W912P4-13-R-0001.pdf

PDF 566 KB Posted

Attached to
Shallow Land Disposal Area (SLDA) Draft RFP
Solicitation number
W912P4-13-R-0001
Issued by

About this file

USE THIS DRAFT. Assumptions for Sample Problem 3 in Section M have been updated.

View the file

Other files

File Type Posted
09_Jan_Draft_RFP_Site_Visit_Sign_In_List.pdf PDF
Haz_Waste_and_Disposal_SCA_Wage_Determination.pdf PDF
APP_SSHP_Checklist_word_doc_tnr_w_Be_SLDA_PWS_20Sep2012_RHW.doc DOC document
DBA_Wage_Determination.pdf PDF
Eng_Form_93.pdf PDF
SLDA_GFP_Inventory.xlsx XLSX spreadsheet
LRB-Crane-CertificateOfCompliance.doc DOC document
Basic_SCA_Wage_Determination.pdf PDF
Att_2_-_Labor_Rate_Form.xlsx XLSX spreadsheet
AT_OPSEC_Cover_sheet.pdf PDF
LRB-ContractorMonthlyManhourExposureForm.xls XLS spreadsheet
e33941_w_Instructions.pdf PDF
NAVFAC_USACE_PPQ.docx DOCX document
W912P4-13-R-0001.pdf PDF
SLDA_Sample_PWS_Rev1.docx DOCX document
Site_Layout.pdf PDF
UFGS_01_35_26_Feb_12_Gov'l_Safety_Req_SLDA_SOW_PWS_upd_20Sep2012.doc DOC document
UFGS_01_35_29.13_Jan_2008_SLDA_SOW_PWS_upd_20Sep2012.rtf RTF text file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C

D

EX

X G F

138 - 153 X H 154 - 180

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 180

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912P4 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

WALTER KAMAD 716-879-4134

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 4 5 - 11

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

12 - 80 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

82 - 83

K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 84 - 88 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 89 - 93 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

94 - 136

PART II - CONTRACT CLAUSES

DEPARTMENT OF THE ARMY

USACE BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199 716-879-4250

716-879-4353FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

30 Oct 2012

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912P4-13-R-0001

Section A - Solicitation/Contract Form

FUSRAP SLDA SATOC

Formerly Utilized Sites Remedial Action Program (FUSRAP) Shallow Land Disposal

Area (SLDA) Armstrong County, PA

Single Award Task Order Contract

(SATOC)

Unrestricted Solicitation – Draft Request for

Proposal

Solicitation Number

CAUTION!

This is a DRAFT RFP for comments from industry. Contractors are strongly encouraged to provide feedbak on this draft solicitation. Unless otherwise specified, the draft RFP hereafter is written as if it were a final RFP.

BEFORE SIGNING AND MAILING THE PROPOSAL, please take note of the following, as failure to perform any one of these actions may cause your offer to be rejected.

1. AMENDMENTS: Have you acknowledged receipt of ALL Amendments? If in doubt as to number of amendments issued, please contact our office or visit the FedBizOpps website.

2. SEALED PROPOSALS: Sealed envelopes containing proposals shall be marked to show the offeror's name and address, the solicitation number, amendments received and acknowledged, and the date and time proposals are due.

3. AMENDED PROPOSAL PAGES: If any of the Amendments include amended proposal pages, the amended proposal pages must be used in submitting your proposal.

4. LATE PROPOSALS: Late proposals shall be handled in accordance with FAR Clause 52.215- 1(c)(3).

5. MISTAKE IN PROPOSAL: Have you reviewed your proposal cost information for possible errors in calculations or omissions?

6. FACSIMILE PROPOSALS, MODIFICATIONS, OR WITHDRAWALS: No proposals, amendments, or withdrawals will be accepted via facsimile transmission in regards to this solicitation. Facsimile proposals and modifications are only acceptable on a task order basis.

7. SECTION K, Representations and Certifications: Must be completed and submitted with your proposal. See other documentation that is required to be submitted as part of the Cost Volume of the proposal.

8. HAND-DELIVERED PROPOSAL: If proposals are hand-delivered, you must be aware of security requirements in effect in the Federal Building. No additional time will be allowed due to security requirements.

9. Offerors should be aware that the terms "Proposer" and "Offeror" are used interchangeably throughout this Specification.

10. Offerors should refer to Sections L and M of this solicitation for information on submission and evaluation of proposals.

11. PROPOSAL DUE DATE: TBD AT A LATER DATE

Executive Summary

1. The work and services shall consist of construction and environmental services to support the U.S. Army Corps of Engineers (USACE), Buffalo, NY and Pittsburgh, PA - Districts in remediation of radiologically contaminated media to include special nuclear material disbursed in environmental media, ranging from loose soil to debris such as pipes, drums and other man-made items. Project focus consists of the surface evaluation, excavation, waste stream characterization/segregation, waste evaluation, waste packaging, transport and disposal of radiologically contaminated media and at a properly licensed facility outside of the state of Pennsylvania. Additional activities may include, but are not limited to: environmental investigation, design, construction of a new, permanent Material Processing Building (MPB) or modifications to the existing MPB , preparation of appropriate documents and work plans, interaction with State and Federal agencies including USACE, Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and Pennsylvania Department of Environmental Protection (PADEP); overall site maintenance, monitoring and restoration.

Waste characterization, handling and management shall include strict material control and accounting, development and implementation of procedures to ensure criticality safety, and safe transportation off-site.

