W912P7-11-B-0006 8-19.pdf

PDF 376 KB Posted

Attached to
Patient Lift for the VA Hospital
Solicitation number
W912P7-11-B-0006
Issued by

About this file

Invitation for Bid SF33. Note Site Visit set for 24 August 2011 10 00am Building 6 Room111.

View the file

Other files

File Type Posted
Bid abstract W912P7-11-B-0006 - UNOFFICIAL.pdf PDF
QA Responses VA Patient Lifts —
SF30 Amendment 0004.pdf PDF
Revised Section B - Pricing Schedule.pdf PDF
Amendment 0003.pdf PDF
QA Responses VA Patient Lifts —
Summary of Docs required in the IFB —
QA Responses VA Patient Lifts —
Typical Installation Sketch 8-30-11.pdf PDF
B203-GB FloorPlan Updated.pdf PDF
FAR 52-228-16.pdf PDF
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
W912P7-11-B-0006 8-26 —
Amendment 0002.pdf PDF
B203-2A FloorPlan Updated.pdf PDF
B200-2A139 RadiologyFloor Ceiling.pdf PDF
B203-3B —
B200-2A105 Floor Ceiling.pdf PDF
B200-ED Floor.pdf PDF
B200-ED OverflowCeiling.pdf PDF
B203-2B —
B203-3B —
B200-ED OverflowFloor.pdf PDF
B203-3B —
CurtainTrackBobbin.JPG JPG image
B203 Section —
B203-2B —
B200-ED Duct Plan —
B203-2B —
B200-ED Ceiling.pdf PDF
B203-2B61 2B67 Cameras.pdf PDF
Amendment 0001 VA Patient Lift - Drawings.pdf PDF
QA Responses VA Patient Lifts —
A2.1 FLOOR PLAN.pdf PDF
SF-203-03AR-THIRD FLOOR.pdf PDF
APPX 2 - Patient Safety Alert Design-Installation Checklist.pdf PDF
SF-200-02AR-Second Floor.pdf PDF
APPX 4 - Investigation Request Worksheet.pdf PDF
APPX 3 - Utility Shutdown —
SF-203-01AR-FIRST FLOOR.pdf PDF
SF-203-02AR-SECOND FLOOR PLAN.pdf PDF
SF-200-01AR-FIRST FLOOR.pdf PDF
APPX 1- Infection Control Guidelines 111W-07.pdf PDF
SF-200-0GAR-Ground Floor.pdf PDF
SF-203-0GAR-GROUND FLOOR.pdf PDF
SF-200-03AR-Third Floor.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 01:00 PM local t ime 07 Sep 2011

X

A X B X C

D

EX

X G F 59 - 72

73 - 75 H 76

Rick.P.Vredenburg@usace.army .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 76

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912P7 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

RICK P VREDENBURG 415/503-6986

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 42 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

44 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 45 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

46 - 54

PART II - CO NTRACT CLAUSES

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

55 - 58

6. REQUISITION/PURCHASE NO.

W62A2B12308180

5. DATE ISSUED

19 Aug 2011

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912P7-11-B-0006

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

VA Patient Lifts

FFP

Furnish all the labor, materials and equipment necessary to supply and install the "patient lifts" referenced in the attached plans and specs. Work shall be performed in accordance with the attached statement of work and contract clauses.

FOB: Destination

PURCHASE REQUEST NUMBER: W62A2B12308180

NET AMT

0001 29 Each Supply/Install ceiling lifts +

FFP

Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation. Extend ceiling tracks into adjoining bathrooms. Includes modification of the ceiling/walls to install equipment and repairs to door frames, paint, and other materials.

0002 27 Each Supply/Install ceiling lifts

FFP

Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation.

0003 3 Each OPTION Bldg 200, ED

FFP

Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation, in Bldg 200, ED (Rooms GC-104 and GC-103) and Podiatry Clinic.

0004 3 Each OPTION Bldg 200, 3A-ASU

FFP

Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation, in Bldg 200, 3A-ASU.

0005 3 Each OPTION Bldg 200, 3A-ASU

FFP

Supply/Install new 600lb capacity ceiling lifts with scales included and associated new curtain installation, in Bldg 200, 3A-ASU.

