Amendment 0004 extended due date and bid bond requirement

View the file

Other files

File Type Posted
Bid abstract W912P7-11-B-0006 - UNOFFICIAL.pdf PDF
QA Responses VA Patient Lifts —
Revised Section B - Pricing Schedule.pdf PDF
Amendment 0003.pdf PDF
QA Responses VA Patient Lifts —
Summary of Docs required in the IFB —
QA Responses VA Patient Lifts —
Typical Installation Sketch 8-30-11.pdf PDF
B203-GB FloorPlan Updated.pdf PDF
FAR 52-228-16.pdf PDF
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
Amendment 0002.pdf PDF
B203-2A FloorPlan Updated.pdf PDF
B200-2A139 RadiologyFloor Ceiling.pdf PDF
B203-3B —
B200-2A105 Floor Ceiling.pdf PDF
B200-ED Floor.pdf PDF
B200-ED OverflowCeiling.pdf PDF
B203-2B —
B203-3B —
B200-ED OverflowFloor.pdf PDF
B203-3B —
CurtainTrackBobbin.JPG JPG image
B203 Section —
B203-2B —
B200-ED Duct Plan —
B203-2B —
B200-ED Ceiling.pdf PDF
B203-2B61 2B67 Cameras.pdf PDF
Amendment 0001 VA Patient Lift - Drawings.pdf PDF
QA Responses VA Patient Lifts —
W912P7-11-B-0006 8-19.pdf PDF
A2.1 FLOOR PLAN.pdf PDF
SF-203-03AR-THIRD FLOOR.pdf PDF
APPX 2 - Patient Safety Alert Design-Installation Checklist.pdf PDF
SF-200-02AR-Second Floor.pdf PDF
APPX 4 - Investigation Request Worksheet.pdf PDF
APPX 3 - Utility Shutdown —
SF-203-01AR-FIRST FLOOR.pdf PDF
SF-203-02AR-SECOND FLOOR PLAN.pdf PDF
SF-200-01AR-FIRST FLOOR.pdf PDF
APPX 1- Infection Control Guidelines 111W-07.pdf PDF
SF-200-0GAR-Ground Floor.pdf PDF
SF-203-0GAR-GROUND FLOOR.pdf PDF
SF-200-03AR-Third Floor.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

San Francisco VA Patient Lift, W912P7-11-B-0006: changes/additions are as follows:

1. Bid opening, due date and time is changed to Friday, September 9th and 1pm.

2. Add: FAR clause 52.228-1 -- Bid Guarantee.The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

See item 6US Army Engineer District, San Francisco Contracting Division 1455 Market Street, 17th Floor, Suite 1741 San Francisco CA 94103-1398

CODE

FACILITY CODE

0004 3 Sep 2011

W912P7-11-B-0006

19 Aug 2011

52.228-1 -- Bid Guarantee.

As prescribed in 28.101-2, insert a provision or clause substantially as follows:

Bid Guarantee (Sep 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

28.101-2 -- Solicitation Provision or Contract Clause.

(a) The contracting officer shall insert a provision or clause substantially the same as the provision at 52.228-1, Bid Guarantee, in solicitations or contracts that require a bid guarantee or similar guarantee. For example, the contracting officer may modify this provision --

(1) To set a period of time that is other than 10 days for the return of executed bonds;

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/28.htm#P31_4798� http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_227.htm#P516_101289�

(2) For use in connection with construction solicitations when the agency has specified that only separate bid bonds are acceptable in accordance with 28.101-1(b);

(3) For use in solicitations for negotiated contracts; or

(4) For use in service contracts containing options for extended performance.

(b) The contracting officer shall determine the amount of the bid guarantee for insertion in the provision at 52.228-1 (see 28.102-2(a)). The amount shall be adequate to protect the Government from loss should the successful bidder fail to execute further contractual documents and bonds as required. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/28.htm#P27_3684� http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_227.htm#P516_101289� http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/28.htm#P80_12714�

FAR 52.228-1 -- Bid Guarantee -- Amend 0004.pdf
52.228-1 -- Bid Guarantee.
28.101-2 -- Solicitation Provision or Contract Clause.

File details come from the government source that posted it. Updated .