Eng_Form_93.pdf

ENG Form PDF 51 KB Posted

Attached to
Shallow Land Disposal Area (SLDA) Draft RFP
Solicitation number
W912P4-13-R-0001
Issued by

About this file

Payment Estimate (ENG 93)

View the file

Other versions and copies of ENG Form 93

File Revision Posted Attached to
Section J Attachment 6 - ENG Form 93 Instructions_SDVOSB PRAC MATOC 02March2021.pdf Mar 2, 2021 MEGA Service Disabled Veteran Owned Small Business (SDVOSB) Pre-Place Remedial Action Contract (PRAC)
Attachment 6 - Eng_Form_93_2014Mar.pdf 2014 Mooring Eyes Repair & Installation at Dirab & KAA
Attachment 2-ENG FORM 93.pdf Revision not stated Project: CSC-20049 Water Heater (Solar) Improvements Bldg 11
Attachment 02-ENG FORM 93.pdf Revision not stated Project: CSC-20007 Maintenance & Repair Building 22
Attachment 8-ENG FORM 93.pdf Revision not stated CSC-21501 Maintenance of HVAC, Plumbing and and emergency power supply (EPS) systems
Attachment 6 - ENG Form 93.pdf Revision not stated CSC-20019; DSCC BLDG 27 Boiler Conversion
Attachment 02-ENG FORM 93.pdf Revision not stated Project: CSC-21010 Maintenance & Repair Building 20, FY 21
Attachment 2-ENG FORM 93.pdf Revision not stated Project: CSC-20001 Safety Improvements, FY21
Section J Attachment 5_ENG Form 93 Instructions.pdf Revision not stated Environmental Consulting Services IDIQ MATOC
Attachment 2-ENG FORM 93.pdf Revision not stated Project: CSC-19731 M&R Sanitary Lines SIte Wide
Attachment 2 ENG FORM 93.pdf Revision not stated Project: CSC-20009 Structural wall repairs and paint
AT-2-ENG FORM 93.pdf Revision not stated Installation of Infared Heaters Bldg 43 Defense Supply Center Columbus
Attachment 6 - ENG Form 93.pdf Revision not stated CSC-20013; Gutter and Roof Repair
Attachment 2-ENG FORM 93.pdf Revision not stated CSC-20099 Resurface Playgrounds at Child Development Center
Tab_25e_Attach_F_Eng_Form_93.pdf Revision not stated Maintenance and Repair to Tie-Back Anchors at DSCC
_2_ENG_FORM_93.pdf Revision not stated CSC-19718 Security Enhancements
ENG_FORM_93.pdf Revision not stated CSC-18761 Repair & Seal Floors Building 9 & 30
_2_ENG_FORM_93.pdf Revision not stated CSC-19719 M&R Building 20
AT-2-ENG_FORM_93.pdf Revision not stated Building Renovation and HVAC
_2_ENG_FORM_93.pdf Revision not stated Project: CSC-19723 M&R Pavement
Show all 20

Who attaches ENG Form 93

Other files

File Type Posted
09_Jan_Draft_RFP_Site_Visit_Sign_In_List.pdf PDF
W912P4-13-R-0001.pdf PDF
Haz_Waste_and_Disposal_SCA_Wage_Determination.pdf PDF
APP_SSHP_Checklist_word_doc_tnr_w_Be_SLDA_PWS_20Sep2012_RHW.doc DOC document
DBA_Wage_Determination.pdf PDF
SLDA_GFP_Inventory.xlsx XLSX spreadsheet
LRB-Crane-CertificateOfCompliance.doc DOC document
Basic_SCA_Wage_Determination.pdf PDF
Att_2_-_Labor_Rate_Form.xlsx XLSX spreadsheet
AT_OPSEC_Cover_sheet.pdf PDF
LRB-ContractorMonthlyManhourExposureForm.xls XLS spreadsheet
e33941_w_Instructions.pdf PDF
NAVFAC_USACE_PPQ.docx DOCX document
W912P4-13-R-0001.pdf PDF
SLDA_Sample_PWS_Rev1.docx DOCX document
Site_Layout.pdf PDF
UFGS_01_35_26_Feb_12_Gov'l_Safety_Req_SLDA_SOW_PWS_upd_20Sep2012.doc DOC document
UFGS_01_35_29.13_Jan_2008_SLDA_SOW_PWS_upd_20Sep2012.rtf RTF text file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAYMENT ESTIMATE - CONTRACT PERFORMANCE

For use of this form, see ER 37-2-10 and 37-345-10; the proponent agency is CERM-FC.

ENG FORM 93, 1 MAR 1978 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

b. CONTRACTING OFFICER APPROVAL SIGNATURE

9. PERIOD COVERED BY THIS ESTIMATE (YYYYMMDD)

2. CONTRACTOR AND ADDRESS

1. DATE (YYYYMMDD)

SHEET of

3. CONTRACT NUMBER 4. DISTRICT

5. DESCRIPTION OF WORK 6. APPROPRIATION AND PROJECT 7. REQUIRED COMPLETION DATE (YYYYMMDD)

8. LOCATION 10. JOB ORDER NUMBER 11. ESTIMATE NUMBER

FROM THRU

12.

ITEM

NUMBER

a.

DESCRIPTION

b.

CONTRACT

(1)

QUANTITY AND UNIT

(2)

UNIT PRICE

(3)

AMOUNT

c.

TOTAL TO DATE

(1)

QUANTITY AND UNIT

(2)

AMOUNT

d. INCLUDES MODIFICATION THRU (YYYYMMDD): e. TOTAL CONTRACT > f. TOTAL EARNINGS

TO DATE >

13. PRESENTED FOR PAYMENT

a. PAYEE b. PER

c. DATE (YYYYMMDD) d. TITLE

14. APPROVED FOR PAYMENT

I CERTIFY THAT I HAVE CHECKED THE QUANTITIES COVERED BY THIS BILL OR ESTIMATE;

THAT THE WORK WAS ACTUALLY PERFORMED; AND THE QUANTITIES ARE CORRECT AND

CONSISTENT WITH ALL PREVIOUS COMPUTATIONS AS ACTUALLY CHECKED; THAT THE

QUANTITIES AND AMOUNTS ARE WHOLLY CONSISTENT WITH THE REQUIREMENTS OF THE

CONTRACT OR OTHER INSTRUMENT INVOLVED.

a. TITLE b. DATE (YYYYMMDD)

15a. DATE (YYYYMMDD)

c. SIGNATURE

16a. PREVIOUS DEDUCTIONS OTHER THAN RETAINED PERCENTAGE** (**Page 2)

b. PREVIOUS RETAINED PERCENTAGE

c. PREVIOUS PAYMENTS

d. PREVIOUS EARNINGS (a+b+c)

e. EARNINGS THIS PERIOD (Total Earnings to date minus d)

f. LESS RETAINED PERCENTAGE

h. TOTAL DEDUCTIONS FOR THIS PERIOD (f+g)

g. LESS DEDUCTIONS OTHER THAN

RETAINED PERCENTAGE FOR

i. RETAINAGE REFUNDED

j. OTHER REFUNDS

k. TOTAL REFUNDS THIS PERIOD (i+j)

ENG FORM 93, 1 MAR 1978 Page 2 of 2

SECTION 16 (Continuation)

18. **DETAILED EXPLANATION AND OR REMARKS (Page 1 Item 16a.)

l. AMOUNT DUE CONTRACTOR (e-h+k)

17. RECAPITULATION:

a. TOTAL RETAINED PCTG. (b+f-i)

b. TOTAL PAID (c+l)

SHEET of

PAYMENT ESTIMATE - CONTRACT PERFORMANCE

For use of this form, see ER 37-2-10 and 37-345-10; the proponent agency is CERM-FC.

ENG FORM 93, 1 MAR 1978 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

9. PERIOD COVERED BY THIS ESTIMATE (YYYYMMDD)

SHEET of

FROM

THRU

12.

ITEM

NUMBER

a.

DESCRIPTION

b.

CONTRACT

(1)

QUANTITY AND UNIT

(2)

UNIT PRICE

(3)

AMOUNT

c.

TOTAL TO DATE

(1)

QUANTITY AND UNIT

(2)

AMOUNT

d. INCLUDES MODIFICATION THRU (YYYYMMDD):

e. TOTAL CONTRACT >

f. TOTAL EARNINGS

TO DATE >

13. PRESENTED FOR PAYMENT

14. APPROVED FOR PAYMENT

I CERTIFY THAT I HAVE CHECKED THE QUANTITIES COVERED BY THIS BILL OR ESTIMATE; THAT THE WORK WAS ACTUALLY PERFORMED; AND THE QUANTITIES ARE CORRECT AND CONSISTENT WITH ALL PREVIOUS COMPUTATIONS AS ACTUALLY CHECKED; THAT THE QUANTITIES AND AMOUNTS ARE WHOLLY CONSISTENT WITH THE REQUIREMENTS OF THE CONTRACT OR OTHER INSTRUMENT INVOLVED.

16a. PREVIOUS DEDUCTIONS OTHER THAN RETAINED PERCENTAGE** (**Page 2)

b. PREVIOUS RETAINED PERCENTAGE

c. PREVIOUS PAYMENTS

d. PREVIOUS EARNINGS (a+b+c)

e. EARNINGS THIS PERIOD (Total Earnings to date minus d)

f. LESS RETAINED PERCENTAGE

h. TOTAL DEDUCTIONS FOR THIS PERIOD (f+g)

g. LESS DEDUCTIONS OTHER THAN

RETAINED PERCENTAGE FOR

i. RETAINAGE REFUNDED

j. OTHER REFUNDS

k. TOTAL REFUNDS THIS PERIOD (i+j) ENG FORM 93, 1 MAR 1978 Page 2 of 2 SECTION 16 (Continuation)

l. AMOUNT DUE CONTRACTOR (e-h+k)

17. RECAPITULATION:

a. TOTAL RETAINED PCTG. (b+f-i)

b. TOTAL PAID (c+l)

SHEET of 1.1 mark.a.cooper@usace.army.mil 20110815 Form Design Team CEIT-PMO-I ENG FORM 93 Payment Estimate Contract Performance 1 MAR 1978 Mark Cooper ENG FORM 93 Payment Estimate Contract Performance 1 MAR 1978 20110815

PrintForm:
Button1:
CONTRACTSIGN:
CAPTIONS:
YYYYMMDD:
Cell4:
NUM1:
NUM2:
NUM3:
NUM5:
NUM4:
NUM10:
NUM9:
NUM8:
NUM7:
NUM6:
NUM15:
NUM14:
NUM13:
NUM12:
NUM11:
NUM20:
NUM19:
NUM18:
NUM17:
NUM16:
NUM25:
NUM24:
NUM23:
NUM22:
NUM21:
NUM30:
NUM29:
NUM28:
NUM27:
NUM26:
NUM31:
NUM32:
NUM33:
DATECONTRACT:
SIGNATURE:
NUM34:
NUM35:
NUM36:
NUM37:
NUM38:
NUM39:
NUM40:
NUM41:
NUM42:
NUM43:
NUM44:
NUM45:
NUM46:

File details come from the government source that posted it. Updated .