
DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE
DAMAGED OR DISTURBED ITEMS TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
GEOTECHNICAL REFERENCE NOTE:
1. THE SUBSURFACE/GEOTECHNICAL INVESTIGATION
WAS PERFROMED BY GEI CONSULTANTS, INC., PC
ON AUGUST 07, 2013. THE RESULTS OF THE
INVESTIGATION ARE CONTAINED IN THE PROJECT
GEOTECHNICAL REPORT.
LEGEND
BENCH MARK
CP 128
N = 247,622.8800
E = 1,359,649.6103
ELEV. 44.31
BENCH MARK
CP 129
N = 247,906.8900
E = 1,359,932.0881
ELEV. 43.54
B1
B2
B3
B1
ISSUE FOR BIDLRM DLL
A
N
K
F
E N
C E
A
S
P
H
A
L
T
C O
N C
ASPHALT
GAZEBO
GRASS
LIGHT
BASE
C O
N C
C
O
N
C
P
A
D
UTILITY
POLE
W
V
CONC.
PAD
W
V
ASPHALT
CONC.
CONC.
COVER
DBL. YELLOW LINE
YELLOW LINE
RED LINE
POINT TABLE
POINT #
NORTHING
EASTING
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
WKVB002397
WKVB099052
69623
REPAIR & ADD TO FIRE STATION
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
APRIL 18, 2013 M. FERNANDEZ
L. MONZON D. LENZ
DEMOLITION PLAN
CD100 0
69623-CD100.DWG
SCALE IN FEET
20'10' 40'
EXISTING FIRE STATION
BLDG. 300
MOEN STREET
ASPHALT PAVEMENT DEMOLITION
CONCRETE DEMOLITION
FENCE REMOVAL
PAVEMENT SAWCUT
UTILITY REMOVAL
CURB REMOVAL
VEGETATION TO BE REMOVED
BLDG.
BLDG. 235
I:\USAIRNG\69623\CAD\CIVIL\69623-CD100.DWG 10/15/2014 8:34 AM FPASCERI
COORDINATE LIMIT OF
SIDEWALK REMOVAL
WITH UTILITY PLAN.
32.8' ±
SAWCUT
GENERAL DEMOLITION NOTES:
1. ALL SITE DEMOLITION WORK SHALL BE PART OF (P-341)
"ADD" PROJECT, PROJECT NO. WKVB099052.
2. BACKGROUND TAKEN FROM SURVEY INFORMATION
PROVIDED BY L. K.MCLEAN ASSOCIATES, P.C., DATED
JANUARY 2013.
3. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY
MATERIALS SHALL BE DISPOSED OF OFF BASE.
4. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN
ANY OF THE FOLLOWING MATERIALS: AGGREGATE,
CONCRETE, ASPHALT, MASONRY, FOUNDATIONS, REBAR,
FENCE MATERIAL, PIPING, AND MISCELLANEOUS
STRUCTURES. LARGE PIECES OF MATERIAL MAY NEED TO
BE CRUSHED AND/OR BROKEN UP FURTHER IN ORDER TO
BE HAULED AWAY TO THE WASTE DISPOSAL SITE.
5. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND
PAVEMENT REMOVAL WITH PROPOSED SITE PLAN.
6. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT
FULL DEPTH.
7. EXISTING PAVEMENT EDGES SHALL BE SAWCUT IN
LOCATIONS SHOWN TO PROVIDE CLEAN EDGE FOR
CONSTRUCTION OF PROPOSED PAVEMENT.
8. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO
REMAIN SHALL BE REPAIRED OR REMOVED AND REPLACED
AT NO ADDITIONAL COST TO OWNER.
9. CONTRACTOR SHALL PRESERVE EXISTING TREES AND
VEGETATION WHENEVER PRACTICABLE. CONTRACTOR
SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT
SYSTEMS OF SHRUBS, PLANTS AND TREES ALONG THE
AREA OF EXCAVATION.
10.EXISTING VEGETATION AND FACILITIES WHICH ARE NOT
INDICATED TO BE REMOVED SHALL BE PROTECTED FROM
DEMOLITION OR OTHER CONSTRUCTION ACTIVITIES.
