Amendment 0001 VA Patient Lift - Drawings.pdf

PDF 198 KB Posted

Attached to
Patient Lift for the VA Hospital
Solicitation number
W912P7-11-B-0006
Issued by

About this file

Amendment 0001 Drawings

View the file

Other files

File Type Posted
Bid abstract W912P7-11-B-0006 - UNOFFICIAL.pdf PDF
QA Responses VA Patient Lifts —
SF30 Amendment 0004.pdf PDF
Revised Section B - Pricing Schedule.pdf PDF
Amendment 0003.pdf PDF
QA Responses VA Patient Lifts —
Summary of Docs required in the IFB —
QA Responses VA Patient Lifts —
Typical Installation Sketch 8-30-11.pdf PDF
B203-GB FloorPlan Updated.pdf PDF
FAR 52-228-16.pdf PDF
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
Amendment 0002.pdf PDF
B203-2A FloorPlan Updated.pdf PDF
B200-2A139 RadiologyFloor Ceiling.pdf PDF
B203-3B —
B200-2A105 Floor Ceiling.pdf PDF
B200-ED Floor.pdf PDF
B200-ED OverflowCeiling.pdf PDF
B203-2B —
B203-3B —
B200-ED OverflowFloor.pdf PDF
B203-3B —
CurtainTrackBobbin.JPG JPG image
B203 Section —
B203-2B —
B200-ED Duct Plan —
B203-2B —
B200-ED Ceiling.pdf PDF
B203-2B61 2B67 Cameras.pdf PDF
QA Responses VA Patient Lifts —
W912P7-11-B-0006 8-19.pdf PDF
A2.1 FLOOR PLAN.pdf PDF
SF-203-03AR-THIRD FLOOR.pdf PDF
APPX 2 - Patient Safety Alert Design-Installation Checklist.pdf PDF
SF-200-02AR-Second Floor.pdf PDF
APPX 4 - Investigation Request Worksheet.pdf PDF
APPX 3 - Utility Shutdown —
SF-203-01AR-FIRST FLOOR.pdf PDF
SF-203-02AR-SECOND FLOOR PLAN.pdf PDF
SF-200-01AR-FIRST FLOOR.pdf PDF
APPX 1- Infection Control Guidelines 111W-07.pdf PDF
SF-200-0GAR-Ground Floor.pdf PDF
SF-203-0GAR-GROUND FLOOR.pdf PDF
SF-200-03AR-Third Floor.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

San Francisco VA Patient Lift, W912P7-11-B-0006:

1. See attached pages for summary of changes. 2. Please submit a signed copy of amendments with your bid.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

See item 6US Army Engineer District, San Francisco Contracting Division 1455 Market Street, 17th Floor, Suite 1741 San Francisco CA 94103-1398

CODE

W912P7

FACILITY CODE

0001 28 August 2011

W912P7-11-B-0006

19 August 2011

W912P7-11-B-0006 0001

Summary of the changes that are in BOLD within the documents:

1. Pg. 8, para 1.1.A.c – Change indicates that for any new curtains to be provided, they must have round bobbins.

2. Pg. 9, para 1.1.A.h – Change indicates that the Contractor now has an additional 30 days to complete the contract, for a total of 330 calendar days.

3. Pg. 10, para 1.1.A.i – Change indicates that there are cameras installed in the ceiling of Rooms B203-2B-61 and B203-2B-67 that may need to be relocated prior to lift track installation.

4. Pg. 10-12, Location List – List indicates corrections to the actual room numbers for five (5) rooms.

5. Pg. 20-21, para 1.6.P.a.2 – Change indicates work/scheduling restrictions in rooms/bays that are critical to the hospital medical staff and patients.

W912P7-11-B-0006, Amendment 0001, Pages 8 – 12.

all rooms must be approved by the COR, before work begins. Phasing:

Only one patient room (area) may be worked on at a time. However, a transition can be made to the next patient room in sequence two days prior to the start of work to allow for staging. Phasing and scheduling changes will be required to be submitted to the COR for approval. The contractor is responsible for performing all repairs to damage caused by installation of the lifts including gypsum board cutting, patching and painting, sealing new wall penetrations, replacement of ceiling tiles and modification of all door headers in cases where the patient track system is extended into adjacent restrooms. Door headers must be modified in a manner to maintain structural integrity.

c) The vendor will be required to replace all privacy curtain tracks in all rooms with a new patient lift being installed. The vendor is required to insure patient privacy is maintained after the installation of the new patient lift system. This will include new curtain tracks to be installed to allow patient privacy to be maintained for each location without interference from patient lift tracks or equipment. Any new curtain tracks to be supplied by the contractor must be the type that uses round bobbins to hang the curtains. See picture file “CurtainTrackBobbin”. Fresh paint will be required where old curtain tracks are removed. Coordinate curtain installation with patient lift installation.