Total bid for line items 0001 – 0002: $_________________________________

Total bid for line items 0003 – 0005: $_________________________________

Grand total bid for line items 0001 – 0005: $_________________________________

NOTES:

1. Items marked with * are estimated quantities. The Contractor will be paid based on actual amounts. Contractor is responsible for tracking actual quantities and providing proof as required.

2. Prices must be submitted on all individual items of this Pricing Schedule. Bids that do not contain prices for all individual items will be considered “nonresponsive” and ineligible for award.

3. If a bid or modification to a bid is submitted and provides for a lump sum adjustment to the total bid, the application of the lump sum adjustment to each item in the bidding schedule must be stated, or if it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the bidding schedule.

4. The bidder shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.

5. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and extension, the unit price will be considered to be the price.

6. The lump sum “LS” line items above are not “estimated quantity” line items.

7. ARITHMETIC DISCREPANCIES. (a) For the purpose of initial evaluation of bids/offers, the following will be utilized in resolving arithmetic discrepancies found on the face of the Pricing Schedule as submitted by bidders.

(1) Obviously misplaced decimal points will be corrected;

(2) In cases of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump sum and extended prices will be corrected;

(b) For the purpose of bid/offer evaluation, the Government will proceed on the assumption that the bidder intends the bid/offer to be evaluated on basis of the unit prices, the total arrived at by resolution of arithmetic discrepancies as provided above and the bid/offer will be so reflected on the abstract of bids/offers.

Section C - Descriptions and Specifications

STATEMENT OF WORK

SAN FRANCISCO VETERANS AFFAIRS MEDICAL CENTER

PATIENT CEILING LIFTS

CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

D.1 SECTION 01 00 00 GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEMS

1.4 SECURITY REQUIREMENTS

1.5 FIRE SAFETY

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 INFECTION PREVENTION MEASURES

1.9 DISPOSAL AND RETENTION

1.10 ELECTRICAL INSTALLATIONS

1.11 RESTORATION

1.15 AS-BUILT DRAWINGS

1.16 USE OF ROADWAYS

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.19 TEMPORARY USE OF EXISTING ELEVATORS

1.24 INSTRUCTIONS

1.27 RELOCATED EQUIPMENT OR ITEMS

1.34 PARKING

1.35 ID BADGES

1.36 RETROFIT SCHEDULE

1.37 DAILY LOGS

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.

a) The vendor shall provide and install 65 new ceiling mounted patient lifts in Bldg. 200 and 203. The vendor is responsible for providing all associated equipment and connections required for each installation of a fully functional system. Each patient lift shall have minimum rating of 600 lb lifting capacity, a continuous charging feature, a hand control with scale module, a service module, and a carelift management module. Installation will include all necessary transformers, power supplies, electrical conduit, and all connections to the existing electrical system to be supplied and installed by the vendor to provide a continuously operating system. Connections to above-ceiling power source are required. Connecting to an existing duplex outlet to provide power to the patient lift system is not an acceptable installation. With each new unit installed, the vendor shall provide one (1) new sling and six (6) straps.

b) Patient lifts installation will be in compliance with Patient Safety Alert 10-07, dated 3/22/2010; VHA Directive 2005-019, Seismic Safety of VHA Buildings; VA Handbook Seismic Design Requirements, H-18-8; VA

Master Design Specification 3.05.041 Seismic Restraint Requirements for Non-Structural Components, and this section, General

Requirements. Seismic details of installation will be provided to the Contracting Officer’s Representative (COR) before installation begins. The contractor shall provide the COR with a reflected ceiling plan (RCP) drawn to scale of all rooms in this contract. The RCP shall include the proposed locations of the new patient lift system and privacy curtain tracks, and all HVAC grilles, lighting fixtures, sprinkler heads, privacy curtains, access hatches and any other ceiling fixtures. Architectural AutoCAD floor plan drawings are provided for the vendor to assist in this process. Allow two weeks after all drawings have been submitted to the COR for approval to begin installation. The contractor’s schedule of work and RCP for all rooms must be approved by the COR, before work begins. Phasing:

Only one patient room (area) may be worked on at a time. However, a transition can be made to the next patient room in sequence two days prior to the start of work to allow for staging. Phasing and scheduling changes will be required to be submitted to the COR for approval. The contractor is responsible for performing all repairs to damage caused by installation of the lifts including gypsum board cutting, patching and painting, sealing new wall penetrations, replacement of ceiling tiles and modification of all door headers in cases where the patient track system is extended into adjacent restrooms. Door headers must be modified in a manner to maintain structural integrity.

c) The vendor will be required to replace all privacy curtain tracks in all rooms with a new patient lift being installed. The vendor is required to insure patient privacy is maintained after the installation of the new patient lift system. This will include new curtain tracks to be installed to allow patient privacy to be maintained for each location without interference from patient lift tracks or equipment. Fresh paint will be required where old curtain tracks are removed. Coordinate curtain installation with patient lift installation.

d) The patient lift system shall be installed by personnel certified by the manufacturer to provide the necessary testing and commissioning of each device. The installed patient lift systems shall meet all manufacturer guidelines and specifications prior to final commissioning and acceptance. All installed lifts will be weight tested and commissioned by the vendor representative. The installation shall be inspected by a California licensed Structural

Engineer who will verify the installation meets the requirements of the equipment for this seismic zone. The installation shall meet the checklist of the Patient Alert 10-07 or a check list provided by the vendor and approved by the COR before the patient lift is accepted and turned over to the VA. Contractor shall prevent obstruction of

HVAC grilles, lighting fixtures, sprinkler heads, patient curtains, access hatches, and other overhead fixtures by judicious routing of the patient lift tracks. In all areas where routing of the patient lift tracks is unable to prevent obstruction of these items; the vendor is responsible for the relocation of those items.

e) A HEPA air filter machine system to prevent the spread of dust during retrofit shall be used. Follow infection control procedures, including the use of sticky mats, as outlined in the attached specifications. Barriers to prevent the spreading of dust into adjoining patient care areas must be erected. Please see Infectious

Control Policy 111, a form shall be filled out for each area of work and submitted for approval.

f) An Asbestos Survey/Report will be provided by VAMC to the vendor for review. The VA takes no liability in the accuracy of this report, it shall only be used only as a reference tool, and verification testing should be completed when material is discovered that has a possibility of containing asbestos. The VA will provide material testing upon request, when unidentified material is discovered. If material is determined to be asbestos, the VA will remove the material using its own resources.

g) Provide eighteen (18) hours of customer training to facility users.

The training shall be provided in nine (9) sessions consisting of training on operation and maintenance of the new ceiling mounted patient lifts. Each session shall include no less than 2 hours of hands on training at SFVAMC. The training schedule shall be submitted to the COR for approval.

h) This project shall be completed in 300 calendar days after notice to proceed (NTP).

i) Perform installation of equipment in the following patient rooms/areas in Bldg. 200 and 203 at the SF VAMC. The patient lift tracks shall not be permitted to continuously span multi-bay areas and therefore will require one lift per bay in order to provide adequate coverage. Approximately 17 of the patient rooms listed below have adjacent restrooms. The contractor shall extend the patient lift tracks into the adjacent restrooms for these patient rooms. The contractor shall verify these rooms on a site walkthrough and adjust his cost proposal accordingly.

LOCATION LIST

Building Area Room Lift type Number of Lifts

203 1A 39 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 1A 48 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 1A 50 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 1A 61 Single Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 2B 23 Single Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 2B 43 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 45 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 51 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 55 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 53 Single Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

203 2B 61 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 3B 64 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 2B 67 Double Ceiling Lift w/ scale – Enter Bathroom 2 At least 600lb weight capacity

203 3B 23 Quad Ceiling Lift w/ scale – Enter Bathroom 4 At least 600lb weight capacity

203 3B 44 Double Ceiling Lift w/ scale – Enter Bathroom 2

203 Echo Lab 2A 218 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 Eye Clinic 1A 1a-132 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 2A-Radiology 139 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 2A-Radiology 105 Ceiling Lift w/ scale 1

At least 600lb weight capacity 200 2A-CT Scanner 151A Ceiling Lift w/ scale 1

At least 600lb weight capacity 203 2A GI 77 (6 bays) Ceiling Lift w/ scale 6

At least 600lb weight capacity 203 GB GB-54 Ceiling Lift w/ scale 1

At least 600lb weight 203 2A GI 71 Ceiling Lift w/ scale – Enter Bathroom 1

At least 600lb weight capacity 203 2A GI 72 Ceiling Lift w/ scale – Enter Bathroom 1

At least 600lb weight capacity 203 2A GI 74 Ceiling Lift w/ scale – Enter Bathroom 1