2. The Government anticipates awading a ten-year IDIQ SATOC to include a three-year base period and seven one-year options. Task orders will be awarded against the basic IDIQ contract.

Task orders may be Firm- Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Cost Plus Incentive Fee (CPIF) or any combination thereof. In lieu of financial incentives, the Contracting Officer (KO) may consider use of an award-term structure at the IDIQ level that will assess performance semi-annually on all orders (FFP & Cost-type). Meeting meaningful schedule, perfromance and costs metrics would entitle the contractor to an additional year of work (INDUSTRY IS

ENCOURAGED TO PROVIDE MEANINGFUL METRICS ON IMPLEMENTING SAID

PLAN). Based on recent procurement experience, it is anticipated that approximately 10% to 15% of the task order efforts will be firm-fixed price.

3. The rates proposed in the sample task order are binding cost elements. These rates shall be maximum allowable rates for task orders issued during the ordering period of this contract. Rates may be adjusted on a yearly basis to account for costs increases. Any proposed rate adjustments shall be submitted to the Contracting Officer 60-days prior to the requested date of adjustment.

Applicable wage determinations take precedence over all rate agreements in the event a wage rate is higher than the rate agreement included in the IDIQ.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum SLDA Remediation

FFP

This CLIN is for Firm-Fixed Price task orders for remediation of the Formerly Utilized Sites Remedial Action Program (FUSRAP) SLDA Site in Armstrong County, PA. The contractor shall perform environmental remedaition and other functions as required by Section C and applicable task order specifications. The individual task order Performance Work Statement will clearly indicate the specific requirements of the task(s) awarded. The contractor shall furnish the required labor, general management, quality management, administration, travel, supervision, quality control, supplies, materials, equipment (not otherwise furnished as Government Furnished Materials), transportation, and documents/permits necessary to deliver services and any associated deliverables within schedule and in accordance with contract terms and conditions, reference documents, specific contract and task order requirements, and contract clauses.

FOB: Destination

NET AMT

0002 Lump

Sum

SLDA Remediation

COST

This CLIN is for Firm-Fixed Price task orders for remediation of the Formerly Utilized Sites Remedial Action Program (FUSRAP) SLDA Site in Armstrong County, PA. The contractor shall perform environmental remedaition and other functions as required by Section C and applicable task order specifications. The individual task order Performance Work Statement will clearly indicate the specific requirements of the task(s) awarded. The contractor shall furnish the required labor, general management, quality management, administration, travel, supervision, quality control, supplies, materials, equipment (not otherwise furnished as Government Furnished Materials), transportation, and documents/permits necessary to deliver services and any associated deliverables within schedule and in accordance with contract terms and conditions, reference documents, specific contract and task order requirements, and contract clauses.

ESTIMATED COST

OPTION SLDA Remediation

FFP

Option Year I

OPTION SLDA Remediation

COST

Option Year 1

OPTION SLDA Remediation

FFP

Option Year 2

OPTION SLDA Remediation

COST

Option Year 2

OPTION SLDA Remediation

FFP

Option Year 3

OPTION SLDA Remediation

COST

Option Year 3

OPTION SLDA Remediation

FFP

Option Year 4

OPTION SLDA Remediation

COST

Option Year 4

OPTION SLDA Remediation

FFP

Option Year 5

OPTION SLDA Remediation

COST

Option Year 5

OPTION SLDA Remediation

FFP

Option Year 6

OPTION SLDA Remediation

COST

Option Year 6

OPTION SLDA Remediation

FFP

Option Year 7

OPTION SLDA Remediation

COST

Option Year 7

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

SECTION C

INDEX

PART 1 GENERAL

1.1 CONTRACT AWARD

1.2 DESCRIPTION OF WORK

1.3 SCOPE OF WORK

1.4 ROLES AND RESPONSIBILITIES

1.5 SERVICES TO BE PROVIDED BY CONTRACTOR

1.6 BACKGROUND INFORMATION

1.6.1 Introduction

1.6.2 Site Location and Description

1.6.3 Site History

1.6.4 Regulatory Background

1.6.5 ROCs and Soil Cleanup Goals

1.6.6 Applicable or Relevant and Appropriate Requirements

1.7 ISSUANCE OF TASK ORDERS

1.8 REQUIREMENTS FOR COST REIMBURSEMENT TASK ORDERS

1.8.1 Contract Management Procedures

1.8.2 Cost Control

1.8.3 Accounting System Capabilities

1.8.4 Management Organization, Responsibilities, and Authorities

1.8.5 Mobilization

1.8.6 Management Information System

1.8.7 Work Allocation Document

1.8.8 Procurement and Subcontracting

1.8.9 Subcontractor Changes and Claims

1.8.10 Closeout Procedures

1.9 SITE-SPECIFIC SUBMITTALS

1.10 SUBMITTAL PROCEDURES

1.10.1 Submittal Classifications

1.10.2 Approved Submittals

1.10.3 Disapproved Submittals

1.10.4 Withholding of Payment

1.10.5 Approval of Submittals

1.10.6 Deviations

1.10.7 Control of Submittals

1.10.8 Information Only Submittals

1.10.9 As-Built Drawings

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 SAFETY AND HEALTH

3.1.1 General

3.1.2 Acceptance of Work Plans

3.1.3 Regulations and Guidance

3.2 SECURITY

3.3 ENVIRONMENTAL REQUIREMENTS

3.4 PERMITS/LICENSES

3.5 RADIOLOGICAL MATERIALS AND EQUIPMENT

3.6 ENGINEERING & DESIGN REQUIREMENTS

3.6.1 General

3.6.2 Engineering & Design Quality Control Plan

3.7 CONTRACTOR QUALITY CONTROL

3.7.1 General

3.7.2 Quality Control Plan

3.7.3 Coordination Meeting

3.7.4 Quality Control Organization

3.7.5 Control

3.7.6 Tests

3.7.7 Laboratory Support Services

3.7.8 Completion Inspection

3.7.9 Documentation’

3.7.10 Notification of Noncompliance

3.8 WORK PLANS AND PROGRAMS

3.8.1 Accident Prevention Plan / Site Safety and Health Plan

3.8.2 Radiation Protection Program

3.8.3 Nuclear Criticality Safety Program

3.8.4 Material Control and Accounting Program

3.8.5 Emergency Plan

3.8.6 Physical Security Plan

3.8.7 Regulatory Compliance Plan

3.8.8 Communications Plan

3.8.9 Site Operations Plan

3.8.10 Sampling and Analysis Plan

3.8.11 Water Management Plan

3.8.12 Waste Management, Transportation, and Disposal Plan

3.8.13 Waste Management Transportation and Disposal Facilities Consent Package

3.8.14 Transportation Security Plan / Transporter Certification

3.8.15 Backfill and Restoration Plan

3.9 TRANSPORTATION, STORAGE, TREATMENT AND/OR DISPOSAL OF HAZARDOUS WASTES

3.9.1 Transportation, Storage, Treatment and/or Disposal of Hazardous Materials

3.9.2 Complete Manifest Package

3.9.3 Transportation and Disposal Reporting Requirements

3.9.4 Contractor Responsibilities

3.9.5 Government Responsibilities

3.9.6 Regulator Notices of Non-Compliance

3.9.7 Sub Coordination

3.10 CONTRACTOR PROJECT STAFF ORGANIZATION, QUALIFICATIONS AND RESPONSIBILITIES

3.10.1 List of Key Individuals, Qualifications and Responsibilities

3.10.1.1 Program Manager

3.10.1.2 Project Manager

3.10.1.3 Site Superintendent

3.10.1.4 Safety and Health Manager

3.10.1.5 Site Safety and Health Officer

3.10.1.6 Radiation Safety Officer (RSO)

3.10.1.7 Assistant Radiation Safety Officer (ARSO)

3.10.1.8 Contractor Quality Control (CQC) System Manager

3.10.1.9 Nuclear Material Accountability Officer (NMAO)

3.10.1.10 Nuclear Criticality Safety Manager (NCSM)

3.10.1.11 Senior NCS Engineer

3.10.1.12 Data Acquisition Manager

3.10.1.13 Training Coordinator

3.10.1.14 Facility Security Officer (FSO)

3.10.1.15 Emergency Manager

3.10.1.16 Waste Manager

3.10.2 Other CONTRACTOR Site Personnel

3.10.3 CONTRACTOR Corporate Staff Support

3.10.3.1 Project Chemist

3.10.3.2 Civil Engineer

3.10.3.3 Hydrogeologist

3.10.3.4 Regulatory Specialist

3.10.3.5 Cost Scheduler

3.10.3.6 Contracts Manager

3.10.4 Other Personnel

3.11 RESIDENT MANAGEMENT SYSTEM

3.12 GREEN AND SUSTAINABLE REMEDIATION (GSR) AND INNOVATIVE TECHNOLOGIES (IT)

3.13 GOVERNMENT FURNISHED PROPERTY

3.14 PUBLIC AFFAIRS

SECTION C

DESCRIPTION/SPECIFICATION/WORK STATEMENT

PART 1 GENERAL

1.1 CONTRACT AWARD

The Government intends to award an Indefinite Delivery, Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) under Solicitation No. W912P4-13-R-0001. This ten-year IDIQ SATOC will include a three (3) year base period and seven (7) option years in accordance with DFARS 217.204, and will be procured using full and open competition procedures. Under this IDIQ SATOC the Government intends to issue Firm Fixed Price and/or Cost-Reimbursable task orders. Cost-Reimbursable task orders may include Fixed Fee, Award Fee, or Incentive Fee.

1.2 DESCRIPTION OF WORK

This IDIQ SATOC is for remediation of the Formerly Utilized Sites Remedial Action Program (FUSRAP) Shallow Land Disposal Area (SLDA) Remediation Project in Parks Township, Armstrong County, Pennsylvania. This IDIQ SATOC will provide the Government with continuity of personnel and institutional knowledge for development and implementation of a streamlined and flexible vehicle for safe and cost-effective remediation.

1.3 SCOPE OF WORK

This IDIQ SATOC requires the Remediation Contractor (CONTRACTOR) to furnish all labor, material, equipment and supervision to perform all work necessary to complete simultaneous Task Orders at the SLDA Remediation Project. The remedial activities required under this IDIQ SATOC may include, but are not limited to, development of workplans, environmental monitoring, excavation, waste characterization and segregation, waste evaluation, waste packaging, and transport and disposal of radiologically contaminated materials. The radioactively contaminated soils, sediments, and debris will be removed from the disposal trenches, subjected to on-site handling, and transported off site for disposal in a facility permitted to receive such materials. Excavated non-radioactive materials including chemical-only wastes will be transferred by the CONTRACTOR to the site owner. On-site handling processes may include physical separation, size reduction, and radiological sorting.