11.SPECIAL HANDLING AND CONSIDERATION SHALL BE
REQUIRED FOR EXCAVATED SOILS THOUGHT TO CONTAIN
PETROLEUM-BASED, CONTAMINATED OR HAZARDOUS
SUBSTANCES. CONTRACTOR SHALL PERIODICALLY
MONITOR EXCAVATED SOILS. SOILS SHALL BE TREATED ON
SITE OR DISPOSED OF PROPERLY IN ACCORDANCE WITH
ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS AND THE
PROJECT SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE REMOVAL OF PETROLEUM-BASED,
CONTAMINATED OR HAZARDOUS MATERIALS WITH
CONTRACTING OFFICER.
12.EXCESS SOIL AND UNSUITABLE MATERIAL SHALL BE
DISPOSED OF OFF SITE IN ACCORDANCE WITH LOCAL,
STATE AND FEDERAL REGULATIONS.
13.CONTRACTOR SHALL REMOVE EXISTING SECURITY FENCE
AFTER TEMPORARY SECURITY FENCE IS IN PLACE. A NEW
SECURITY FENCE SHALL BE INSTALLED AFTER EXISTING
PAVEMENT IS REMOVED AND AREA IS STABILIZED.
14.REMOVE EXISTING SHED AND ANY ASSOCIATED
UNDERLYING PAVEMENTS.
15.EXISTING GAZEBO STRUCTURE SHALL BE TEMPORARILY
RELOCATED AND PROTECTED DURING CONSTRUCTION.
TEMPORARY AND FINAL LOCATION OF GAZEBO SHALL BE
COORDINATED WITH BCE OFFICE.
UTILITY DEMOLITION NOTES:
1. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING
OFFICER PRIOR TO REMOVAL OF EXISTING UTILITIES IN
SERVICE. RELOCATED UTILITIES SHALL BE CONSTRUCTED
BEFORE REMOVAL OF EXISTING UTILITIES TO ENSURE
UNINTERRUPTED SERVICE TO THE FACILITIES SERVED BY
THE UTILITY. ALL RELOCATIONS SHALL BE COORDINATED
WITH THE CONTRACTING OFFICER.
2. CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO
REMAIN. ANY DAMAGE TO EXISTING UTILITIES TO REMAIN
SHALL BE IMMEDIATELY REPAIRED AT CONTRACTOR'S
EXPENSE.
3. UTILITY CAPPING METHODS SHALL BE IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS FOR SPECIFIC
PIPE MATERIAL IN SERVICE. ALL CAPPING SHALL BE
INSPECTED AND APPROVED BY THE CONTRACTING
OFFICER.
4. ALL STRUCTURES, VALVES, ETC. TO REMAIN SHALL BE
PROTECTED AND ADJUSTED TO FINISH GRADE.
5. IN AREAS OF UTILITY REMOVAL OF ABANDONED LINES, THE
PORTION OF EXISTING ABANDONED LINES TO REMAIN
SHALL BE CAPPED OR PLUGGED AT REMOVAL INTERFACE.
6. UTILITY STRUCTURES AND MANHOLES TO BE ABANDONED
SHALL HAVE FRAME AND COVER REMOVED, FILLED WITH
SAND, AND BACKFILLED TO MEET PROPOSED GRADE.
7. ALL UTILITIES EQUAL TO OR GREATER THAN 6.00 INCHES IN
DIAMETER AND INDICATED TO BE ABANDONED IN PLACE
SHALL BE FILLED WITH A LOW STRENGTH FLOWABLE FILL.
END SECTIONS SHALL BE PLUGGED TO CONTAIN FLOWABLE
FILL. FLOWABLE FILL SHALL BE A CEMENT/SAND MIX WITH A
COMPRESSIVE STRENGTH OF 75-100 psi.
8. ALL UTILITY SYSTEM STRUCTURES INDICATED TO BE
ABANDONED IN PLACE SHALL BE DISCONNECTED AND
CAPPED.
9. FOR ELECTRICAL AND COMMUNICATIONS DEMOLITION SEE
ELECTRICAL DRAWINGS.
10.CONTRACTOR SHALL REMOVE EXISTING CURB TYPE FRAME
AND GRATE AND REPLACE WITH A DROP INLET TYPE FRAME
AND GRATE. CONTRACTOR SHALL MEASURE EXISTING
DRAINAGE STRUCTURE AND PROVIDE AN APPROPRIATELY
SIZED LIGHT DUTY CAST IRON FRAME AND GRATE.
