Attached to
Fort Irwin Replacement Hospital, Fort Irwin, San Bernardino County, California
Solicitation number
W912PL-12-R-0008
Issued by

About this file

Amendment 9 - Option 4 added to solicitation - BACnet Direct Digital Control System

View the file

Other files

File Type Posted
am8_W912PL-12-R-0008.pdf PDF
Amended J A Redacted Version_13Feb2012.pdf PDF
am7_W912PL-12-R-0008.pdf PDF
am7_W912PL-12-R-0008.pdf PDF
PART2of4AM-06_DRAW.pdf PDF
PART4of4AM-06_DRAW.pdf PDF
PART3of4AM-06_DRAW.pdf PDF
PART1of4AM-06_DRAW.pdf PDF
am6_W912PL-12-R-0008.pdf PDF
PART2of3-DRAW-AM 5 - 02-02-12.pdf PDF
PART1of3-DRAW-AM 5 - 02-02-12.pdf PDF
AM-05_SPECS.pdf PDF
PART3of3-DRAW-AM 5 - 02-02-12.pdf PDF
am4_W912PL-12-R-0008.pdf PDF
Hospital Business Forum-Site Walk Attendee list 01-18-12.pdf PDF
am3_W912PL-12-R-0008.pdf PDF
am2_W912PL-12-R-0008.pdf PDF
am1_W912PL-12-R-0008.pdf PDF
J A_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_5A_50shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_5B_150 shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_1F_30 shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_3D_100shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_4B_97shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_4A_150shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_1C_25shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_6E_6shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_1D_50shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_5C_202shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_6F_5shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_2B_173shts_W912PL-12-R-0008.pdf PDF
Spec_Vol 1_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_6D_112shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_6C_100shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_6A_100shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_3A_25shts_W912PL-12-R-0008.pdf PDF
Spec_Vol 3_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_6B_100shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_3C_50shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_1E_50shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_2A_200shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_3E_105shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_1A_50shts_W912PL-12-R-0008.pdf PDF
Spec_Vol 2_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_1B_50shts_W912PL-12-R-0008.pdf PDF
Drwgs_Vol_3B_25shts_W912PL-12-R-0008.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0009 Feb 16, 2012

W912PL

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

P.O. BOX 532711

LOS ANGELES, CA 90053-2325

W912PL-12-R-0008

Dec 23, 2011

FORT IRWIN REPLACEMENT HOSPITAL, FORT IRWIN, SAN BERNARDINO COUNTY, CALIFORNIA

Revised Pages: Section 00 00 10, Pricing Schedule, pages 2 & 3;

Section 00 08 00, Special Contract Requirements, see page 2 for change to clause 52.211-10.

Due date for receipt of proposals is 21 February 2012 at 2PM local time.

FORT IRWIN REPLACEMENT HOSPITAL W912PL-12-R-0008

00 00 10 - 2

AM 09

PRICING SCHEDULE

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO

INCLUDE ALL ATTACHMENTS THERETO

BASE SCHEDULE

LINE

ITEM UNIT OF UNIT TOTAL

NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE

0001 Construct the Hospital Replacement To the 5 Ft. Building Line, Complete 1 JOB LUMP SUM $_____________

0002 Site Work and Utilities Outside the 5 Ft. Building Line, Complete 1 JOB LUMP SUM $_____________

0003 LEED Certification, See Section 01 33 29 and Para. 5, below 1 JOB LUMP SUM $_____________

0004 Alterations to the Existing Mary Walker Clinic, Complete 1 JOB LUMP SUM $_____________

BASE PRICE $_________________________

(TOTAL OF LINE

ITEMS 0001 THRU 0004)

OPTION ITEMS

0005 (OPTION #1)

Interactive TV System, see Section 27 41 16.00 50 and Paragraph 6 below 1 JOB LUMP SUM $____________

0006 (OPTION #2)

Intrusion Detection System, See Section 28 20 01.00 50 and Paragraph 7 below 1 JOB LUMP SUM $___________

0007 (OPTION #3)

Installation of the Intrusion Detection Devices, see Paragraph 8 below 1 JOB LUMP SUM $___________

0008 (OPTION #4)

BACnet Direct Digital Control System, See Paragraph 9 below 1 JOB LUMP SUM $___________

SUBTOTAL OPTION $________________________

ITEMS (TOTAL OF

LINE ITEMS 0005 -0008)

TOTAL PRICE $________________________

(LINE ITEMS 0001-0008)

FORT IRWIN REPLACEMENT HOSPITAL W912PL-12-R-0008

00 00 10 - 3

AM 09

1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may cause the proposal to be determined "unacceptable".

2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.

3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".

4. The successful offeror grants the options listed in the Pricing Schedule to the Government. Option #1 may be exercised any time up to 720 calendar days after the contractor receives the Notice of Award. Option #2 may be exercised any time up to 720 calendar days after the contractor receives the Notice of Award. Option #3 may be exercised any time up to 720 calendar days after the contractor receives the Notice of Award. Option #4 may be exercised any time up to 90 calendar days after the contractor receives the Notice of Award. Exercise of an option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item. No additional time for contract completion will be allowed when an option is exercised. The given contract completion time was formulated to include time necessary to perform all option work.

5. The Offeror shall acknowledge that it understands the contract requirements for achieving a final minimum LEED Platinum certification rating and other Federal sustainability contract requirements. Line Item No. 0003 in the Pricing Schedule is intended to capture the cost of LEED Platinum Certification and construction phase documentation. The validation and final determination of LEED credits earned will be accomplished by the GBCI (USGBC). The contractor will be provided access to the already registered LEED project. Compiling of documentation at LEED Online and use of the LEED Letter Templates is required. LEED design phase documentation has been completed by the designer of record. All LEED construction documentation, submittals and final LEED certification fees will be by the contractor. LEED certification of the project by the Contractor is required. The Government may audit or validate the contractor's LEED documentation during project execution towards the requirement of LEED platinum certification and for consideration of performance requirements, progress payments and contract close out. This will not relieve the Contractor's responsibility to satisfy all LEED documentation requirements as defined by the GBCI (USGBC).

6. Option No. 1 is to provide and install all equipment/devices for the Interactive Television System as described in Section 27 41 16.00 50, paragraphs 2.1.9, 2.9, 2.10, 2.11, 2.12, 2.13, 2.14, 2.15, 2.16, and 2.17.

7. Option No. 2 is to purchase the equipment/devices associated with the video surveillance subsystem or Intrusion Detection Subsystem as described in Section 28 20 01.00 50, paragraphs 2.3, 2.4, 2.6, 2.9, 2.10, 2.11, 2.12, 2.13, 2.14, 2.15, 2.16, 2.16.1, 2.16.2, 2.16.3, 2.17, 2.17.1, 2.17.2, and 2.17.3.

8. Option No. 3 is to install the equipment/devices associated with the video surveillance subsystem or Intrusion Detection Subsystem as purchased in Line Item No. 0006 (Option No.2).

9. Option No. 4 is to provide and install a BACnet Direct Digital Control System for the HVAC that is compliant with the technical specification section 23 09 23.13 20.

10. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

W912PL-12-R-0008

00 08 00 - 1

AM-09

Section 00 08 00 - Special Contract Requirements

Table of Contents

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

MAR 1995)--EFARS

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

52.236-4 PHYSICAL DATA (APR 1984)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS

CONTRACT ADMINISTRATION DATA

CONTRACTOR PERFORMANCE EVALUATIONS

ALTERNATE STRUCTURED APPROACH TO WEIGHTED GUIDELINE METHOD FOR CONSTRUCTION

CONTRACTS (EFARS 15.973-100) (MAY 1995)

ER 415-1-15 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89)

INVOICES (AUG 1991)

AS-BUILT DRAWINGS (PROGRESS PAYMENT) (OCT 1998)

SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF ENGINEERS' UNCLASSIFIED CONTRACTS

(APR 2004)