The waste types anticipated at the SLDA include, but are not limited to:

Special Nuclear Material (SNM) as defined in 10 CFR 70.4

Radioactive waste including but not limited to low-level radioactive waste (LLRW), high-level radioactive waste (HLW), and transuranic (TRU) waste.

Mixed waste (i.e., waste that contains both source, SNM, or by-product material subject to the Atomic Energy Act of 1954, as amended and Hazardous Waste subject to the Resource Conservation and Recovery Act (RCRA))

Beryllium (Be) contaminated waste

Non-radioactive waste subject to RCRA

Non-radioactive waste not subject to RCRA

The United States Army Corps of Engineers (USACE) remedial activities at the SLDA site will address contamination on the site associated with the eight (8) radionuclides of concern (ROC) (identified in Section 1.6.5 of this Work Statement) and any non-radiological contamination that is commingled with these ROCs. However, additional information suggests that the Parks and Apollo Facilities processed or possessed other radioactive materials than are listed in the Record of Decision (ROD), which therefore may be assumed to potentially be present in the SLDA and require disposal upon discovery. Any chemical contamination that is not radioactive or commingled with radioactive waste cannot be disposed of under USACE authority, and shall be segregated and transferred by the CONTRACTOR to the site owner’s designated on-site storage location. It is the responsibility of the CONTRACTOR to identify all material that meets the commercial radioactive material disposal site’s WAC; all other material that does not meet those requirements shall be transferred to the Y-12 National Security Complex (Y-12), of the National Nuclear Security Administration (NNSA) for disposition.

The CONTRACTOR shall assume a field work season beginning April 1st through November 30th, with an annual mobilization/demobilization cycle. During periods of annual demobilization of remediation resources, the CONTRACTOR shall be responsible for operations and maintenance activities required to maintain the site in a secure, limited activity condition. The USACE recognizes that seasonal work may impact retention of personnel and encourages optimization of annual operations to avoid challenges associated with a seasonal field work schedule. The CONTRACTOR may submit a separate proposal for year-round remedial operations, detailing the benefits to the Government, including cost and schedule benefits.

Additional activities may include, but are not limited to: environmental investigation, design, construction and/or modification of site infrastructure, preparation of appropriate documents and work plans, site maintenance, monitoring, restoration, interaction with State and Federal agencies including USACE, U.S.

Department of Energy (DOE), U.S. Nuclear Regulatory Commission (NRC), Pennsylvania Department of Environmental Protection (PaDEP) and emergency response agencies, participation at public meetings, and any other actions necessary to remediate the SLDA.

1.4 ROLES AND RESPONSIBILITIES

The USACE is the lead agency for this remedial action and has overall responsibility for execution of the project. The DOE NNSA will assist USACE with the disposition of any discrete SNM items that do not meet the CONTRACTOR’s disposal facility waste acceptance criteria (WAC) or are identified as having strategic significance. The NRC has the potential to observe and advise USACE under an existing Memorandum of Understanding (MOU).

1.5 SERVICES TO BE PROVIDED BY CONTRACTOR

The CONTRACTOR shall be responsible for all remediation work including analyses, excavation, handling, packaging, sampling, transportation, and disposal of all material required under this contract.

Work under this contract includes, but is not limited to, the following activities:

Establish, maintain, and follow a Safety and Health Program and preparation/implementation of Accident Prevention Plans as required by Engineer Manual (EM) 385-1-1, 29 CFR 1910.120/29 CFR 1926.65, or other Occupational Safety and Health Administration (OSHA) compliance plans pertinent to the work.

Establish and follow all appropriate data quality procedures based on USACE, United States Environmental Protection Agency (USEPA) and PaDEP guidance. Perform multi-media chemical sampling and analysis for a wide variety of compounds.

Traditional and innovative methods for site remediation. Innovative technologies are defined as newly developed technologies (or new applications of existing technologies) that lack complete cost and performance data.

Topographic and geophysical surveys.

Workforce and equipment mobilization and demobilization

Design and construction of a structure where physical and non-destructive radiological investigation of discrete SNM items can be performed. CONTRACTOR should give consideration to minimizing the Emergency Evacuation Zone and potential for environmental emissions, localized security, continuity of remediation activities, and storage of the full spectrum of SNM items as defined by 10 CFR Part 74.

Contaminated soil excavation and debris removal activities.

Construction of and short-term (maximum of 10 years) operation and maintenance (O&M) of project facilities including but not limited to:

a. Wastewater and stormwater collection and treatment systems.

b. Existing site infrastructure identified as Government Furnished Property and Government Furnished Equipment in Section J of this solicitation.

Soil and rock borings, sampling, testing and other geotechnical analyses.

Drilling, installation and development of groundwater monitoring and extraction wells.

Hydrogeological testing and data analyses.

Multi-media sampling and sample management for chemical and geotechnical characteristics.

Work area and perimeter air monitoring, sampling and the related analysis.

Installation of support facilities (i.e., site project offices, decontamination facilities, roads and utilities).

Traditional and innovative methods for source control and remedial action, such as the following:

a. On-site source control/containment.

b. Excavation.

c. On-site treatment of contaminated soils, sediments or water.

d. Transportation and treatment and/or disposal to off-site facilities.

Radioactive material remediation and Final Status Surveys.

Site restoration.

Public relations support.