At least 600lb weight capacity 203 Nuclear Med GB 60 Ceiling Lift w/ scale 1

At least 600lb weight capacity 203 Nuclear Med GB 62 Ceiling Lift w/ scale 1

At least 600lb weight capacity 203 Echo Lab 2A 215 Ceiling Lift w/ scale – Enter Bathroom 1

At least 600lb weight capacity 203 Echo Lab 2A 211 Ceiling Lift w/ scale – Enter Bathroom 1

At least 600lb weight capacity 200 ED overflow 3bays (near GA-

200D) Ceiling Lift w/ scale 3 At least 600lb weight capacity

200 ED GC-116 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-115 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-114 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-113 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-112 Ceiling Lift w/ scale 1

200 ED GC-106 Ceiling Lift w/ scale 1

200 ED GC-105 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-104 Ceiling Lift w/ scale 1 At least 600lb weight capacity

200 ED GC-103 Ceiling Lift w/ scale – Enter Bathroom 1 At least 600lb weight capacity

200 Podiatry Clinic Ground

GA-169 Ceiling Lift w/ scale 1 At least 600lb weight capacity

203 3A-ASU 115 (6 bays) Ceiling Lift w/ scale 6

Total 65

B. Visits to the site by Bidders may be made only by appointment with the

US Army Corps of Engineers Project Manager, Eileen Nixdorf, (415) 503-

6751. There will be a Pre-Bid Site Visit held at the San Francisco VA

Medical Center on Wednesday, August 24, 2011, at 10:00 a.m., Building 6, Room 111. Contact the USACE Project Manager to coordinate for further details.

C. N/A

D. N/A

E. All employees of general contractor and subcontractors shall comply with

VA’s security program and obtain a VA ID badge from VA police. See paragraph 1.35 below for ID badge process. Along with ID Badges all workers must be able to speak and understand English during retrofit.

Retrofit areas as defined by the contract documents will be keyed to a retrofit core when Notice to Proceed is issued. Access to non-retrofit areas is limited to public areas only. Access needed outside of retrofit area (i.e., mechanical rooms) will be provided by COR or his/her representative upon written or verbal request.

F. Prior to commencing work, general contractor shall provide proof that a

OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

G. Training:

1. Beginning July 31, 2005, all employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction

Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team.

2. In addition to the 10-hours OSHA training, VA will provide site-specific training as determined by VA Competent Person with input from the VA’s Infection Control Risk Assessment team. Coordination of this required training will be accomplished through the COR or Project

Engineer. This briefing shall include information on the retrofit limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. All contractors, subcontractors, and vendors must receive this training in order to work at our facility. Failure to receive this training may cause debarment of contractor’s staff until such training is accomplished.

3. Submit training records of all such employees for approval before the start of work.

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, See Scope.

1.3 NOT USED

1.4 SECURITY REQUIREMENETS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days notice to the Contracting

Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

E. N/A

F. N/A

G. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this

Contract to the extent referenced. Publications are referenced in text by basic designations only. The Contractor shall comply with applicable

Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract period. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract.

1. American Society for Testing and Materials (ASTM):

E84-2008.............Surface Burning Characteristics of Building

Materials

2. National Fire Protection Association (NFPA):

10-2010..............Standard for Portable Fire Extinguishers

13-2010 .............Standard for Installation of Fire Sprinklers

30-2008..............Flammable and Combustible Liquids Code

51B-2009.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2011..............National Electrical Code

99-2010 .............Standard for Health Care Facilities

241-2009.............Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926..........Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the retrofit limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241.

For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. N/A

F. N/A

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR.

H. Egress Routes for Retrofit Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to

COR.

I. Fire Extinguishers: Provide and maintain extinguishers in retrofit areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and

NFPA 10.

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

K. N/A

L. N/A

M. Existing Fire Protection: Ceiling Lift installations and curtain track installations shall comply with NFPA 13 for Fire Sprinklers. Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under retrofit, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. All existing or temporary fire protection systems

(fire alarms, sprinklers) located in retrofit areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR Engineer.

N. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COR.

O. Hot Work: Perform and safeguard hot work operations in accordance with

NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility

Safety through COR at least 24 hours in advance. Designate contractor's responsible project-site fire prevention program manager to permit hot work.

P. Ceiling Lift installations and curtain track installations shall comply with NFPA 99 and NFPA 70 for proper grounding and bonding and access to electrical and safety systems.