00 08 00 - 2

Section 00 08 00 - Special Contract Requirements

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1020 calendar days after the contractor receives the notice to proceed. The successful contractor grants the option items listed in the Pricing Schedule to the Government. Option #1 may be exercised any time up to 720 calendar days after receipt of notice of award. Option #2 may be exercised any time up to 720 calendar days after notice of award. Option #3 may be exercised any time up to 720 calendar days after notice of award. Option #4 may be exercised any time up to 90 calendar days after the contractor receives the Notice of Award. Exercise of an option item occurs upon mailing of written notice to the Contractor. Exercise of the option item will be made by the Contracting Officer. The price for exercise of the option item includes all work and effort associated with the scope of that item. No additional time for contract completion will be allowed when an option is exercised. The given contract completion time was formulated to include time necessary to perform all option work. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $12,140.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)--EFARS

(a) This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, 00 08 00 - 3

AM-09

Construction Equipment Ownership and Operating Expense Schedule, Region VII. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent (20%) of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

(b) Weather conditions, the contractor shall make his own investigations as to weather conditions at the site.

(c) Transportation facilities the contractor shall make his own investigations as to transportation facilities. Access ways shall be investigated by the contractor to satisfy himself/herself as to their existence and allowable use.

(d) Other pertinent information. None.

00 08 00 - 4

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

See Attachment No. 6 for Drawing List.

52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:

(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(2) If equipment costs have been allocated to a contract using predetermined rates , those charges will be adjusted to actual costs.

(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

00 08 00 - 5

(4) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of FAR 31.205-11).

(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

(End of Clause)

CONTRACT ADMINISTRATION DATA

The Contract Administration Office for this contract subsequent to award is:

Department of the Army Los Angeles District, Corps of Engineers Fort Irwin Resident Office P.O. Box 10048 Fort Irwin, CA 92310-0326 ATTN: John Rotter Telephone No: 760.380.4388

Payment will be made by:

USACE Finance Center

ATTN: CEFC-AO-P

5270 Integrity Drive Millington, TN 38054-5005

Submit Invoices to:

USACE-Los Angeles District ATTN: Fort Irwin Resident Office C/O John Rotter P.O. Box 10048 5th Street & Avenue F Fort Irwin, CA 92310-0326

CONTRACTOR PERFORMANCE EVALUATIONS

In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $650,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense

00 08 00 - 6

AM-09

requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.

ALTERNATE STRUCTURED APPROACH TO WEIGHTED GUIDELINE METHOD FOR CONSTRUCTION

CONTRACTS (EFARS 15.973-100) (MAY 1995)

The following alternate structured approach shall be used for all fixed-price construction contract actions.

Factor Rate Weight Value

Degree of risk 20 Relative difficulty of work 15 Size of job 15 Period of performance 15 Contractor's investment 5 Assistance by Government 5 Subcontracting 25

Total 100% Based on the circumstances of the procurement action, each of the above factors shall be weighted from .03 to .12 as indicated below. "Value shall be obtained by multiplying the rate by the weight. The Value column when totaled indicates the fair and reasonable profit percentage under the circumstances of the particular procurement. The profit percentage should be multiplied by the total contract costs, including general and administrative costs.

(1) Degree of risk. Where the work involves no risk or the degree of risk is very small, the weighting should be .03;

as the degree of risk increases, the weighting should be increased up to a maximum of .12. Lump sum items shall generally have a higher weight than unit price items; other things to consider include the nature of the work and where it is to be performed. Consider the portion of the work to be done by subcontractors, amount and type of labor included in costs, whether the negotiation is before or after performance of the work, etc. Modifications settled before the facts have much greater risk than those settled after the fact. A weight of .03 is appropriate for after the fact equitable adjustments and/or settlements.

(2) Relative Difficulty of Work: If the work is difficult and complex, the weight should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk.

Some other things to consider are the nature of the work, by whom it is to be done (i.e., subcontractors, consultants), what is the time schedule.

(3) Size of Job. Work of $100,000 or less shall be weighted at .12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05. Work from $5,000,000 to $10,000,000 shall be weighted at .04. Work in excess of $10,000,000 shall be weighted at .03. It should be noted that control of fixed expenses generally improves with increased job magnitude.

(4) Period of Performance. Work not to exceed one month is to be proportionately weighted at .03. Work in excess of 24 months is to be weighted at .12. Durations between one month and 24 months are to be proportionately weighted between .03 and .12.

(5) Contractor's Investment. To be weighted from .03 to .12 on the basis of below average, average and above average. Things to consider include amount of subcontracting, Government-furnished property or data such as surveys, soil tests, method of making progress payments, and any mobilization payment items.

http://www.cpars.navy.mil/�

00 08 00 - 7

(6) Assistance by Government. To be weighted from .12 to .03 on the basis of average to above average. Consider use of Government-owned property, equipment and facilities, and expediting assistance.

(7) Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80% or more of the work is to be subcontracted use .03. The weighting should be increased proportionately to .12 where all the work is performed by the contractor's own forces.

ER 415-1-15 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89)

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Default: Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2 1 1 0 0 0 0 0 1 0 1 1

Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work.

Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor’s schedule workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled “Default (Fixed Price Construction)”.

End of Clause

00 08 00 - 8

AM-09

INVOICES (AUG 1991)

The Government shall pay the Contractor upon submission of proper invoices for supplies delivered and accepted or services rendered and accepted for the portion of work actually performed under this contract. Invoices will be submitted (one hard-copy/ink-signed copy) to the address in Block 26, SF1442, which will be completed at time of award. Invoices shall be submitted on ENG Form 93 which will be provided to the Contractor by the Government

AS-BUILT DRAWINGS (PROGRESS PAYMENT) (OCT 1998)

One-half of one percent of construction award money shall be withheld until the final as-built drawings and CADD files are accepted by the Government.

SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF ENGINEERS' UNCLASSIFIED CONTRACTS (APR 2004)

A. AUTOMATED INFORMATION SYSTEM (AIS) EFFORT

All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The contractor shall have each applicable employee complete a SF-85P and submit to the Los Angeles District, ATTN: CESPL-P.O Box 532711, Los Angeles, California 90053 Security Officer, SGM Jeffrey E. Koontz within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS. Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Los Angeles District Security Officer. For those contractors that do not have a CAGE Code or Facility Security Clearance, the Los Angeles District Security Office will process the investigation in coordination with the Contractor and contract employees.

B. NATIONAL INFRASTRUCTURES EFFORTS

Contractor employees scheduled to access the Homeland Security determined National Infrastructures, i.e., Powerhouses, Switchyards, Locks/Dams or other restricted/sensitive areas are required to submit a State Bureau of Investigation Criminal Records (History) Check from the state where the work will be performed to the Contracting Officer no later than ten (10) working days after contract award. In addition to providing the individual Criminal Records (History) Check, contractor employees scheduled to have access to the National Infrastructures for six (6) months or longer required a favorable Public Trust Background Investigation (SF-85P), which includes fingerprints (FD-258). Contractor employees may have the finger print card (FD-258) completed by local law enforcement anyone qualified in the Los Angeles District Field Offices, or by making an appointment with the District Security Officer, SGM Jeffrey E. Koontz, 213.452.3969. The contractor shall have each applicable employee provide the completed SF-85P and FD-258 to the Los Angeles Security Office as soon as possible after contract award, but definitely prior to the employee being permitted access to the work area.

C. FOREIGN NATIONALS

Contractor employees scheduled to access the Homeland Security determined National Infrastructures, i.e., Powerhouses, Switchyards, Locks/Dams or other restricted/sensitive areas are required to submit a State Bureau of

00 08 00 - 9

AM-09

Investigation Criminal Records (History) in accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers' contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services.) The contractor shall submit to the Division/District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I- 151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).

Classified contracts require the issuance of a DD Form 254 (Department of Defense Contract Security Classification Specification).

(End of Clause)

SF-30 Amendment 9
00 00 10 - Pricing Schedule
00 08 00 - Special Contract Requirements