Reporting and document preparation. Examples include, but are not limited to: Environmental Surveillance Report, Monthly, Annual and Final Status Survey Reports, Construction Closeout Reports, Post Remedial Action Reports, and Personnel Monitoring Reports.

Maintenance of electronic files, data, maps, tables, databases, Geographic Information System (GIS), and project administrative files.

In-situ and ex-situ analysis of radionuclides and chemical contaminants (including beryllium, lead, and other metals), utilizing innovative in-situ measurement technologies and techniques, and on-site & off-site Department of Defense (DOD) Environmental Laboratory Accreditation Program (ELAP) accredited laboratories. Techniques should include, but are not limited to, alpha and gamma spectroscopy, and inductively coupled plasma mass spectroscopy (ICPMS).

Radiological and nuclear criticality safety.

Material control and accountability (MC&A).

Preparation of workplans.

Storm & waste water management through effective, handling, treatment and discharge or disposal of all site waters as they apply.

Emergency Planning.

1.6 BACKGROUND INFORMATION

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) documents and associated references can be viewed on the USACE - Pittsburgh website (http://www.lrp.usace.army.mil/)

1.6.1 Introduction

In 1997, Congress designated the USACE as the lead Federal agency for implementing the FUSRAP. As the lead Federal Agency for FUSRAP, USACE has authority to address the following:

Radioactive contamination (hazardous substance) from Manhattan Engineer District (MED) /Atomic Energy Commission (AEC) activities, or

Other hazardous substances (i.e., Be), pollutants, or contamination resulting from MED/AEC activities, or

Hazardous substances, pollutants or contamination unrelated to MED/AEC activities, but which are commingled with MED/AEC waste.

In January 2002, Section 8143 of Public Law 107-117 directed the USACE to cleanup radioactive waste at the SLDA site under FUSRAP. The cleanup is subject to the CERCLA and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) , the requirements of the July 5, 2001 Memorandum of Understanding (MOU) between the NRC and the USACE for coordination of cleanup and decommissioning of FUSRAP sites with NRC-licensed facilities, and subsequent MOUs (TBD) between the responsible government agencies.

The USACE Pittsburgh District has been assigned Project Management responsibility for the SLDA FUSRAP team and is taking the lead on the investigation and remediation work for this site. The USACE Buffalo District is the Hazardous, Toxic and Radiological Waste (HTRW) Design Center assigned to perform the technical evaluations. The USACE team is working closely with the PaDEP, NRC, DOE, Parks Township, the stakeholders, and the property owner, Babcock & Wilcox Technical Services Group, Inc.

1.6.2 Site Location and Description

The SLDA site is located in Armstrong County, Pennsylvania, about 23 miles (38 km) east-northeast of Pittsburgh, Pennsylvania The SLDA site is adjacent to the community of Kiskimere in Parks Township, Armstrong County, Pennsylvania. The SLDA site is bordered by Kiskimere Road to the southwest and State Route 66 and the Kiskiminetas River to the northwest. A seasonal stream called Dry Run meanders along the northeast side of the site.

The SLDA site occupies approximately 44 acres (17.8 hectares) and is bounded by the community of Kiskimere to the southwest and vacant undeveloped land to the southeast and northeast. The former Parks Nuclear Fabrication facility site is located adjacent to and northwest of the SLDA site. Currently, the Parks site is vacant land owned by Babcock & Wilcox Technical Services Group, Inc. (BWXT).

Land use within the vicinity of the SLDA site is mixed, consisting of small residential communities, individual rural residences, small farms with croplands and pastures, idle farmland, forested areas, and light industrial properties.

1.6.3 Site History

In 1957, the Apollo Nuclear Fabrication Facility began operations in Apollo, Pennsylvania, under AEC license No. SNM-145. Between 1961 and 1970, Nuclear Materials and Equipment Corporation (NUMEC), who owned both the Apollo Facility and the Parks Facility including the SLDA, buried process and other wastes reportedly from the Apollo plant at the SLDA site. According to historical documents, these wastes were reportedly buried in accordance with AEC regulation 10 CFR 20.304, Disposal by Burial in Soil, which was subsequently rescinded in 1981. In 1967, NUMEC stock was bought by Atlantic Richfield Company (ARCO) and the use of the SLDA for radioactive waste disposal was reportedly discontinued after 1970 although anecdotal information suggest it continued for a few more years. In 1971, the Babcock & Wilcox Company (B&W) acquired NUMEC. In 1997, BWX Technologies, Inc. assumed ownership of the SLDA. BWX Technologies, Inc. became BWXT and is the current owner. However, ARCO retains environmental liability for the SLDA site.

Based on reports prepared by ARCO/B&W, and discussions with individuals familiar with disposal operations at SLDA, the waste materials were reportedly placed into a series of pits that were constructed adjacent to one another. From geophysical surveys performed at the site, these pits appear as linear trenches and are depicted on site drawings as trenches. These geophysical anomalies were labeled as “trenches 1 through 10”; this numbering scheme was based partially on the sequential construction and use of each trench (1 being the oldest trench and 9 being the most recently constructed trench in the upper trench area). Trench 10 is located in another part of the site and was used for disposal purposes throughout the 1960s and during 1970. In 1965, the contents of trenches 2, 4 and 5 were excavated and collected in the area between those trenches.

After sorting through the material, packaging and disposing of some waste off-site, the remainder of the material, then mixed, was placed back in the 3 originating open trenches. It is likely that when attempting to replace the contents (material mixed with soil) it was less dense and filled the trenches to the surface, making it impossible to replace the overlying 3 to 4 feet with clean soil.

The results of the human health Baseline Risk Assessment (BRA) indicate that the previously disposed of wastes within the trenches contain significant concentrations of radioactive contaminants, and these materials could pose a potential risk to human health in the future. The estimated annual dose to a hypothetical Subsistence Farmer from exposures to these materials exceeds decommissioning criteria established in 10 Code of Federal Regulations (CFR) 20.1402, Radiological Criteria for Unrestricted Use. Hence it was deemed necessary to evaluate remedial action alternatives to address the contaminated materials present at the SLDA site. These alternatives were developed and evaluated in the Feasibility Study (FS) (USACE, 2006). The scope of this response action addresses americium-241 (Am- 241), plutonium-239 (Pu-239), plutonium-241 (Pu-241), radium-228 (Ra-228), thorium- 232 (Th-232), uranium-234 (U-234), uranium-235 (U-235), and uranium-238 (U-238) contamination in waste and soil at the SLDA site. As discussed, additional information suggests the potential for some other radioactive materials to be present including but not limited to activation and fission products, uranium-233 (U-233), uranium-232 (U-232), plutonium-238 (Pu-238), Ra-226 as well as other nonuranium radiounuclides resulting from feed to NUMEC processes that may have originated from recycled fuel. Anecdotal information suggests that NUMEC may have received and buried wastes at SLDA that originated from locations other than Apollo or Parks. Ground water was determined not to be impacted and, therefore, no remedial action is necessary for ground water.

1.6.4 Regulatory Background

The authority for this response action is found in Section 8143 of the Fiscal Year 2002 Defense Appropriations Act, Public Law 107-117, which, subject to subsections (b) through (e) of section 611 of Public Law 106-60 (113 Stat. 502; 10 U.S.C. 2701 note), directs the Secretary of the Army, acting through the Chief of Engineers, to clean up radioactive waste at the SLDA site under the FUSRAP. This law also directs the USACE to clean up radioactive waste at the SLDA site, consistent with the July 5, 2001 MOU between the NRC and USACE for the coordination of cleanup and decommissioning of FUSRAP sites with NRC-Licensed Facilities. Any chemical contamination that is not co-mingled with radioactive waste cannot be addressed by the USACE under FUSRAP by the authority provided in Section 8143 of Public Law 107-117.

The USACE is remediating the SLDA site subject to CERCLA and its implementing regulations found in the National Oil and Hazardous Substances Pollution Contingency Plan 40 CFR 300. The Administrative Record file for the SLDA site is located at the following locations:

U.S. Army Corps of Engineers, Pittsburgh District 100 Liberty Avenue Pittsburgh, Pennsylvania 15222

Apollo Memorial Library

219 North Pennsylvania Avenue Apollo, Pennsylvania 15613

Within the CERCLA process, the Remedial Investigation (RI), Feasibility Study (FS), Proposed Plan (PP), and ROD have all been completed. The ROD, approved in September 2007, formally provides the clean up alternative to be used at the site. The ROD requirement is to excavate radiologically contaminated material to unrestricted levels (subsistence farmer) and transport the material out of state to an approved disposal facility. For additional background information, please refer to the SLDA Project Website: http://www.lrp.usace.army.mil/fusrap/slda.htm.

The site is currently owned by BWXT and is maintained under NRC license SNM-2001. The NRC has placed BWXT License SNM-2001 in abeyance in order for the USACE to conduct remedial action activities per the ROD. During this continuing period of license abeyance, USACE has control of the site for the purposes of protecting public health & safety, and radiation control.

1.6.5 ROCs and Soil Cleanup Goals

The eight specific ROCs identified at the SLDA site are: Am-241, Pu-239, Pu-241, Ra-228, Th-232, U- 234, U-235, and U-238. Radionuclide-specific soil clean-up goals for the SLDA site are as follows:

Radionuclide DCGLw (pCi/g)

Am-241 28 Pu-239 33 Pu-241 890 Ra-228 1.7 Th-232 1.4 U-234 96 U-235 35 U-238 120

If a mixture of radionuclides is present at a given location, then the Sum of Ratios (SOR) applies per the MARSSIM. For example, using the DCGLw values for soil, the following equation is obtained:

4.1

7.1

UUUThPuPuAmRa

SOR

1.6.6 Applicable or Relevant and Appropriate Requirements

The Applicable or Relevant and Appropriate Requirements (ARARs) for the SLDA site is 10 CFR Section 20.1402 (Radiological Criteria for Unrestricted Use). 10 CFR 20.1402 considers a site to be acceptable for unrestricted use if residual radioactivity exceeding background results in a total effective dose equivalent (TEDE) that does not exceed 25 millirem (mrem) per year to the average member of the critical group, including that from groundwater sources of drinking water, and that the residual radioactivity has been reduced to levels that are as low as reasonably achievable (ALARA). The critical group was determined to be subsistence farmer.

