W912P7-11-B-0006
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
a) The vendor shall provide and install 65 new ceiling mounted patient lifts in Bldg. 200 and 203. The vendor is responsible for providing all associated equipment and connections required for each installation of a fully functional system. Each patient lift shall have minimum rating of 600 lb lifting capacity, a continuous charging feature, and a hand control with scale module. a service module, and a carelift management module. Installation will include all necessary transformers, power supplies, electrical conduit, and all connections to the existing electrical system to be supplied and installed by the vendor to provide a continuously operating system. Connections to above-ceiling power source are required. Connecting to an existing duplex outlet to provide power to the patient lift system is not an acceptable installation. With each new unit installed, the vendor shall provide one (1) new sling and six (6) straps.
b) Patient lifts installation will be in compliance with Patient Safety Alert 10-07, dated 3/22/2010; VHA Directive 2005-019, Seismic Safety of VHA Buildings; VA Handbook Seismic Design Requirements, H-18-8; VA
Master Design Specification 3.05.041 Seismic Restraint Requirements for Non-Structural Components, and this section, General
Requirements. Seismic details of installation will be provided to the Contracting Officer’s Representative (COR) before installation begins. The contractor shall provide the COR with a reflected ceiling plan (RCP) drawn to scale of all rooms in this contract. The RCP shall include the proposed locations of the new patient lift system and privacy curtain tracks, and all HVAC grilles, lighting fixtures, sprinkler heads, privacy curtains, access hatches and any other ceiling fixtures. Architectural AutoCAD floor plan drawings are provided for the vendor to assist in this process. Allow two weeks after all drawings have been submitted to the COR for approval to begin installation. The contractor’s schedule of work and RCP for all rooms must be approved by the COR, before work begins. Phasing:
Only one patient room (area) may be worked on at a time. However, a transition can be made to the next patient room in sequence two days prior to the start of work to allow for staging. Phasing and scheduling changes will be required to be submitted to the COR for approval. The contractor is responsible for performing all repairs to damage caused by installation of the lifts including gypsum board cutting, patching and painting, sealing new wall penetrations, replacement of ceiling tiles and modification of all door headers in cases where the patient track system is extended into adjacent restrooms. Door headers must be modified in a manner to maintain structural integrity.
c) The vendor will be required to replace all privacy curtain tracks in all rooms with a new patient lift being installed. The vendor is required to insure patient privacy is maintained after the installation of the new patient lift system. This will include new curtain tracks to be installed to allow patient privacy to be maintained for each location without interference from patient lift tracks or equipment. Any new curtain tracks to be supplied by the contractor must be the type that uses round bobbins to hang the curtains. See picture file “CurtainTrackBobbin”. Fresh paint will be required where old curtain tracks are removed. Coordinate curtain installation with patient lift installation.
d) The patient lift system shall be installed by personnel certified by the manufacturer to provide the necessary testing and commissioning of each device. The installed patient lift systems shall meet all manufacturer guidelines and specifications prior to final commissioning and acceptance. All installed lifts will be weight tested and commissioned by the vendor representative. The installation shall be inspected by a California licensed Structural
Engineer who will verify the installation meets the requirements of the equipment for this seismic zone. The installation shall meet the checklist of the Patient Alert 10-07 or a check list provided by the vendor and approved by the COR before the patient lift is accepted and turned over to the VA. Contractor shall prevent obstruction of
HVAC grilles, lighting fixtures, sprinkler heads, patient curtains, access hatches, and other overhead fixtures by judicious routing of the patient lift tracks. In all areas where routing of the patient lift tracks is unable to prevent obstruction of these items; the vendor is responsible for the relocation of those items.
e) A HEPA air filter machine system to prevent the spread of dust during retrofit shall be used. Follow infection control procedures, including the use of sticky mats, as outlined in the attached specifications. Barriers to prevent the spreading of dust into adjoining patient care areas must be erected. Please see Infectious
Control Policy 111, a form shall be filled out for each area of work and submitted for approval.
f) An Asbestos Survey/Report will be provided by VAMC to the vendor for review. The VA takes no liability in the accuracy of this report, it shall only be used only as a reference tool, and verification testing should be completed when material is discovered that has a possibility of containing asbestos. The VA will provide material testing upon request, when unidentified material is discovered. If material is determined to be asbestos, the VA will remove the material using its own resources.
g) Provide eighteen (18) hours of customer training to facility users.
The training shall be provided in nine (9) sessions consisting of training on operation and maintenance of the new ceiling mounted patient lifts. Each session shall include no less than 2 hours of hands on training at SFVAMC. The training schedule shall be submitted to the COR for approval.
h) This project shall be completed in 330 calendar days after notice to proceed (NTP).
i) Perform installation of equipment in the following patient rooms/areas in Bldg. 200 and 203 at the SF VAMC. The patient lift tracks shall not be permitted to continuously span multi-bay areas and therefore will require one lift per bay in order to provide adequate coverage. Approximately 16 of the patient rooms listed below have adjacent restrooms, and one patient room has a toilet located within the treatment room (negative pressure room). The contractor shall extend the patient lift tracks into the adjacent restrooms for these patient rooms. The contractor shall verify these rooms on a site walkthrough and adjust his cost proposal accordingly. There are ceiling mounted cameras in rooms B203-2B-61 and B203-2B67. In each room one camera is located in front of the bathroom door and at approximate mid-point location per pdf file
“B203-2B61&67Cameras”. They may need to be relocated in order to complete track installation.
LOCATION LIST
Building Area Room Lift type Number of Lifts
203 1A 39 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 1A 48 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 1A 50 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 1A 61 Single Ceiling Lift w/ scale 1 At least 600lb weight capacity
203 2B 23 Single Ceiling Lift w/ scale 1 At least 600lb weight capacity
203 2B 43 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 2B 45 Double 47 Double
Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 2B 51 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 2B 55 Double 52 Double
Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 2B 53 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 2B 61 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 3B 64 Double Ceiling Lift w/ scale – Enter Bathroom 2
2B At least 600lb weight capacity 203 2B 67 Double Ceiling Lift w/ scale – Enter Bathroom 2
At least 600lb weight capacity 203 3B 23 Quad
22 Quad Ceiling Lift w/ scale – Enter Bathroom 4 At least 600lb weight capacity
203 3B 44 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity
203 Echo Lab 2A 218 (floor plan) 58 (actual)
Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 Eye Clinic 1A 1a-132 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 2A-Radiology 139 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 2A-Radiology 105 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 2A-CT Scanner 151A (floor plan) 143(actual)
Ceiling Lift w/ scale 1 At least 600lb weight capacity
203 2A GI 77 (6 bays) Ceiling Lift w/ scale 6 At least 600lb weight capacity
203 Nuclear Med GB GB-54 (floor plan) GB-53 (actual)
Ceiling Lift w/ scale 1 At least 600lb weight
203 2A GI 71 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 2A GI 72 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 2A GI 74 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 Nuclear Med GB 60 Ceiling Lift w/ scale 1 At least 600lb weight capacity
203 Nuclear Med GB 62 Ceiling Lift w/ scale 1 At least 600lb weight capacity
203 Echo Lab 2A 215 (floor plan) 60 (actual)
Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
203 Echo Lab 2A 211(floor plan) 62B (actual)
Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity
200 ED overflow 3bays (near GA- 200D)
Ceiling Lift w/ scale 3 At least 600lb weight capacity
200 ED GC-116 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 ED GC-115 Ceiling Lift w/ scale 1
200 ED GC-114 Ceiling Lift w/ scale 1
200 ED GC-113 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 ED GC-112 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 ED GC-106 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 ED GC-105 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 ED GC-104 Ceiling Lift w/ scale 1 At least 600lb weight capacity
200 ED GC-103 Ceiling Lift w/ scale – Enter Bathroom (Toilet is in treatment room)
At least 600lb weight capacity 200 Podiatry Clinic
Ground GA-169 Ceiling Lift w/ scale 1
At least 600lb weight capacity
3A-ASU 115 (6 bays) Ceiling Lift w/ scale 6
Total 65
B. Visits to the site by Bidders may be made only by appointment with the
US Army Corps of Engineers Project Manager, Eileen Nixdorf, (415) 503-
6751. There will be a Pre-Bid Site Visit held at the San Francisco VA
Medical Center on Wednesday, August 24, 2011, at 10:00 a.m., Building 6, Room 111. Contact the USACE Project Manager to coordinate for further details.
C. N/A
D. N/A
E. All employees of general contractor and subcontractors shall comply with
VA’s security program and obtain a VA ID badge from VA police. See paragraph 1.35 below for ID badge process. Along with ID Badges all workers must be able to speak and understand English during retrofit.
Retrofit areas as defined by the contract documents will be keyed to a retrofit core when Notice to Proceed is issued. Access to non-retrofit areas is limited to public areas only. Access needed outside of retrofit area (i.e., mechanical rooms) will be provided by COR or his/her representative upon written or verbal request.
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .