Att_2_-_Labor_Rate_Form.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Shallow Land Disposal Area (SLDA) Draft RFP
- Solicitation number
- W912P4-13-R-0001
About this file
Fully Burdened Labor Rates w/Escalation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09_Jan_Draft_RFP_Site_Visit_Sign_In_List.pdf | ||
| W912P4-13-R-0001.pdf | ||
| Haz_Waste_and_Disposal_SCA_Wage_Determination.pdf | ||
| APP_SSHP_Checklist_word_doc_tnr_w_Be_SLDA_PWS_20Sep2012_RHW.doc | DOC document | |
| DBA_Wage_Determination.pdf | ||
| Eng_Form_93.pdf | ||
| SLDA_GFP_Inventory.xlsx | XLSX spreadsheet | |
| LRB-Crane-CertificateOfCompliance.doc | DOC document | |
| Basic_SCA_Wage_Determination.pdf | ||
| AT_OPSEC_Cover_sheet.pdf | ||
| LRB-ContractorMonthlyManhourExposureForm.xls | XLS spreadsheet | |
| e33941_w_Instructions.pdf | ||
| NAVFAC_USACE_PPQ.docx | DOCX document | |
| W912P4-13-R-0001.pdf | ||
| SLDA_Sample_PWS_Rev1.docx | DOCX document | |
| Site_Layout.pdf | ||
| UFGS_01_35_26_Feb_12_Gov'l_Safety_Req_SLDA_SOW_PWS_upd_20Sep2012.doc | DOC document | |
| UFGS_01_35_29.13_Jan_2008_SLDA_SOW_PWS_upd_20Sep2012.rtf | RTF text file |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Fully Burdened Labor Rates - Base Period w/yearly Escalation | ||
| Labor Category | Basic Hourly Rate | Overtime Rate |
| Program Manager | ||
| Project Manager | ||
| Site Superintendent | ||
| Property Manager | ||
| Corporate Quality Manager | ||
| Program Quality Control Manager | ||
| Safety and Health Manager | ||
| Site Safety and Health Officer (SSHO) | ||
| Radiation Safety Officer | ||
| Assistant Radiation Safety Officer | ||
| Construction Quality Control Systems Manager | ||
| Nuclear Material Accountability Officer | ||
| Nuclear Criticality Safety (NCS) Manager | ||
| Senior NCS Engineer | ||
| Data Acquisition Manager | ||
| Training Coordinator | ||
| Facility Security Officer | ||
| Emergency Manager | ||
| Waste Manager | ||
| Project Chemist | ||
| Civil Engineer | ||
| Hydrogeologist | ||
| Regulatory Specialist | ||
| Cost Scheduler | ||
| Senior Geophysicist | ||
| Site Geophysicist | ||
| Senior Contracts Manager | ||
| Contract Specialist | ||
| Scientist I | ||
| Scientist II | ||
| Scientist III | ||
| Engineer I | ||
| Engineer II | ||
| Engineer III | ||
| Certified Industrial Hygienist | ||
| Industrial Hygienist | ||
| Certified Safety Professional | ||
| Certified Health Physicist | ||
| Geographic Information Systems Manager | ||
| Risk Assessor | ||
| Surveyor | ||
| Administrator (Field Office) | ||
| Administrator (Home Office) | ||
| Finance Manager | ||
| Logistics Manager | ||
| Logistics Specialist | ||
| Indirect Rates | % | |
| Overhead | ||
| G&A | ||
| Fringe | ||
| FCCOM Equipment | ||
| FCCOM O/H | ||
| FCCOM G&A |
Proposed Yearly Escalation Rate
Sheet2
Sheet3
File details come from the government source that posted it. Updated .