VA Patient Lift AS OF: 31 August 2011 Page 1 of 6

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P7-11-B-0006

The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.

Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.

Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate.

No. RFP Section Question Response

What is the project cost range? Low and high ends?

High end $1,290,000

As of 10:15am 8/24/11 2 Will CADD files be provided to the contractor?

Once awarded, the VA will provide Architectural CADD files of the floor plans. All other files will be pdf only.

As of 10:15am 8/24/11 As of 9:30am 8/31/11 3 Will a contractor be allowed to store material on site?

No on-site storage allowed. No conex/storage container. Contractors will only be allowed to store material within whatever room they’re currently working, and may stage material a day or two in advance of moving to the next room of work, pending Government approval.

As of 10:15am 8/24/11 4 When do you plan to start construction? The Government plans to start construction in late October/early November.

As of 10:15am 8/24/11 5 Will an offeror be allowed to look at the interstitial space?

The Government will post sample photos of the interstitial space above select rooms, as well as RCPs for the ED and wings 2B and 3B, which should be substantially accurate. Proposals should assume obstruction and conflict with a straight shot.

As of 10:30am 8/24/11 As of 9:30am 8/31/11

Is there a difference in measurement from floor to finished ceiling between the patient bed area and bathrooms?

Yes. Floor-to-ceiling in the patient bed area is approximately 9ft and in the bathrooms it’s approximately 8ft.

As of 10:30am 8/24/11

AS OF: 31 August 2011 Page 2 of 6

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P7-11-B-0006

For rooms that share an adjoining bathroom, will a patient be required to pass from one bedroom through the bathroom and into the adjoining bedroom?

No, however, if the installation includes that, it will be acceptable.

As of 11:00am 8/24/11

In the ASU pre-Op area, there are 9 beds and only 6 lifts?

Correct. Only 6 lifts will be installed. Five lifts on one side and one lift on the other side (same side as the nursing station).

As of 11:15am 8/24/11

In one part of the RFP [Location List] you ask for hoist with scale module, but in another part [General Requirements] you ask for hoist with all modules [scale, service, and carelift management]; please confirm which is correct.

Only the scale module will be required.

As of 9:34am 8/29/11

Please advise what you mean by “Above Ceiling Permit” – apparently a Contractor is required to have this?

An above ceiling permit is not required. A Hot Work Permit will be required for wielding, brazing, etc.

As of 9:34am 8/29/11

Will the facility be acquiring the tracks or will vendor be required to purchase curtain tracks as part of contract?

The contractor needs to provide all new privacy curtain tracks that need to be installed to assure patient privacy after their patient lift installation.

Read Section 1.1.A.c.

As of 10:07am 8/29/11

12 Does the contract require lateral or transverse railings?

See sketches on Typical Installation dated 8/30/2011

As of 1:11pm 8/29/11

Can you please tell me if this solicitation is set aside for small businesses or SDVO’s only? Are you accepting “Open Market” pricing or Contracted pricing only?

This solicitation is set aside for ALL small businesses.

As of 12:00pm 8/30/11

There is some conflict between the drawings and the room list provided (for example, requesting the track to extend in the bathroom but having no bathroom on the drawings. Echo labs 211 & 215.

Correct. There are no bathrooms in the Echo Labs. We are working to revise the Lift Location List and other data associated with it in the solicitation, as well as any discrepancies between an actual room number and the floor plan.

As of 12:00pm 8/30/11 15 I don't see any indication of room layout requirements (XY or Straight).

See sketches on Typical Installation dated 8/30/2011.

AS OF: 31 August 2011 Page 3 of 6

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P7-11-B-0006

As of 12:00pm 8/30/11 16 The number of lifts per track can't exceed one. However, there are several requests to have two lifts. Please advise.

Only the double bed patient rooms have this requirement. Each lift should have its own track system, but one joint track leading into the bathroom (where required). This also applies to the Quad room 3B-22.

As of 12:00pm 8/30/11 17 The first set of drawings posted with the solicitation were dated later than the drawings posted in the first amendment.

Which are more accurate?

Response Pending.

Can a vendor provide two motors per lift to meet the 600lb requirement?

The Government needs to maintain the 600 pound capacity of the patient lift.

The SF VAMC does not have an objection if two motors have to be used to achieve the 600 pound capability.

18 As of 12:00pm 8/30/11

What are the bonding requirements for subject project?

Per FAR 52.228-16 we will be requiring a performance and payment bond. Will be added via amendment.

As of 1:20pm 8/30/11

AS OF: 31 August 2011 Page 4 of 6

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P7-11-B-0006

AS OF: 31 August 2011 Page 5 of 6

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P7-11-B-0006

AS OF: 31 August 2011 Page 6 of 6

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P7-11-B-0006

Other files

File Type Posted
Bid abstract W912P7-11-B-0006 - UNOFFICIAL.pdf PDF
QA Responses VA Patient Lifts —
SF30 Amendment 0004.pdf PDF
Revised Section B - Pricing Schedule.pdf PDF
Amendment 0003.pdf PDF
QA Responses VA Patient Lifts —
Summary of Docs required in the IFB —
Typical Installation Sketch 8-30-11.pdf PDF
B203-GB FloorPlan Updated.pdf PDF
FAR 52-228-16.pdf PDF
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
Amendment 0002.pdf PDF
B203-2A FloorPlan Updated.pdf PDF
B200-2A139 RadiologyFloor Ceiling.pdf PDF
B203-3B —
B200-2A105 Floor Ceiling.pdf PDF
B200-ED Floor.pdf PDF
B200-ED OverflowCeiling.pdf PDF
B203-2B —
B203-3B —
B200-ED OverflowFloor.pdf PDF
B203-3B —
CurtainTrackBobbin.JPG JPG image
B203 Section —
B203-2B —
B200-ED Duct Plan —
B203-2B —
B200-ED Ceiling.pdf PDF
B203-2B61 2B67 Cameras.pdf PDF
Amendment 0001 VA Patient Lift - Drawings.pdf PDF
QA Responses VA Patient Lifts —
W912P7-11-B-0006 8-19.pdf PDF
A2.1 FLOOR PLAN.pdf PDF
SF-203-03AR-THIRD FLOOR.pdf PDF
APPX 2 - Patient Safety Alert Design-Installation Checklist.pdf PDF
SF-200-02AR-Second Floor.pdf PDF
APPX 4 - Investigation Request Worksheet.pdf PDF
APPX 3 - Utility Shutdown —
SF-203-01AR-FIRST FLOOR.pdf PDF
SF-203-02AR-SECOND FLOOR PLAN.pdf PDF
SF-200-01AR-FIRST FLOOR.pdf PDF
APPX 1- Infection Control Guidelines 111W-07.pdf PDF
SF-200-0GAR-Ground Floor.pdf PDF
SF-203-0GAR-GROUND FLOOR.pdf PDF
SF-200-03AR-Third Floor.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .