About this file

This document includes construction drawings and an equipment floor plan for a proposed Engineering Housing and Maintenance Shop (EHMS) at Camp Santiago Joint Training Center in Salinas, Puerto Rico. The drawings depict the layout and dimensions of the supply warehouse area within the EHMS building, including clearances for aisles and doors. Key equipment to be installed in this area includes a supply office, supply toilet, and various types of shelving and racks as denoted in the legend.

The related federal contract opportunity is a solicitation issued by the Department of the Army National Guard to provide general construction services for the proposed EHMS building project. The contractor will be responsible for furnishing all labor, materials, tools and equipment necessary to complete the construction work as detailed in the statement of work. This includes building the DPW facility and supply warehouse depicted in the construction drawings. The period of performance and response deadline are not specified.

View the file

Other files

File Type Posted
OF1419 - Abstract of Offers.pdf PDF
W912LR24B0001 DPW MILCON BID TABULATION-Final.pdf PDF
W912LR24B0001 - Ammendment 003 Modification Summary.pdf PDF
W912LR24B0001 - Ammendment 003 Conform Copy.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 02_08-Mar-2024.pdf PDF
(Revised) Questions and Answers to RFIs.xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 02_08-Mar-2024.pdf PDF
Questions and Answers to RFIs - W912LR-24-B-0001 .xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Conform Copy).pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 01_08-Mar-2024.pdf PDF
Geotechnical Report.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 01_08-Mar-2024.pdf PDF
Lead Based Paint Inspection Report DPW Buildings 38 56 57.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 01_08-Mar-2024.pdf PDF
LEAD-BASED PAINT INSPECTION REPORT BLDGs 50 54 55 58.pdf PDF
Asbesto Reports DPW Buildings.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Modification Summary).pdf PDF
DPW - Pre Proposal Conference Minutes.pdf PDF
W912LR24B0001 - Ammendment 0001.pdf PDF
DPW Site Visit Attendance List 30JAN24.pdf PDF
Site Visit Project Description DPW.pptx PPTX presentation
Pre-Proposal Site Visit Slides - DPW 30JAN24 (003).pptx - Read-Only.pptx PPTX presentation
Attachment 02 - PRARNG EHMS Camp Santiago SPECS Vol 2 of 2 REV 19-July-2023.pdf PDF
Attachement 07 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 05 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
W912LR-24-B-0001 DPW Solicitation.pdf PDF
Attachement 06 - PRARNG EHMS Camp Santiago DRAWINGS Final 19 July 2023.pdf PDF
Attachment 01 - PRARNG EHMS Camp Santiago SPECS Vol 1 of 2 REV 19-July-2023.pdf PDF
Attachment 04 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 03 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

RAMP DN

B C

C

D

E FA

SUPPLY WAREHOUSE (OLI)

SUPPLY OFFICE (OLI)

SUPPLY TOILET (OLI)

SW3

SW3

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW1

TYP OF 96

CLEAR

6' MIN

CLEAR

5' MIN

CLEAR

5' MIN

CLEAR

4' MIN

CLEAR

4' MIN

CLEAR

5' MIN

CLEAR

7' MIN

EQUIPMENT PLAN GENERAL NOTES

1. REFER TO Q-601 EQUIPMENT SCHEDULE FOR DESCRIPTIONS AND UTILITY REQUIREMENTS.

2. REFER TO A-601 AND A-602 FOR FF&E THAT WILL BE LOCATED IN THE SHOPS.

D

C

B

A

1 2 3 4 5

Designed:

Drawn :

Checked:

Drawing No.:

Date:

Drawing Title:

Jacobs Project No.:

Scales:

P U

E R

T O

R

IC

O A

R M

Y N

A T

IO

N

A L

G U

A R

D C

A M

P S

A N

T

IA

G O

S A

L

IN

A S

P

U E

R T

O R

IC

O

E N

G

IN

E E

R

IN

G H

O U

S

IN

G

M A

IN

T

E N

A N

C E

S H

O P

E

H M

S

D3250109

DATEREV DESCRIPTION

501 North Broadway, Saint Louis, Missouri 63102

Metro Office Park 17 Street 2, Suite 400, Guaynabo, PR 00968

CH2M HILL‐

HDR JV

BID FINAL 100% DESIGN

B

IM

/U

S P

R T

B D

P

R A

R N

G P

R A

R N

G E

H M

S /P

R A

N G

E H

M S

A rc h .r v t

/8

/2

:1

:1

A

M

Q-102RHY

LEV

GS

EQUIPMENT

FLOOR PLAN

(SUPPLY WAREHOUSE OLI)

2 JUNE 2023

1/8" = 1'-0"

A-201

A1

EQUIPMENT FLOOR PLAN (SW OLI)

1/8" = 1'-0"

24'4' 8' 16'

N

1 AMENDMENT 01 03/08/24

Sheets
Q-102 - FLOOR PLAN (SUPPLY WAREHOUSE OLI)

File details come from the government source that posted it. Updated .