1.7 ISSUANCE OF TASK ORDERS

For each Task Order to be awarded under this IDIQ SATOC, the KO will provide the CONTRACTOR with a Performance Work Statement describing all work or services required. The CONTRACTOR shall provide the Government with a cost estimate within 14-30 days of the request unless specifically directed otherwise, depending on the work/Task Order. The individual Task Orders will be either firm fixed price, cost plus fixed-fee, or cost plus incentive fee. The CONTRACTOR's proposal shall be supported by necessary documentation such as drawings, calculations, catalog cuts, specifications, and architectural renderings, to indicate that adequate engineering and planning to accomplish the requirement has been done. The Government will review the proposal for completeness and negotiate with the CONTRACTOR. Task Orders will then be issued by the KO. For FFP and well defined Task Orders, the CONTRACTOR will not be reimbursed for cost proposal preparation. The KO may consider paying a set proposal fee for difficult requirements such as those related to remediation of material. The CONTRACTOR will make every effort to maximize the use of local personnel to minimize travel costs.

1.8 REQUIREMENTS FOR COST REIMBURSEMENT TASK ORDERS

1.8.1 Contract Management Procedures

The CONTRACTOR will have in place standard operating procedures consistent with the Federal Acquisition Regulation (FAR) to cover its detailed procedures relating to cost reimbursement contracted work with the Government.

1.8.2 Cost Control

The CONTRACTOR shall exercise adequate cost control policies and procedures described herein.

1.8.3 Accounting System Capabilities

The CONTRACTOR’s accounting system must be able to estimate, budget, account for, and report costs by funding source as well as work item. To the extent practical the Government will attempt to segregate Task Orders or other work authorizations to a sole funding source for administrative convenience. The CONTRACTOR shall make available, upon request, supporting documents and provide for physical inspection or demonstration at the appropriate office, showing that its accounting system is capable to support cost reimbursement contract accounting needs.

1.8.4 Management Organization, Responsibilities, and Authorities

The objective of cost reimbursement Task Orders is to obtain the specified work or service on time at the least possible cost. As such, the CONTRACTOR must have a management team and organization capable of performing its own management and subcontract management effectively and efficiently.

Managers identified as key personnel must have the relevant experience, training, and education to perform the possible scope of services. The primary Government authority under the contract is the KO.

Representatives of the KO appointed in writing as authorized Contracting Officer's Representative (COR) may also provide direction from the Government, but only in limited circumstances. Only the KO may cause an increase in the contract obligation amount or schedule. Technical direction under a cost reimbursement Task Order may also be made by the COR as long as it does not impact cost or schedule.

1.8.5 Mobilization

Mobilization is a non-recurring cost unique to individual work sites for a given Task Order. Costs for mobilization will be reimbursed, if incurred, after formal execution of the relevant cost reimbursement Task Order. Mobilization costs prior to formal Task Orders are not reimbursable. CONTRACTOR must segregate non-recurring costs such as mobilization when submitting Task Order proposals.

1.8.6 Management Information System

1.8.6.1 Prior to the award of a cost reimbursable Task Order, the Contractor shall demonstrate that their Management Information System (MIS) has been approved by the Government. The MIS is considered critical to the success of cost reimbursable Task Orders.

1.8.6.2 This MIS should integrate cost and schedule information to provide at a minimum: daily tracking of costs incurred, daily tracking of costs scheduled, projection of cost and schedules, earned value, and time phased budget and spending curves. Automated information should be remotely accessible at the work site and other locations to allow for daily cost tracking of actual labor (both on-site and home office), equipment, purchases, subcontracts, other commitments, obligations, and expenditures. This system should be able to be used as a project management tool to capture committed or obligated costs as they occur, not when reconciled at invoice.

1.8.6.3 As a minimum the system must have the following capabilities. All of these capabilities may not be required on every Task Order and will be required for each specifically based upon the need.

The cost tracking system shall be maintained on-site and shall provide real time ability to capture costs.

The cost tracking system shall have the ability to forecast costs.

The cost tracking system shall provide a daily report for review and approval by the Government.

The cost tracking system shall allow for active management and budgeting of Task Order costs, including but not limited to home office costs, direct field costs, indirect costs, subcontractor costs, equipment costs, and other project costs.

The cost tracking system shall have the ability to provide a weekly cost comparison/cost variance report. This report shall capture all committed/expended costs and shall allow the comparison of the forecasted total Task Order cost with the budgeted cost. It shall also show the overruns/under runs on the individual Task Order tasks.

1.8.6.4 The CONTRACTOR shall provide MIS procedures anticipated for tracking all phases of cost, from daily subcontracting, material, labor and overheads, through the phase required to invoice for cost.

The daily cost tracking shall be performed in a WBS format, with various defined levels of control. The upper levels of the WBS shall be where the Contractor’s costs roll-up to levels where the COR will manage costs and funding. For example, Level 1 would be the total project and Level 2 will be Engineering, Construction and Fee. The lower level of the WBS shall be where the Contractor controls costs per his own accounting system. The MIS and/or accounting system must be capable of recording and tracking costs by separate project funds in addition to work schedule items. Earned Value reporting is expanded at the upper levels of the WBS.

1.8.6.5 The planning and scheduling system shall be based on a network theory embodied in the CPM that shows the time needed for each step of the project and also the steps that must be taken in a logical sequence. This should include a standard network analysis system that can be resource loaded for cost and manpower projections and earned value analysis.

1.8.6.6 The CONTRACTOR shall track technical and regulatory reports using the MIS for each project, as required in the Task Order. These systems reports shall contain the following information, at a minimum: Contract number, CONTRACTOR name, project name, reporting period, scheduled completion date, actual completion date.

1.8.7 Work Allocation Document

1.8.7.1 The Work Allocation Document (WAD) system may be used to allocate previously obligated contract funds by the Government to the CONTRACTOR and to further control the obligation or expenditures of funds for identified work. It is a series of numbered documents directly related to the Work Breakdown Structure (WBS) prepared by the CONTRACTOR, and approved by the KO or COR.

