W912P7-11-B-0006

R. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

S. Perform other retrofit, alteration and demolition operations in accordance with 29 CFR 1926.

T. N/A.

U. Above Ceiling Permit: Contractors are restricted from working above ceiling without the required Above Ceiling Permit. This is required when working above any ceilings in the Medical Center outside of contained retrofit areas.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the

COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the

Contractor's performance.

B. N/A

C. The Contractor shall, under regulations prescribed by the COR, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any

Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage.

The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. N/A

E. Workmen are subject to rules of Medical Center applicable to their conduct. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of retrofit materials, debris, and vehicles at all times.

Other files

File Type Posted
Bid abstract W912P7-11-B-0006 - UNOFFICIAL.pdf PDF
QA Responses VA Patient Lifts —
SF30 Amendment 0004.pdf PDF
Revised Section B - Pricing Schedule.pdf PDF
Amendment 0003.pdf PDF
QA Responses VA Patient Lifts —
Summary of Docs required in the IFB —
QA Responses VA Patient Lifts —
Typical Installation Sketch 8-30-11.pdf PDF
B203-GB FloorPlan Updated.pdf PDF
FAR 52-228-16.pdf PDF
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
Amendment 0002.pdf PDF
B203-2A FloorPlan Updated.pdf PDF
B200-2A139 RadiologyFloor Ceiling.pdf PDF
B203-3B —
B200-2A105 Floor Ceiling.pdf PDF
B200-ED Floor.pdf PDF
B200-ED OverflowCeiling.pdf PDF
B203-2B —
B203-3B —
B200-ED OverflowFloor.pdf PDF
B203-3B —
CurtainTrackBobbin.JPG JPG image
B203 Section —
B203-2B —
B200-ED Duct Plan —
B203-2B —
B200-ED Ceiling.pdf PDF
B203-2B61 2B67 Cameras.pdf PDF
Amendment 0001 VA Patient Lift - Drawings.pdf PDF
QA Responses VA Patient Lifts —
W912P7-11-B-0006 8-19.pdf PDF
A2.1 FLOOR PLAN.pdf PDF
SF-203-03AR-THIRD FLOOR.pdf PDF
APPX 2 - Patient Safety Alert Design-Installation Checklist.pdf PDF
SF-200-02AR-Second Floor.pdf PDF
APPX 4 - Investigation Request Worksheet.pdf PDF
APPX 3 - Utility Shutdown —
SF-203-01AR-FIRST FLOOR.pdf PDF
SF-203-02AR-SECOND FLOOR PLAN.pdf PDF
SF-200-01AR-FIRST FLOOR.pdf PDF
APPX 1- Infection Control Guidelines 111W-07.pdf PDF
SF-200-0GAR-Ground Floor.pdf PDF
SF-203-0GAR-GROUND FLOOR.pdf PDF
SF-200-03AR-Third Floor.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .