Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
VA Patient Lifts
FFP
Furnish all the labor, materials and equipment necessary to supply and install the "patient lifts" referenced in the attached plans and specs. Work shall be performed in accordance with the attached statement of work and contract clauses.
FOB: Destination
PURCHASE REQUEST NUMBER: W62A2B12308180
NET AMT
0001 28 Each Supply/Install ceiling lifts +
FFP
Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation. Extend ceiling tracks into adjoining bathrooms. Includes modification of the ceiling/walls to install equipment and repairs to door frames, paint, and other materials.
0002 28 Each Supply/Install ceiling lifts
FFP
Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation.
0003 3 Each OPTION Bldg 200, ED
FFP
Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation, in Bldg 200, ED (Rooms GC-104 and GC-103) and Podiatry Clinic.
0004 3 Each OPTION Bldg 200, 3A-ASU
FFP
Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation, in Bldg 200, 3A-ASU.
0005 3 Each OPTION Bldg 200, 3A-ASU
FFP
Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation, in Bldg 200, 3A-ASU.
Total bid for line items 0001 – 0002: $_________________________________
Total bid for line items 0003 – 0005: $_________________________________
Grand total bid for line items 0001 – 0005: $_________________________________
NOTES:
1. Items marked with * are estimated quantities. The Contractor will be paid based on actual amounts. Contractor is responsible for tracking actual quantities and providing proof as required.
2. Prices must be submitted on all individual items of this Pricing Schedule. Bids that do not contain prices for all individual items will be considered “nonresponsive” and ineligible for award.
3. If a bid or modification to a bid is submitted and provides for a lump sum adjustment to the total bid, the application of the lump sum adjustment to each item in the bidding schedule must be stated, or if it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the bidding schedule.
4. The bidder shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.
5. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and extension, the unit price will be considered to be the price.
6. The lump sum “LS” line items above are not “estimated quantity” line items.
7. ARITHMETIC DISCREPANCIES. (a) For the purpose of initial evaluation of bids/offers, the following will be utilized in resolving arithmetic discrepancies found on the face of the Pricing Schedule as submitted by bidders.
(1) Obviously misplaced decimal points will be corrected;
(2) In cases of discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump sum and extended prices will be corrected;
(b) For the purpose of bid/offer evaluation, the Government will proceed on the assumption that the bidder intends the bid/offer to be evaluated on basis of the unit prices, the total arrived at by resolution of arithmetic discrepancies as provided above and the bid/offer will be so reflected on the abstract of bids/offers.
File details come from the government source that posted it. Updated .