Q. Smoking: Smoking is prohibited in and adjacent to retrofit areas inside existing buildings and additions under retrofit.

R. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

S. Perform other retrofit, alteration and demolition operations in accordance with 29 CFR 1926.

T. N/A.

U. Above Ceiling Permit: Contractors are restricted from working above ceiling without the required Above Ceiling Permit. This is required when working above any ceilings in the Medical Center outside of contained retrofit areas.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the

COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the

Contractor's performance.

B. N/A

C. The Contractor shall, under regulations prescribed by the COR, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any

Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage.

The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

E. Workmen are subject to rules of Medical Center applicable to their conduct. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of retrofit materials, debris, and vehicles at all times.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during retrofit, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate retrofit working areas within buildings in use by Department of Veterans

Affairs in quantities sufficient for not more than four work days.

Provide unobstructed access to Medical Center areas required to remain in operation.

3. Contractor may bring material onsite as needed and keep within the current area of work; scheduling will allow that the contractor can move from one area to another work area with material.

G. Retrofit Safety Rounds: The USACE will perform Retrofit Safety Rounds weekly. Contractor’s Competent Person will be present during these safety inspections. COR will identify the date and time of these weekly inspections.

H. Phasing: To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR three weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor. The Medical

Center must approve any/all schedules and provide a minimum 2-week notification to their employee labor unions of pending impacts to their work area.

I. N/A

J. N/A

K. N/A

L. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, power, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the

Medical Center Director’s prior knowledge and written approval.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 8 calendar DAYS in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR. This includes any interruption in service that affects outside the work area.

5. In case of a retrofit emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of retrofit activities with flow of Medical

Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of retrofit materials, debris and vehicles.

O. Coordinate the work for this contract with other retrofit and/or construction operations as directed by VA. This includes the scheduling of traffic and the use of roadways.

P. CONTRACT WORK HOURS and FEDERAL HOLIDAYS:

(a). Standard daily contract work hours at the San Francisco VA Medical

Center (SFVAMC) are from 7:30 AM to 5:00 PM, Pacific Standard Time (PST), Monday through Friday, with the exception of Federal Holidays. The contractor shall submit to the Contracting Officer (CO) for approval, in writing, a notice of its desire to work during any period/hours other than the standard. Notice shall include a detailed description of the type of work to be performed and its location. These “non-standard” hours include

Weekends, Holidays, and Evenings. The notice requesting work during non-standard hours shall be submitted not less than two (2) working days prior to each period of work scheduled at times other than normal duty hours to include Federal holidays. Contractors are reminded that patients are generally asleep after 10:00 PM PST. Therefore, approval is subject to the availability of the project manager/COR, the type of work to be performed, the specific hours requested, and the anticipated noise level that will be generated by contractor activity. Under no circumstance will the contractor proceed without express written approval of the Contracting

Officer.

1. Work Phasing/Scheduling: Contractor shall work closely with the COR in developing a work schedule for contract performance. Advance coordination by the contractor is critical and required.

2. The work to be performed on this project will include occupied areas; however, arrangements may be made so that the particular area may be blocked off during performance of work if feasible. The contractor shall notify the COR of intent to start work in any specific assigned area. The contractor shall coordinate the work of all activities whereby both the Government and the contractor can continue operations with the least possible interference and inconvenience.

3. N/A

4. The following is a list of Federal Holidays observed by all Federal

Installations:

New Year's Day, January 1

Martin Luther King, Jr, 3rd Monday in January

Washington's Birthday, 3rd Monday in February

Memorial Day, Last Monday in May

Independence Day, July 4

Labor Day, 1st Monday in September

Columbus Day, 2nd Monday in September

Veterans Day, November 11

Thanksgiving Day, 4th Thursday in November

Christmas Day, December 25

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday. Also included is any date specifically declared by the President of the United States of

America as a National Holiday.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or

Supply Representative to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government.

C. Re-Survey: Prior to the final inspection and turnover of each room, the

Contractor and COR together shall make a thorough re-survey of the room(s) involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

E. Barriers:

1. Barrier must be erected as a complete continuous system. The system is to extend from the floor to above the ceiling to complete an actual airless barrier.

F. Final Cleanup:

1. Upon completion of project, or as work progresses, remove all retrofit debris from above ceiling, vertical shafts and utility chases that have been part of the retrofit.