11.CONTRACTOR SHALL CAP AND ABANDON EXISTING RCP
PIPE UNDER EXISTING BUILDING. PIPE SHALL BE FILLED
WITH FLOWABLE FILL AND CAPPED AT BOTH ENDS.
UTILITY STRUCTURE TO BE REMOVED
C-507
TREE PROTECTION
EXISTING FENCE TO
REMAIN
19 LF EXIST. CURB
TO REMAIN
END CURB REMOVAL
BEGIN CURB
REMOVAL
SEE GENERAL DEMOLITION NOTE 12
EXISTING VAULT TO
REMAIN AND TO BE
PROTECTED
EXISTING INLET TO REMAIN AND TO BE
PROTECTED. SEE UTILITY DEMOLITION
NOTE 10.
EXISTING INLET TO
REMAIN AND TO BE
PROTECTED
SOLAR PANEL AND
POST TO BE REMOVED
COORDINATE REMOVAL
OF STORM PIPE WITH
NEW MH CONSTRUCTION.
SEE DRAWING C-103.
EXISTING MH TO
REMAIN AND TO BE
PROTECTED
END FENCE REMOVAL.
COORDINATE LIMIT OF
FENCE REMOVAL WITH
LOCATION OF NEW GATE.
(SEE DRAWING C-102)
EXISTING FENCE
TO REMAIN
EXISTING CONCRETE
TO REMAIN.
SAWCUT
PAVEMENT
SAWCUT
PAVEMENT
SAWCUT
PAVEMENT
EXISTING FIRE
HYDRANT TO
REMAIN AND TO
BE PROTECTED
REMOVE
EXISTING SHED.
SEE GENERAL
DEMO NOTE 13
STRUCTURE DEMOLITION
LEGEND:
SEE UTILITY
DEMOLITION NOTE 9.
EXISTING MONITORING
WELL TO REMAIN.
RESET EXISTING
COVER TO FINISH
GRADE
ABANDON EXISTING PIPE IN PLACE.
SEE UTILITY DEMOLITION NOTE 11.
REMOVE EXISTING
CONCRETE
GENERATOR PAD. SEE
UTILITY DEMOLITION
NOTE 9
REMOVE FENCE
BEGIN CURB REMOVAL
END CURB REMOVAL
LIMITS OF EXISTING LANDSCAPE
DEMOLITION IS APPROXIMATE.
CONTRACTOR SHALL REMOVE
ENTIRE EXISTING HEDGE ROW.
LANDSCAPE DEMOLITION
SAWCUT
PAVEMENT
SAWCUT
ISSUE FOR BIDLRM DLL
10/15/14
SEE GENERAL DEMOLITION NOTE 14.
EXISTING BOLLARDS TO BE
REMOVED. SEE GENERAL
DEMOLITION NOTE 7
EXISTING BOLLARDS TO BE
REMOVED. SEE GENERAL
DEMOLITION NOTE 7
BOLLARD REMOVAL
A
N
K
F
E N
C E
A
S
P
H
A
L
T
C O
N C
ASPHALT
GAZEBO
GRASS
LIGHT
BASE
C O
N C
C
O
N
C
P
A
D
UTILITY
POLE
W
V
CONC.
PAD
W
V
CONC.
COVER
YELLOW LINE
RED LINE
ASPHALT
WHITE LINE
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
WKVB002397
WKVB099052
69623
REPAIR & ADD TO FIRE STATION
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
DECEMBER 3, 2012 M. FERNANDEZ
L. MONZON D. LENZ
SITE PLAN
C-101 0
69623-C101.DWG
SCALE IN FEET
20'10' 40'
EXISTING FIRE STATION
BLDG 300
MOEN STREET
3780 SF
BUILDING
ADDITION
ENCLOSED STRUCTURE
FOR VEHICLE STORAGE
12' AT / FP
BUILDING
ASPHALT PAVEMENT
CHAIN LINK FENCE
BLDG. 358
BLDG. 235
PEDESTRIAN GATE
LEGEND:
I:\USAIRNG\69623\CAD\CIVIL\69623-C101.DWG 10/14/2014 2:41 PM FPASCERI
9.00'
(TYP.)
T
Y P
LAWN
LAWN
LAWN
5' SIDEWALK
5' SIDEWALK
CONC. CURB
R=5'
R=15'
R=15'
4" WHITE
STRIPING (TYP)
R=5'
R=5'
2.1'
5.0'
C-500
CONNECT
TO EXIST.
PAVEMENT
C-500
CONCRETE CURB
C-500
C-501
C-501
7.57'
14.47' 12.64'
CONNECT GATE
TO EXISTING
FENCE
PEDESTRIAN
GATE
STRUCTURAL STOOP
GENERAL SITE NOTES:
1. BUILDING COORDINATES ARE POINTED TO OR MEASURED AT THE OUTSIDE FACE OF FOUNDATION.
CONTRACTOR SHALL COORDINATE BEARINGS OF BUILDING GRID LINES WITH ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
2. ALL SITE COORDINATES AND DIMENSIONS ARE TO THE FACE OF CURB OR EDGE OF PAVEMENT AND ARE
IN FEET, UNLESS NOTED OTHERWISE.
3. CONTRACTOR SHALL COORDINATE BUILDING ENTRANCES, EGRESSES, WALKWAYS, AND DOORWAY
LOCATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.
4. LOCATION OF STRUCTURAL STOOPS SHALL BE COORDINATED WITH ARCHITECTURAL AND STRUCTURAL
DRAWINGS.
5. SEE STRUCTURAL/MECHANICAL/ELECTRICAL DRAWINGS FOR MISCELLANEOUS SITE EQUIPMENT AND
PADS.
6. ALL PARKING SPACES ARE 9 FEET WIDE AND 18 FEET DEEP EXCEPT FOR ACCESSIBLE PARKING SPACES.
ALL ACCESSIBLE PARKING SPACES ARE 8 FEET WIDE WITH A MINIMUM 5 FEET WIDE ACCESS LANE
ADJACENT TO THEM, OR A MINIMUM 8 FEET WIDE ACCESS LANE FOR VAN ACCESSIBLE PARKING SPACES.
AN ACCESSIBLE PARKING SIGN SHALL BE PLACED AT EACH ACCESSIBLE PARKING SPACE.
7. STANDARD PARKING STALLS SHALL BE STRIPED WITH 4 INCH WIDE WHITE STRIPES. ACCESSIBLE STALLS
AND ACCESS AISLES SHALL BE STRIPED WITH 4 INCH WIDE BLUE STRIPES.
8. ACCESSIBLE RAMP MUST COMPLY WITH FEDERAL, DOD AND LOCAL ADA REQUIREMENTS. MAXIMUM
SLOPE SHALL BE 1:12.
9. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE STANDARDS OF THE CURRENT “MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES”.
10.COORDINATE BICYCLE RACK PAD DIMENSIONS WITH THE BICYCLE RACK MANUFACTURER'S
RECOMMENDATIONS OR REQUIREMENTS. FOR BICYCLE RACK INFORMATION SEE SPECIFICATION 055000.
CONCRETE ANCHORAGE FOR BICYCLE RACK SHALL BE PER MANUFACTURER'S INSTALLATION
PROCEDURE.
STRUCTURAL
STOOP (TYP.)
C-501
8' SIDEWALK
BOLLARD
C-501
BOLLARD
(TYP. OF 2)
CONNECT TO EXIST.
PAVEMENT
CONNECT
TO EXIST.
PAVEMENT
10.5'x6' CONCRETE
EQUIPMENT PAD
(SEE NOTE 5}
2' CURB
OPENING
2'
LAWN
LAWN
18'
(TYP.)
T
Y P
C-500
C-500
BICYCLE RACK
AND CONC. PAD
FOR 2 BICYCLES,
SEE NOTE 10
C-503
MECHANICAL EQUIPMENT
CONCRETE PADS.
(SEE GENERAL NOTE 5 )
4'x18.5' PAD
3'x5' PAD
R=5'
TAPERED
CURB END
C-500
2'
LAWN
LAWN
LAWN
LAWN
LAWN
LAWN
BOLLARDS
10'x8' CONCRETE
EQUIPMENT PAD
(SEE NOTE 5}
CONC. CURB
CONC. CURB
EXIST. CURB
CHAIN LINK
FENCE
CONCRETE SIDEWALK
C-500
LAWN
LAWN
24'x60'
TEMPORARY HOUSING
TRAILER
(SEE NOTES)
TEMPORARY HOUSING TRAILER NOTES :
1. CONTRACTOR TO PROVIDE TEMPORARY HOUSING TRAILER AS MANUFACTURED
BY WILLIAM SCOTSMAN OR APPROVED EQUAL. COORDINATE REQUIRED FLOOR
PLAN AND AMENITIES WITH BCE AND MANUFACTURER.
AMENITIES LIST:
SLEEP 6 INDIVIDUALS
KITCHEN
BATHROOM WITH SHOWER AND ONE TOILET
AIRCONDITIONING AND HEATING
ACCESS STEPS
2. CONTRACTOR SHALL INCLUDE ALL COST ASSOCIATED WITH SUPPLY OF
TEMPORARY HOUSING TRAILER INCLUDING THE FOLLOWING DELIVERY AND
INSTALLATION COSTS:
FUEL SURCHARGE
TIE DOWNS
BLOCK AND LEVELING
VINYL SIDING
UTILITY CONNECTIONS
RETURN FREIGHT
AS WELL AS THE FOLLOWING RETURN COSTS :
FUEL SURCHARGE
TIE DOWN REMOVAL
SKIRT REMOVAL
TEAR DOWN
UTILITY DISCONNECTIONS
RETURN FREIGHT
3. TEMPORARY HOUSING SHALL BE IN PLACE UNTIL BUILDING CONSTRUCTION IS
FULLY COMPLETE.
ISSUE FOR BIDLRM DLL
10/15/14
TAPERED
CURB END
C-500
5'x8' SIDEWALK
GENERAL NOTES:
1. ALL SITE WORK INDICATED IN THIS DRAWING IS
PART OF (P-341) "ADD" PROJECT. PROJECT NO.
WKVB099052. UNLESS INDICATED OTHERWISE.
2. CONTRACTOR SHALL DIVIDE THE COST FOR
TEMPORARY HOUSING AS FOLLOWS:
- 60% COST TO "REPAIR" WKVB002397
- 40% COST TO "ADD" WKVB099052
A
N
K
F
E N
C E
A
S
P
H
A
L
T
C O
N C
ASPHALT
GAZEBO
GRASS
LIGHT
BASE
C O
N C
C
O
N
C
P
A
D
UTILITY
POLE
W
V
CONC.
PAD
W
V
CONC.
COVER
YELLOW LINE
RED LINE
U
C
U C
U C
U
C
U
E
UE UE
UE
UE
UE
U E
UE
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
WKVB002397
WKVB099052
69623
REPAIR & ADD TO FIRE STATION
C O P Y R I G H
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
DECEMBER 3, 2012 M. FERNANDEZ
L. MONZON D. LENZ
UTILITY PLAN
C-102 0
69623-C102.DWG
SCALE IN FEET
20'10' 40'
PROPOSED STORM LINE
PROPOSED FIRE LINE
LEGEND:
PROPOSED SANITARY SEWER LINE
EXISTING FIRE STATION
BLDG. 300
MOEN STREET
3780 SF
BUILDING
ADDITION
PROPOSED UNDERGROUND ELECTRIC
BLDG 358
BLDG 235
PROPOSED MANHOLE
24"
CURB INLET
8" DIP
PIV
WET TAP
CONNECT TO EXISTING
CONNECT
TO EXISTING
I:\USAIRNG\69623\CAD\CIVIL\69623-C102.DWG 10/14/2014 2:41 PM FPASCERI
P
V C
R
C
P
P
P
BEND
RELOCATE CATHODIC
PROTECTION METER, SO IT
DOES NOT INTERFERE NEW
BLDG. DOOR. COORDINATE
NEW LOCATION WITH
CONTRACTING OFFICER.
VEHICLE
STORAGE
CONNECT TO
EXISTING.
INV. = 38.00
P
V
C
MATCH EXISTING
INVERT (VIF)
S
GENERAL UTILITY NOTES:
1. ALL PIPE SIZES ARE IN INCHES UNLESS
INDICATED OTHERWISE.
2. FOR ELECTRICAL UTILITIES SEE DRAWING
E-002.
3. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING ALL BUILDING
CONNECTIONS WITH BUILDING
CONTRACTOR AND THE INFORMATION
PROVIDED ON MECHANICAL AND
ELECTRICAL DRAWINGS FOR EACH
FACILITY.
4. CONTRACTOR SHALL CONTACT THE
CONTRACTING OFFICER AND ALL
ASSOCIATED UTILITY COMPANIES AND
AGENCIES TO IDENTIFY THE LOCATION OF
UTILITIES PRIOR TO COMMENCEMENT OF
WORK.
5. CONTRACTOR SHALL COORDINATE ALL
REQUIRED UTILITY SHUTDOWNS FOR
UTILITY CONNECTIONS WITH THE
CONTRACTING OFFICER.
6. CONNECTION TO EXISTING WATER, GAS,
SEWER, AND STORM MAINS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH ALL
REQUIREMENTS OF ASSOCIATED UTILITY
COMPANIES AND AGENCIES.
7. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING AND PAYING ALL UTILITY
CONNECTION FEES AND OBTAINING ALL
PERMITS REQUIRED FOR THE UTILITY
CONSTRUCTION AND CONNECTIONS. THIS
INCLUDES ALL FEES ASSOCIATED WITH
CONNECTION CHARGES AND METERS.
8. SEE DETAIL 1 ON DRAWING C503 FOR
TYPICAL PIPE TRENCH DETAIL.
9. THE MINIMUM DEPTH OF COVER FOR
UTILITIES SHALL BE AS FOLLOWS UNLESS
INDICATED OTHERWISE:
a. WATER: 48 INCHES
b. FIRE PROTECTION: 48 INCHES
c. ELECTRICAL AND COMMUNICATION:
24 INCHES
d. ALL OTHER UTILITIES: 36 INCHES
10. ALL UNDERGROUND UTILITIES ARE
SUBJECT TO ACCEPTANCE TESTING AND
INSPECTION METHODS DETAILED IN THE
SPECIFICATIONS, WHICH MAY INCLUDE
VIDEO CAMERA INSPECTION.
11. ANY CHANGES TO PROPOSED UTILITY
DESIGN SHALL BE APPROVED BY
CONTRACTING OFFICER.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS
ARE REQUIRED AT ALL TEES, BENDS, OR
ELBOWS OF PRESSURIZED PIPING IN
ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS, AND MANUFACTURER'S
RECOMMENDATIONS. SEE DETAIL 4 ON
DRAWING C504 FOR TYPICAL THRUST
BLOCK DETAIL.
2. WATER LINES SHALL BE INSTALLED A
MINIMUM OF 3.00 FEET BEHIND THE EDGE
OF PAVEMENT OR FACE OF CURB UNLESS
INDICATED OTHERWISE. SEE
SPECIFICATIONS FOR ADDITIONAL
CLEARANCE REQUIREMENTS FOR WATER
PIPING.
3. FIRE HYDRANTS SHALL BE INSTALLED A
MINIMUM OF 3.00 FEET AND A MAXIMUM
OF 6.00 FEET FROM EDGE OF PAVEMENT
OR FACE OF CURB AND A MINIMUM OF 1.00
FEET FROM EDGE OF SIDEWALK UNLESS
INDICATED OTHERWISE. A RADIUS OF 3.00
FEET AROUND HYDRANT SHALL BE KEPT
CLEAR FOR FIRE DEPARTMENT ACCESS.
AREA BETWEEN CURB AND HYDRANTS
SHALL BE KEPT CLEAR OF
OBSTRUCTIONS.
4. CONTRACTOR SHALL COORDINATE THE
INSTALLATION, TESTING, AND INSPECTION
OF ALL DOMESTIC WATER AND FIRE
WATER SYSTEMS WITH THE ASSOCIATED
UTILITY COMPANIES AND AGENCIES. SEE
SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS ON WATER UTILITY
TESTING AND INSPECTION.
SANITARY UTILITY NOTES:
1. ALL SANITARY SEWER BUILDING
CONNECTIONS ARE TO BE MADE USING
6.00 INCH LINES UNLESS INDICATED
OTHERWISE.
2. ALL SANITARY LINES ARE TO BE LAID AT A
UNIFORM SLOPE FROM THE BUILDING
CONNECTIONS TO THE CONNECTING
SEWER AND BETWEEN UTILITY
STRUCTURES.
3. SEWER LINES SHALL BE INSTALLED A
MINIMUM OF 10.00 FEET HORIZONTALLY
FROM ADJACENT WATER LINES UNLESS
INDICATED OTHERWISE. SEE
SPECIFICATIONS FOR ADDITIONAL
CLEARANCE REQUIREMENTS FOR
SANITARY PIPING.
4. SEWER LINES SHALL BE INSTALLED
BELOW WATER LINES WITH A MINIMUM
VERTICAL SEPARATION OF 18 INCHES
UNLESS INDICATED OTHERWISE. SEE
DETAIL 2 ON DRAWING C-503 FOR
SANITARY SEWER…