d) The patient lift system shall be installed by personnel certified by the manufacturer to provide the necessary testing and commissioning of each device. The installed patient lift systems shall meet all manufacturer guidelines and specifications prior to final commissioning and acceptance. All installed lifts will be weight tested and commissioned by the vendor representative. The installation shall be inspected by a California licensed Structural

Engineer who will verify the installation meets the requirements of the equipment for this seismic zone. The installation shall meet the checklist of the Patient Alert 10-07 or a check list provided by the vendor and approved by the COR before the patient lift is accepted and turned over to the VA. Contractor shall prevent obstruction of

HVAC grilles, lighting fixtures, sprinkler heads, patient curtains, access hatches, and other overhead fixtures by judicious routing of the patient lift tracks. In all areas where routing of the patient lift tracks is unable to prevent obstruction of these items; the vendor is responsible for the relocation of those items.

e) A HEPA air filter machine system to prevent the spread of dust during retrofit shall be used. Follow infection control procedures, including the use of sticky mats, as outlined in the attached specifications. Barriers to prevent the spreading of dust into adjoining patient care areas must be erected. Please see

Infectious Control Policy 111, a form shall be filled out for each area of work and submitted for approval.

f) An Asbestos Survey/Report will be provided by VAMC to the vendor for review. The VA takes no liability in the accuracy of this report, it shall only be used only as a reference tool, and verification testing should be completed when material is discovered that has a possibility of containing asbestos. The VA will provide material testing upon request, when unidentified material is discovered. If material is determined to be asbestos, the VA will remove the material using its own resources.

g) Provide eighteen (18) hours of customer training to facility users.

The training shall be provided in nine (9) sessions consisting of training on operation and maintenance of the new ceiling mounted patient lifts. Each session shall include no less than 2 hours of hands on training at SFVAMC. The training schedule shall be submitted to the COR for approval.

h) This project shall be completed in 330 calendar days after notice to proceed (NTP).

i) Perform installation of equipment in the following patient rooms/areas in Bldg. 200 and 203 at the SF VAMC. The patient lift tracks shall not be permitted to continuously span multi-bay areas and therefore will require one lift per bay in order to provide adequate coverage. Approximately 17 of the patient rooms listed below have adjacent restrooms. The contractor shall extend the patient lift tracks into the adjacent restrooms for these patient rooms. The contractor shall verify these rooms on a site walkthrough and adjust his cost proposal accordingly. There are ceiling mounted cameras in rooms B203-2B-61 and B203-2B67. In each room one camera is located in front of the bathroom door and at approximate mid-point location per pdf file “B203-2B61&67Cameras”.

They may need to be relocated in order to complete track installation.

LOCATION LIST

Building Area Room Lift type Number of Lifts

203 1A 39 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 1A 48 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 1A 50 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 1A 61 Single Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 2B 23 Single Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 2B 43 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 45 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 51 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 55 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 53 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 2B 61 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 3B 2B

64 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 67 Double Ceiling Lift w/ scale – Enter Bathroom 2

203 3B 23 Quad 22 Quad

Ceiling Lift w/ scale – Enter Bathroom 4 At least 600lb weight capacity

203 3B 44 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 Echo Lab 2A 218 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 Eye Clinic 1A 1a-132 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 2A-Radiology 139 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 2A-Radiology 105 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 2A-CT Scanner 151A

Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 2A GI 77 (6 bays) Ceiling Lift w/ scale 6 At least 600lb weight capacity

203 Nuclear Med GB GB-54

GB-53

Ceiling Lift w/ scale 1 At least 600lb weight

203 2A GI 71 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 2A GI 72 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 2A GI 74 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 Nuclear Med GB 60 Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 Nuclear Med GB 62 Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 Echo Lab 2A 215 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 Echo Lab 2A 211 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

200 ED overflow 3bays (near GA- 200D)

Ceiling Lift w/ scale 3 At least 600lb weight capacity

200 ED GC-116 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-115 Ceiling Lift w/ scale 1

200 ED GC-114 Ceiling Lift w/ scale 1

200 ED GC-113 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 ED GC-112 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 ED GC-106 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 ED GC-105 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 ED GC-104 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 ED GC-103 Ceiling Lift w/ scale – Enter Bathroom 1

At least 600lb weight capacity 200 Podiatry Clinic

Ground GA-169 Ceiling Lift w/ scale 1

At least 600lb weight capacity

3A-ASU 115 (6 bays) Ceiling Lift w/ scale 6

Total 65

B. Visits to the site by Bidders may be made only by appointment with the

US Army Corps of Engineers Project Manager, Eileen Nixdorf, (415) 503-

6751. There will be a Pre-Bid Site Visit held at the San Francisco VA

Medical Center on Wednesday, August 24, 2011, at 10:00 a.m., Building

6, Room 111. Contact the USACE Project Manager to coordinate for further details.

C. N/A

D. N/A

E. All employees of general contractor and subcontractors shall comply with VA’s security program and obtain a VA ID badge from VA police.

See paragraph 1.35 below for ID badge process. Along with ID Badges all workers must be able to speak and understand English during retrofit. Retrofit areas as defined by the contract documents will be keyed to a retrofit core when Notice to Proceed is issued. Access to non-retrofit areas is limited to public areas only. Access needed outside of retrofit area (i.e., mechanical rooms) will be provided by

COR or his/her representative upon written or verbal request.

F. Prior to commencing work, general contractor shall provide proof that a

OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

all rooms must be approved by the COR, before work begins.

Phasing: Only one patient room (area) may be worked on at a time. However, a transition can be made to the next patient room in sequence two days prior to the start of work to allow for staging. Phasing and scheduling changes will be required to be submitted to the COR for approval. The contractor is responsible for performing all repairs to damage caused by installation of the lifts including gypsum board cutting, patching and painting, sealing new wall penetrations, replacement of ceiling tiles and modification of all door headers in cases where the patient track system is extended into adjacent restrooms. Door headers must be modified in a manner to maintain structural integrity.

c) The vendor will be required to replace all privacy curtain tracks in all rooms with a new patient lift being installed.

The vendor is required to insure patient privacy is maintained after the installation of the new patient lift system. This will include new curtain tracks to be installed to allow patient privacy to be maintained for each location without interference from patient lift tracks or equipment. Any new curtain tracks to be supplied by the contractor must be the type that uses round bobbins to hang the curtains. See picture file “CurtainTrackBobbin”. Fresh paint will be required where old curtain tracks are removed. Coordinate curtain installation with patient lift installation.

d) The patient lift system shall be installed by personnel certified by the manufacturer to provide the necessary testing and commissioning of each device. The installed patient lift systems shall meet all manufacturer guidelines and specifications prior to final commissioning and acceptance.

All installed lifts will be weight tested and commissioned by the vendor representative. The installation shall be inspected by a California licensed Structural Engineer who will verify the installation meets the requirements of the equipment for this seismic zone. The installation shall meet the checklist of the Patient Alert 10-07 or a check list provided by the vendor and approved by the COR before the patient lift is accepted and turned over to the VA.

Contractor shall prevent obstruction of HVAC grilles, lighting fixtures, sprinkler heads, patient curtains, access hatches, and other overhead fixtures by judicious routing of the patient lift tracks. In all areas where routing of the patient lift tracks is unable to prevent obstruction of these items;

the vendor is responsible for the relocation of those items.

e) A HEPA air filter machine system to prevent the spread of dust during retrofit shall be used. Follow infection control procedures, including the use of sticky mats, as outlined in the attached specifications. Barriers to prevent the spreading of dust into adjoining patient care areas must be erected.

Please see Infectious Control Policy 111, a form shall be filled out for each area of work and submitted for approval.

f) An Asbestos Survey/Report will be provided by VAMC to the vendor for review. The VA takes no liability in the accuracy of this report, it shall only be used only as a reference tool, and verification testing should be completed when material is discovered that has a possibility of containing asbestos. The VA will provide material testing upon request, when unidentified material is discovered. If material is determined to be asbestos, the VA will remove the material using its own resources.

g) Provide eighteen (18) hours of customer training to facility users. The training shall be provided in nine (9) sessions consisting of training on operation and maintenance of the new ceiling mounted patient lifts. Each session shall include no less than 2 hours of hands on training at SFVAMC. The training schedule shall be submitted to the COR for approval.

h) This project shall be completed in 330 calendar days after notice to proceed (NTP).

i) Perform installation of equipment in the following patient rooms/areas in Bldg. 200 and 203 at the SF VAMC. The patient lift tracks shall not be permitted to continuously span multi-bay areas and therefore will require one lift per bay in order to provide adequate coverage. Approximately 17 of the patient rooms listed below have adjacent restrooms. The contractor shall extend the patient lift tracks into the adjacent restrooms for these patient rooms. The contractor shall verify these rooms on a site walkthrough and adjust his cost proposal accordingly. There are ceiling mounted cameras in rooms B203-2B-61 and B203-2B67. In each room one camera is located in front of the bathroom door and at approximate mid-point location per pdf file “B203-2B61&67Cameras”. They may need to be relocated in order to complete track installation.

LOCATION LIST

Building Area Room Lift type Number of Lifts

203 1A 39 Double Ceiling Lift w/ scale – Enter Bathroom

203 1A 48 Single Ceiling Lift w/ scale – Enter 1

Bathroom

203 1A 50 Single Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 1A 61 Single Ceiling Lift w/ scale 1

At least 600lb weight capacity

203 2B 23 Single Ceiling Lift w/ scale 1

At least 600lb weight capacity

203 2B 43 Double Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 2B 45 Double Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 2B 51 Double Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 2B 55 Double Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 2B 53 Single Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 2B 61 Double Ceiling Lift w/ scale – Enter Bathroom

203 3B 64 Double Ceiling Lift w/ scale – Enter 2

2B Bathroom

203 2B 67 Double Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 3B 23 Quad

22 Quad

Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 3B 44 Double Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 Echo Lab 2A 218 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 Eye Clinic 1A 1a-132 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 2A-Radiology 139 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 2A-Radiology 105 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 2A-CT Scanner 151A

Ceiling Lift w/ scale 1

At least 600lb weight capacity

203 2A GI 77 (6 bays) Ceiling Lift w/ scale 6

At least 600lb weight capacity

203 Nuclear Med GB GB-54

GB-53

Ceiling Lift w/ scale 1

At least 600lb weight

203 2A GI 71 Ceiling Lift w/ scale – Enter 1

Bathroom

203 2A GI 72 Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 2A GI 74 Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 Nuclear Med GB 60 Ceiling Lift w/ scale 1

At least 600lb weight capacity

203 Nuclear Med GB 62 Ceiling Lift w/ scale 1

At least 600lb weight capacity

203 Echo Lab 2A 215 Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

203 Echo Lab 2A 211 Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

200 ED overflow 3bays (near GA- 200D)

Ceiling Lift w/ scale 3

At least 600lb weight capacity

200 ED GC-116 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 ED GC-115 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 ED GC-114 Ceiling Lift w/ scale 1

200 ED GC-113 Ceiling Lift w/ scale 1

200 ED GC-112 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 ED GC-106 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 ED GC-105 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 ED GC-104 Ceiling Lift w/ scale 1

At least 600lb weight capacity

200 ED GC-103 Ceiling Lift w/ scale – Enter Bathroom

At least 600lb weight capacity

200 Podiatry Clinic Ground

GA-169 Ceiling Lift w/ scale 1

At least 600lb weight capacity

3A-ASU 115 (6 bays) Ceiling Lift w/ scale 6

Total 65

B. Visits to the site by Bidders may be made only by appointment with the US Army Corps of Engineers Project Manager, Eileen

Nixdorf, (415) 503-6751. There will be a Pre-Bid Site Visit held at the San Francisco VA Medical Center on Wednesday, August 24, 2011, at 10:00 a.m., Building 6, Room 111. Contact the USACE

Project Manager to coordinate for further details.

C. N/A

D. N/A

E. All employees of general contractor and subcontractors shall comply with VA’s security program and obtain a VA ID badge from

VA police. See paragraph 1.35 below for ID badge process. Along with ID Badges all workers must be able to speak and understand

English during retrofit. Retrofit areas as defined by the contract documents will be keyed to a retrofit core when Notice to Proceed is issued. Access to non-retrofit areas is limited to public areas only. Access needed outside of retrofit area (i.e., mechanical rooms) will be provided by COR or his/her representative upon written or verbal request.

F. Prior to commencing work, general contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR

1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

O. Coordinate the work for this contract with other retrofit and/or construction operations as directed by VA. This includes the scheduling of traffic and the use of roadways.

P. CONTRACT WORK HOURS and FEDERAL HOLIDAYS:

(a). Standard daily contract work hours at the San Francisco VA

Medical Center (SFVAMC) are from 7:30 AM to 5:00 PM, Pacific

Standard Time (PST), Monday through Friday, with the exception of

Federal Holidays. The contractor shall submit to the Contracting

Officer (CO) for approval, in writing, a notice of its desire to work during any period/hours other than the standard. Notice shall include a detailed description of the type of work to be performed and its location. These “non-standard” hours include Weekends, Holidays, and Evenings. The notice requesting work during non-standard hours shall be submitted not less than two (2) working days prior to each period of work scheduled at times other than normal duty hours to include Federal holidays. Contractors are reminded that patients are generally asleep after 10:00 PM PST. Therefore, approval is subject to the availability of the project manager/COR, the type of work to be performed, the specific hours requested, and the anticipated noise level that will be generated by contractor activity. Under no circumstance will the contractor proceed without express written approval of the Contracting Officer.

1. Work Phasing/Scheduling: Contractor shall work closely with the COR in developing a work schedule for contract performance. Advance coordination by the contractor is critical and required.

2. The work to be performed on this project will include occupied areas; however, arrangements may be made so that the particular area may be blocked off during performance of work if feasible. The contractor shall notify the COR of intent to start work in any specific assigned area. The contractor shall coordinate the work of all activities whereby both the Government and the contractor can continue operations with the least possible interference and inconvenience. In certain critical locations such as the ASU, Nuclear Medicine, and Radiology (2A-CT

Scanner), the Contractor may be limited to 2-day room/bay shutdowns at a time, and the installer would need to return the room/bay back to serviceable condition with all ceiling tiles back into place, and move to another room to start installation and then return to complete the installation. In the B200-3A ASU

6-bays area, the Contractor cannot drill onto the floor slab to install anchoring bolts until after 12 p.m. noon. Subject to patient loads, work may have to be temporarily suspended and resumed and the bay restored to operating conditions.

3. N/A

4. The following is a list of Federal Holidays observed by all

Federal Installations:

New Year's Day, January 1

Martin Luther King, Jr, 3rd Monday in January

Washington's Birthday, 3rd Monday in February

Memorial Day, Last Monday in May

Independence Day, July 4

Labor Day, 1st Monday in September

Columbus Day, 2nd Monday in September

Veterans Day, November 11

Thanksgiving Day, 4th Thursday in November

Christmas Day, December 25

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday. Also included is any date specifically declared by the President of the United

States of America as a National Holiday.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting

Officer.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

W912P7-11-B-0006, Amendment 0001, Pages 20 – 21.

O. Coordinate the work for this contract with other retrofit and/or construction operations as directed by VA. This includes the scheduling of traffic and the use of roadways.

P. CONTRACT WORK HOURS and FEDERAL HOLIDAYS:

(a). Standard daily contract work hours at the San Francisco VA Medical

Center (SFVAMC) are from 7:30 AM to 5:00 PM, Pacific Standard Time (PST), Monday through Friday, with the exception of Federal Holidays. The contractor shall submit to the Contracting Officer (CO) for approval, in writing, a notice of its desire to work during any period/hours other than the standard. Notice shall include a detailed description of the type of work to be performed and its location. These “non-standard” hours include

Weekends, Holidays, and Evenings. The notice requesting work during non-standard hours shall be submitted not less than two (2) working days prior to each period of work scheduled at times other than normal duty hours to include Federal holidays. Contractors are reminded that patients are generally asleep after 10:00 PM PST. Therefore, approval is subject to the availability of the project manager/COR, the type of work to be performed, the specific hours requested, and the anticipated noise level that will be generated by contractor activity. Under no circumstance will the contractor proceed without express written approval of the Contracting

Officer.

1. Work Phasing/Scheduling: Contractor shall work closely with the

COR in developing a work schedule for contract performance. Advance coordination by the contractor is critical and required.

2. The work to be performed on this project will include occupied areas; however, arrangements may be made so that the particular area may be blocked off during performance of work if feasible. The contractor shall notify the COR of intent to start work in any specific assigned area. The contractor shall coordinate the work of all activities whereby both the Government and the contractor can continue operations with the least possible interference and inconvenience. In certain critical locations such as the ASU, Nuclear Medicine, and

Radiology (2A-CT Scanner), the Contractor may be limited to 2-day room/bay shutdowns at a time, and the installer would need to return the room/bay back to serviceable condition with all ceiling tiles back into place, and move to another room to start installation and then return to complete the installation. In the B200-3A ASU 6-bays area, the Contractor cannot drill onto the floor slab to install anchoring bolts until after 12 p.m. noon. Subject to patient loads, work may have to be temporarily suspended and resumed and the bay restored to operating conditions.

3. N/A

4. The following is a list of Federal Holidays observed by all Federal

Installations:

New Year's Day, January 1

Martin Luther King, Jr, 3rd Monday in January

Washington's Birthday, 3rd Monday in February

Memorial Day, Last Monday in May

Independence Day, July 4

Labor Day, 1st Monday in September

Columbus Day, 2nd Monday in September

Veterans Day, November 11

Thanksgiving Day, 4th Thursday in November

Christmas Day, December 25

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday. Also included is any date specifically declared by the President of the United States of

America as a National Holiday.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

File details come from the government source that posted it. Updated .