About this file

This document includes construction drawings and specifications for a Department of Public Works Engineering Housing and Maintenance Shop to be built at Camp Santiago Joint Training Center in Salinas, Puerto Rico. The drawings provide details for construction of the facility, including casework, countertops, electrical and plumbing fixtures, finishes, and accessibility requirements. Specifications cover general construction work for the project including provision of all materials, labor, tools, equipment and transportation. The related federal contract opportunity is a solicitation for project number 431850 to perform the construction in accordance with the provided drawings and specifications, with the work to be completed for the Department of the Army National Guard.

View the file

Other files

File Type Posted
OF1419 - Abstract of Offers.pdf PDF
W912LR24B0001 DPW MILCON BID TABULATION-Final.pdf PDF
W912LR24B0001 - Ammendment 003 Modification Summary.pdf PDF
W912LR24B0001 - Ammendment 003 Conform Copy.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 02_08-Mar-2024.pdf PDF
(Revised) Questions and Answers to RFIs.xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 02_08-Mar-2024.pdf PDF
Questions and Answers to RFIs - W912LR-24-B-0001 .xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Conform Copy).pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 01_08-Mar-2024.pdf PDF
Geotechnical Report.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 01_08-Mar-2024.pdf PDF
Lead Based Paint Inspection Report DPW Buildings 38 56 57.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 01_08-Mar-2024.pdf PDF
LEAD-BASED PAINT INSPECTION REPORT BLDGs 50 54 55 58.pdf PDF
Asbesto Reports DPW Buildings.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Modification Summary).pdf PDF
DPW - Pre Proposal Conference Minutes.pdf PDF
W912LR24B0001 - Ammendment 0001.pdf PDF
DPW Site Visit Attendance List 30JAN24.pdf PDF
Site Visit Project Description DPW.pptx PPTX presentation
Pre-Proposal Site Visit Slides - DPW 30JAN24 (003).pptx - Read-Only.pptx PPTX presentation
Attachment 02 - PRARNG EHMS Camp Santiago SPECS Vol 2 of 2 REV 19-July-2023.pdf PDF
Attachement 07 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 05 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
W912LR-24-B-0001 DPW Solicitation.pdf PDF
Attachement 06 - PRARNG EHMS Camp Santiago DRAWINGS Final 19 July 2023.pdf PDF
Attachment 01 - PRARNG EHMS Camp Santiago SPECS Vol 1 of 2 REV 19-July-2023.pdf PDF
Attachment 04 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 03 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5'

8"

11' - 9 1/2"

3'

5/

8"

3' - 10 3/8"

3'

/8

3' - 3 1/8"SSM-2 TOP

OPENINGS FOR FUTURE FLAT FILE

CABINETS BY OTHERS.

NOTE: SEE DETAILS D2/A572

AND D3/A572 FOR ADDITIONAL

INFORMATION.

D2

A-572

3/

8" 1'

1/ 8"

1/

4" 1'

0"

3'

6"

5' - 8" EQEQ

A-572

A1

D3

A-572

FLAT

FILE BY

OTHERS

FLAT

FILE BY

OTHERS

END

PANEL

THREE

DRAWER

UNIT

THREE

DRAWER

UNIT

OPEN

CUBBIES

FOR

ROLLED

DRAWINGS

5'

8"

11' - 9 1/2"

1'

7"

1'

7/

8"

8' - 6 3/8"

7' - 11 1/4"

OPEN

TO

FLOOR

FILLER

PANEL

1' - 9"

DRAWER FRONT:

3/4" MDF WITH PL-2

LAMINATE FINISH

CONTINUOUS LIGHT

VALANCE: 3/4" MDF WITH

PLASTIC LAMINATE FINISH

1/4" WHITE PLASTIC

LAMINATE PANEL

DOOR: 3/4" MDF WITH

PLASTIC LAMINATE FINISH

CASE: 3/4" WHITE PLASTIC

LAMINATE WITH PVC

EDGEBAND TO MATCH

LAMINATE

PLASTIC LAMINATE

ADJUSTABLE SHELF.

REFER TO B1/A-572

SOLID SURFACE

COUNTERTOP, BACKSPLASH,

AND SIDESPLASHES (WHERE

INDICATED)

BOTTOM FINISH PLASTIC

LAMINATE

1 1/2" X 1 1/2" ANGLE

CABINET PULL CENTERED

ON DOOR , TYPICAL

PLASTIC LAMINATE

ADJUSTABLE SHELF,

REFER TO B1/A-574

CASE 3/4" WHITE PLASTIC

LAMINATE WITH PVC

EDGEBAND TO MATCH

WOOD BLOCKING TYP,

AS REQUIRED.

PLASTIC LAMINATE DOOR

1' - 0"

1' - 0 3/4"

2'

6"

2'

4" 2"

2'

1'

8"

A-572

A2

TILE BACKSPLASH. REFER TO

ELEVATIONS FOR LOCATIONS.

1' - 8"

4" 1'

1/

4" 6" 1/

4"

1/

2"

2'

1/

2"

GYPSUM BOARD SOFFIT

2' - 1"

A-572

B2

3/4" SOLID SURFACE

COUNTERTOP WITH

EASED EDGE

3/4" MDF

PLASTIC LAMINATE ON

3/4" MDF - ALL EXPOSED

SURFACES OF DRAWER

BACKING SHEET

PULL HANDLE

CENTERED ON

DRAWER UNIT, BASIS

OF DESIGN MOCKETT

DP269 SERIES

PLASTIC LAMINATE ON

POPLAR EDGE

PLASTIC LAMINATE ON

POPLAR EDGE

1/ 4"

6" 3/

4" 3/

4"

1"

PULL HANDLE

CENTERED ON

DRAWER UNIT, BASIS

OF DESIGN MOCKETT

DP269 SERIES

2X4 CONTINUOUS WITH 3/8" DIAMETER

WEDGE ANCHORS (TORQUE TEST

PER IR 26) AT 24" O.C. (2 1/2" MINIMUM

EMBEDMENT) USE #8 BUGLE HEAD

FINISHED FLOOR

2X WOOD FRAME

BASE AS SCHEDULED

OVER 3/4" PLYWOOD

NOTE: FLUSH OVERLAY

CONSTRUCTION

PLASTIC LAMINATE

ON 3/4" MDF BASE

CABINET DOOR -

PLASTIC LAMINATE

ON 3/4" MDF#8 X 1 1/2" BUGLE

HEAD SCREWS AT 12"

O.C. MAXIMUM

#10 X 3" LONG

FHWS AT 12" O.C.

3"

4"

3/4" MDF

3/4" SOLID

SURFACE APRON

RECESSED ELECTRICAL UNIT WITH

1 HDMI/2 ELECTRICAL PLUG/1 DATA

1/

2"

1/ 2"

1"

3/4" SOLID

SURFACE

COUNTERTOP WITH

EASED EDGE3/

4" 3/

4"

1"

2X4 WOOD FRAMING

3 1/2" SOUND

ATTENUATION

BLANKETS - FRICTION FIT

CABINET - PL-2 ON

3/4" MDF

SOLID SURFACE SSM-2

COUNTERTOP

COILING DOOR JAMB

COILING DOOR HOOD

12" STEEL STUD BOX

HEADER REFERENCE

D5/A-604

5/8" GYPSUM BOARD ON

6" 20 GAGE STEEL

STUDS AT 16" OC

3' -1

1/

4"

1'-6"

4"

4"

4"

2' - 6"

1 7/8"

1'

1/ 4"

6" 1/

4" 4"

2'

A-572

B2

A-572

B1

3/4" MDF SHELF WITH 1/2"

DEEP POPLAR EDGING.

COVER ALL EXPOSED

SURFACES WITH WHITE

PLASTIC LAMINATE

BOTTOM OF

CABINET

10" DEEP AT WALL CABINET

1'-4" DEEP AT BASE CABINET

HEAVY-DUTY, STAINLESS

STEEL SHELF STANDARDS

WITH ADJUSTABLE SHELF

BRACKETS - SURFACE

MOUNT

1' -6

A

T B

A S

E C

A B

IN

E

T

1' -0

A

T W

A

LL

C A

B

IN

E T

1" 1"

6"

EQ EQ

WR.01

MARKER BOARD BY OTHERS

EQ EQ

MONITOR PROVIDED BY OTHERS

C E

N T

E R

O F

D

IS

P

LA

Y A

N D

M O

U N

T

5'

AV MONITOR

BLOCKING

E Q

E Q

AV MONITOR

C E

N T

E R

O F

B

LO

C K

IN

G

A F

F

4'

3/

8"

C E

N T

E R

O F

B

LO

C K

IN

G

A F

F

- 1

5/

8"

ABA COMPLIANT SINK AND

FAUCET. REFER TO

PLUMBING

PLASTIC LAMINATE ON

3/4" MDF

BASE - REFER TO ROOM

FINISH SCHEDULE

PREFABRICATED ABA

COMPLIANT UNDERSINK

PROTECTIVE ENCLOUSERE.

INSTALL PER MANUFACTURER'S

RECOMMENDATIONS

SOLID SURFACE

COUNTERTOP, BACKSPLASH,

AND SIDESPLASHES WHEN

ADJACENT TO A PARTITION

CONTINUOUS SEALANT

(AT PARTITION)

2'

2' - 1"

5" 2'

5"

PLASTIC LAMINATE

END PANEL AT

ADJACENT CABINETS

A-572

A1

TEXTURED HIGH IMPACT

SNAP-ON COVER WITH

1/4" RADIUS

FEATHERED EDGE

5/8" GYPSUM BOARD

CONTINUOUS

ALUMINUM

RETAINER

ANCHOR PER

MANUFACTURER'S

RECOMMENDATION

NOTES:

PROVIDE 4" ALUMINUM

BASE - STANDARD FOR

ALL CORNER GUARDS

PROVIDE FIRE RATED

MODEL AT FIRE RATED

PARTITIONS

PROVIDE 7'-2" HIGH

UNLESS OTHERWISE

NOTED

D

C

B

A

1 2 3 4 5

Designed:

Drawn :

Checked:

Drawing No.:

Date:

Drawing Title:

Jacobs Project No.:

Scales:

P U

E R

T O

R

IC

O A

R M

Y N

A T

IO

N

A L

G U

A R

D C

A M

P S

A N

T

IA

G O

S A

L

IN

A S

P

U E

R T

O R

IC

O

E N

G

IN

E E

R

IN

G H

O U

S

IN

G

M A

IN

T

E N

A N

C E

S H

O P

E

H M

S

D3250109

DATEREV DESCRIPTION

501 North Broadway, Saint Louis, Missouri 63102

Metro Office Park 17 Street 2, Suite 400, Guaynabo, PR 00968

CH2M HILL‐

HDR JV

BID FINAL 100% DESIGN

B

IM

/U

S P

R T

B D

P

R A

R N

G P

R A

R N

G E

H M

S /P

R A

N G

E H

M S

A rc h .r v t

/7

/2

:4

:5

P

M

A-572DW

MW

MW

ARCHITECTURAL

INTERIOR DETAILS

2 JUNE 2023

1/4" = 1'-0"

A-101

D1

MILLWORK - PLAN TABLE ENLARGED PLAN

1/4" = 1'-0"

A-411

D3

PLAN TABLE SIDE SECTION

1/4" = 1'-0"

A-411

D2

DRAFTING ISLAND BASE

1 1/2" = 1'-0"

A-411

A3

CASEWORK DETAIL UPPER AND LOWER CABINETS

6" = 1'-0"

A-572

A2

COUNTERTOP DETAIL

3" = 1'-0"

A-572

B2

TYPICAL CABINET BASE DETAIL

6" = 1'-0"

A-572

A1

COUNTERTOP DETAIL

1 1/2" = 1'-0"

A-411

A4

RECEPTION COUNTER DETAIL

1 1/2" = 1'-0"

A-572

B1

ADJUSTABLE SHELF DETAIL

1/4" = 1'-0"

A-101

D4

INTERIOR ELEVATION CONFERENCE 151 - MARKER BOARD (CB OLI)

1/4" = 1'-0"

A-101

D5

INTERIOR ELEVATION - BREAK 150 (CB OLI

1" = 1'-0"C1

AV MONITOR - BLOCKING HEIGHT

1 AMENDMENT 01 03/08/24

1 1/2" = 1'-0"C2

CABINET DETAIL

6" = 1'-0"C3

CORNER GUARD DETAILS

File details come from the government source that posted it. Updated .