1.8.7.2 After Task Order issuance, the Government may request the CONTRACTOR to submit WAD budgets in the Government-specified WAD system format. This format will include: a) an approved WBS; b) an estimate keyed to the WBS; c) a schedule for the task; and d) a narrative description of the scope of work. The Government will review the submitted WAD/WADs and approve/disapprove as necessary. The budget estimates of costs for the work orders submitted for each WAD shall not exceed the total budget for that order.

1.8.7.3 If a WAD request includes work that is beyond the scope of work or services in the Task Order, a modification is required. When a modification is necessary, the CONTRACTOR must revise the WAD request to include this work.

1.8.7.4 Once WAD approval has been obtained, the CONTRACTOR will submit requests to the Government for the release of budget for one or more work orders/work elements within each WAD. No work will be performed until Government approval has been received and the budget is established for the task. The CONTRACTOR is authorized to expend and/or obligate funds under the order up to the dollar value authorized by the individual WAD. The Government may not reimburse the CONTRACTOR for costs incurred in excess of WAD allocations. Only allowable, allocable and reasonable costs will be considered for payment.

1.8.7.5 Transfer of funds between WADs due to overruns/underruns will be strictly controlled by the Government. It is possible that WADs could have more than one funding source. If this is the case, the WBS for that WAD will identify and segregate funding sources into separate work elements for tracking and control.

1.8.7.6 The Government will not automatically utilize the WAD process on cost reimbursement Task Orders. Depending on the size, complexity, dollar value, and duration of a cost reimbursement Task Order, the Government may elect to control costs while still authorizing the CONTRACTOR to expend and/or obligate funds up to the full Task Order estimated cost. In either event, the CONTRACTOR is expected to utilize its cost control procedures to deliver to the Government at the least possible cost for the duration and work specified.

1.8.7.7 Work Variation Notice (WVN) and Authority To Proceed (ATP) documents may be utilized at the Government’s discretion. These documents will be initiated by the CONTRACTOR, signed by CONTRACTOR personnel with authority, and submitted to the USACE Project Manager, and other designated personnel, for review and approval. The formats for these documents are available upon request. These documents are to be used for cost reimbursement Task Orders.

1.8.8 Procurement and Subcontracting

1.8.8.1 Just as the Government clearly defines its procurement policy, the CONTRACTOR 's procurement policy shall be clearly delineated. The CONTRACTOR shall utilize procurement and subcontracting procedures consistent with good faith principles and fair dealing. Further, where required, the CONTRACTOR will employ the principles and requirements of the FAR.

1.8.8.2 Adequate staffing to perform subcontract management is required. The CONTRACTOR must have detailed procurement procedures and subcontract program plans. In accordance with FAR 44.203(a), the KO’s consent to a subcontract or approval of the CONTRACTOR’s purchasing system does not constitute a determination of the acceptability of the subcontract terms or price, or of the allowability of costs, unless the consent or approval specifies otherwise.

1.8.9 Subcontractor Changes and Claims

The CONTRACTOR shall minimize subcontract disputes and effectively and efficiently control and process subcontract changes. The Government prefers that subcontract changes be pre-priced, and that the CONTRACTOR implement a formal system of issuing subcontract changes under which obligations are recorded in advance of the Government issuing drawing changes or Task Orders to the

CONTRACTOR.

1.8.10 Closeout Procedures

All cost reimbursement Task Orders will require a final audit by the cognizant audit office of the Federal Government, usually the Defense Contract Audit Agency (DCAA). The CONTRACTOR will have procedures and processes that facilitate quick subcontract and supplier closeout and resolution of disputes.

1.9 SITE-SPECIFIC SUBMITTALS.

Site work shall not commence until an authorized Government official has approved/accepted all of the site-specific submittals required for each specific Task Order to include Insurance Certificates and Payment and Performance Bonds, if applicable. Technical submittals are those required and further described in the Performance Work Statement specifications of each individual Task Order.

1.11 SUBMITTAL PROCEDURES

1.10.1 Submittal Classifications

1.10.1.1 Government Approved - Governmental approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the KO. Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings." Shop drawings shall be submitted in ample time no less than 30 days prior (unless a different time is set in the Task Order) to secure approval prior to the time the items covered thereby are to be delivered to the site. ENG Form 4025 shall be used for the transmittal of shop drawings.

1.10.1.2 Information Only - All submittals not requiring Government approval will be for information only, however there may be comments generated by the Project Delivery Team that require resolution prior to implementation. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.10.2 Approved Submittals

The Government approval of submittals will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the CONTRACTOR of the responsibility for any error which may exist, as the CONTRACTOR under the CQC requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved by the Government, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.10.3 Disapproved Submittals

The CONTRACTOR shall make all corrections required by the KO and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. CAUTION: The CONTRACTOR is cautioned that for each CONTRACTOR's resubmittal required beyond the initial submittal and one resubmittal for corrections required by the KO, the KO will assess Administrative Deduction in the amount of $500.00 from the progress payments due the CONTRACTOR. If the CONTRACTOR considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the KO, for assessing if a change to the contract is warranted. The KO will make a determination of whether the change is authorized and will be implemented by contract modification.

1.10.4 Withholding of Payment

Payment for materials incorporated in the work will not be made if…