G. Disposal and Retention: Materials and equipment accruing from work removed and from demolition of buildings, structures, and utilities, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings as items to be stored. Items which remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

4. Perform demolition in such a manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.

5. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.

6. Before beginning any demolition work, the Contractor shall survey the site and examine the specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center. Any damaged items shall be repaired or replaced as approved by the Contracting Officer’s

Representative.

1.8 INFECTION PREVENTION MEASURES

A. Implement the requirements of VAMC’s Infection Control Risk Assessment

(ICRA) team. ICRA Group may monitor dust in the vicinity of the retrofit work and require the Contractor to take corrective action immediately if the safe levels are exceeded.

B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES.

1. All personnel involved in the retrofit activity shall be educated and trained in infection prevention measures established by the medical center.

C. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during retrofit. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the retrofit stage to determine impact of retrofit activities on indoor air quality. In addition:

1. The VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the retrofit zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the retrofit zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.

2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, following preventive measures shall be adopted during retrofit to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary retrofit partitions in existing structures where directed by Resident

Engineer. Bank off ducts and diffusers to prevent circulation of dust into occupied areas during retrofit.

2. Do not perform dust producing tasks within occupied areas without the approval of the Resident Engineer. For retrofit in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:

a. Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the Resident Engineer and Medical

Center.

b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that retrofit exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. Install HEPA (High Efficiency

Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles.

Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other prefilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.

c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x 900mm (24” x 36”), shall be used at all interior transitions from the retrofit area to occupied medical center area. These mats shall be changed as often as required to maintain cleanliness directly outside the work area at all times.

d. Vacuum and wet mop all transition areas from retrofit to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently.

Remove debris as they are created. Transport these outside the retrofit area in containers with tightly fitting lids.

e. The contractor shall not haul debris through patient-care areas without prior approval of the Resident Engineer and the Medical

Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape.

No sharp objects should be allowed to cut through the plastic.

Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.

f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.

g. There shall be no standing water during retrofit. This includes water in equipment drip pans and open containers within the retrofit areas. All accidental spills must be cleaned up and dried immediately. Remove and dispose of porous materials that remain damp for more than 72 hours.

h. At completion, remove retrofit barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.

E. Final Cleanup:

1. Upon completion of installation in each room, or as work progresses, remove all retrofit debris from above ceiling, vertical shafts and utility chases that have been part of the retrofit.

2. Perform HEPA vacuum cleaning of all surfaces in the retrofit area.

This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.

3. All new air ducts shall be cleaned prior to final inspection.

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.10 ELECTRICAL INSTALLATIONS

A. General: Furnish and install electrical wiring, systems, equipment and accessories in accordance with the specifications and drawings.

Electrical service entrance equipment (arrangements for temporary and permanent connections to the utility’s system) shall conform to the utility's requirements. Coordinate fuses, circuit breakers and relays with the utility’s system, and obtain utility approval for sizes and settings of these devices.

B. Minimum Requirements: References to the International Building Code

(IBC), National Electrical Code (NEC), Underwriters Laboratories, Inc.

(UL) and National Fire Protection Association (NFPA) are minimum installation requirement standards.

C. Test Standards: All materials and equipment shall be listed, labeled or certified by a nationally recognized testing laboratory to meet

Underwriters Laboratories, Inc., standards where test standards have been established. Equipment and materials which are not covered by UL

Standards will be accepted provided equipment and material is listed, labeled, certified or otherwise determined to meet safety requirements of a nationally recognized testing laboratory.

D. Work Performance:

1. All electrical work must comply with the requirements of NFPA 70

(NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by contract.

2. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished in this manner for the required work, the following requirements are mandatory:

a. Electricians must use full protective equipment (i.e., certified and tested insulating material to cover exposed energized electrical components, certified and tested insulated tools, etc.) while working on energized systems in accordance with NFPA 70E.

b. Electricians must wear personal protective equipment while working on energized systems in accordance with NFPA 70E.

c. Before initiating any work, a job specific work plan must be developed by the contractor with a peer review conducted and documented by the Contracting Officer’s Representative and Medical

Center staff. The work plan must include procedures to be used on and near the live electrical equipment, barriers to be installed, safety equipment to be used and exit pathways.

d. Work on energized circuits or equipment cannot begin until prior written approval is obtained from the Contracting Officer’s

Representative.

1.11 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the Resident

Engineer. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .