About this file

This document is an Abstract of Offers for a federal construction solicitation. The solicitation is for Project No. 431850, the construction of a Department of Public Works (DPW) Engineering Housing and Maintenance Shop (EHMS) at Camp Santiago Joint Training Center in Salinas, Puerto Rico. The solicitation number is W912LR24B0001. The solicitation received 4 offers, with the estimated total bid amounts ranging from $18,986,168.10 to $16,490,620. The offers acknowledged 3 amendments to the solicitation. The government estimate for the contract was prepared including profit. The offers provided unit prices and estimated amounts for various contract line items, including the base bid for construction of the DPW building as well as options for additional project elements such as a supply warehouse, classroom/breakroom, paving, and storage/shelving.

View the file

Other files

File Type Posted
W912LR24B0001 DPW MILCON BID TABULATION-Final.pdf PDF
W912LR24B0001 - Ammendment 003 Modification Summary.pdf PDF
W912LR24B0001 - Ammendment 003 Conform Copy.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 02_08-Mar-2024.pdf PDF
(Revised) Questions and Answers to RFIs.xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 02_08-Mar-2024.pdf PDF
Questions and Answers to RFIs - W912LR-24-B-0001 .xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Conform Copy).pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 01_08-Mar-2024.pdf PDF
Geotechnical Report.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 01_08-Mar-2024.pdf PDF
Lead Based Paint Inspection Report DPW Buildings 38 56 57.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 01_08-Mar-2024.pdf PDF
LEAD-BASED PAINT INSPECTION REPORT BLDGs 50 54 55 58.pdf PDF
Asbesto Reports DPW Buildings.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Modification Summary).pdf PDF
DPW - Pre Proposal Conference Minutes.pdf PDF
W912LR24B0001 - Ammendment 0001.pdf PDF
DPW Site Visit Attendance List 30JAN24.pdf PDF
Site Visit Project Description DPW.pptx PPTX presentation
Pre-Proposal Site Visit Slides - DPW 30JAN24 (003).pptx - Read-Only.pptx PPTX presentation
Attachment 02 - PRARNG EHMS Camp Santiago SPECS Vol 2 of 2 REV 19-July-2023.pdf PDF
Attachement 07 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 05 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
W912LR-24-B-0001 DPW Solicitation.pdf PDF
Attachement 06 - PRARNG EHMS Camp Santiago DRAWINGS Final 19 July 2023.pdf PDF
Attachment 01 - PRARNG EHMS Camp Santiago SPECS Vol 1 of 2 REV 19-July-2023.pdf PDF
Attachment 04 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 03 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

1. SOLICITATION NUMBER

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount)

B. BID SECURITY (Type and amount)

B. BID SECURITY (Type and amount)

B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: W912LR24B0001

2. PROJECT TITLE: Project no. 431850 Construction of Public Works (DPW) Engineering Housing and Maintenance Shop (EHMS) at Camp Santiago Joint Training Center (CSJTC), Salinas, PR

4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond/20%

4B. OFFERS (Continued) BID SECURITY (Type and amount):

4B. OFFERS (Continued) BID SECURITY (Type and amount):

4B. OFFERS (Continued) BID SECURITY (Type and amount):

4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 3

4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:

4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.:

4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:

3B. ESTIMATED QUANTITY:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:

3C. CONTRACT ITEMS. UNIT:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:

4E. OFFERS (Continued) ESTIMATED.: 201612.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.: 201612.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: 7.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:

4E. OFFERS (Continued) ESTIMATED.: 55781.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.: 55781.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: 6.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:

4E. OFFERS (Continued) ESTIMATED.: 98929.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.: 98929.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: 5.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:

4E. OFFERS (Continued) ESTIMATED.: 649234.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.: 649234.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: 4.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:

4E. OFFERS (Continued) ESTIMATED.: 1965280.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: 1965280.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: 3.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:

4E. OFFERS (Continued) ESTIMATED.: 2619194.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: 2619194.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 2.00000000

3B. ESTIMATED QUANTITY: 1.00000000

3C. CONTRACT ITEMS. UNIT: Job

4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 18499474.00000000

4E. OFFERS (Continued) ESTIMATED.: 18499474.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:

4E. OFFERS (Continued) ESTIMATED.:

PAGE OF: 3.00000000

PAGES: 3.00000000

Offeror number. Column 1 of 4.: 7

Offeror number. Column 2 of 4.:

Offeror number. Column 3 of 4.:

Offeror number. Column 4 of 4.:

A. OFFEROR: H&E Development LLC

A. OFFEROR:

A. OFFEROR:

A. OFFEROR:

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

D.

UNIT

E. UNIT

F. ESTIMATED

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

2. DATE ISSUED

3. DATE OPENED

PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE

DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST. QUANTITY

D. UNIT

E. UNIT

PRICE

F. ESTIMATED AMOUNT

D. UNIT

PRICE

E. ESTIMATED AMOUNT

D. UNIT

PRICE

E. ESTIMATED AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT (Without Profit)

C. REASONABLE CONTRACT (Including Profit)

9. OFFERS

NO. 1

NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A.

OPTIONAL FORM 1419 (11-88)

\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg

7A. ITEM NO.

4. ISSUING OFFICE: W912LR USPFO PR Purchasing & Contracting USAG Bldg 541 Borinqueneer ST Forth Buchanan, P.R 00934-4068

5. PROJECT TITLE: Project no. 431850 Construction of Public Works (DPW) Engineering Housing and Maintenance Shop (EHMS) at Camp Santiago Joint Training Center (CSJTC), Salinas, PR

7A. ITEM NUMBER. LINE 1 OF 13: 0001

7A. ITEM NUMBER. LINE 2 OF 13: 0002

7A. ITEM NUMBER. LINE 3 OF 13: 0003

7A. ITEM NUMBER. LINE 4 OF 13: 0004

7A. ITEM NUMBER. LINE 5 OF 13: 0005

7A. ITEM NUMBER. LINE 6 OF 13: 0006

7A. ITEM NUMBER. LINE 7 OF 13: 0007

7A. ITEM NUMBER. LINE 8 OF 13:

7A. ITEM NUMBER. LINE 7 OF 13:

7A. ITEM NUMBER. LINE 10 OF 13:

7A. ITEM NUMBER. LINE 11 OF 13:

7A. ITEM NUMBER. LINE 12 OF 13:

7A. ITEM NUMBER. LINE 13 OF 13:

7B. DESCRIPTION OF OFFERED ITEM: Base Bid - Construction of DPW

7B. DESCRIPTION OF OFFERED ITEM: Option #1 - Supply Warehouse

7B. DESCRIPTION OF OFFERED ITEM: Option #2 Classroom/Breakroom

7B. DESCRIPTION OF OFFERED ITEM: Option #3 - Rigid Concrete/Asphalt Paving

7B. DESCRIPTION OF OFFERED ITEM: Option #4 - Operable Partition

7B. DESCRIPTION OF OFFERED ITEM: Option #5 - Full Height Personnel Lockers

7B. DESCRIPTION OF OFFERED ITEM: Option#6 -Heavy-Duty Shelving Cantilevered

7B. DESCRIPTION OF OFFERED ITEM:

7B. DESCRIPTION OF OFFERED ITEM:

7B. DESCRIPTION OF OFFERED ITEM:

7B. DESCRIPTION OF OFFERED ITEM:

7B. DESCRIPTION OF OFFERED ITEM:

7B. DESCRIPTION OF OFFERED ITEM:

D. UNIT: Job

D. UNIT: Job

D. UNIT: Job

D. UNIT: Job

D. UNIT: Job

D. UNIT: Job

D. UNIT: Job

D. UNIT:

D. UNIT:

D. UNIT:

D. UNIT:

D. UNIT:

D. UNIT:

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY: 1.00000000

7C. ESTIMATED QUANTITY:

7C. ESTIMATED QUANTITY:

7C. ESTIMATED QUANTITY:

7C. ESTIMATED QUANTITY:

7C. ESTIMATED QUANTITY:

7C. ESTIMATED QUANTITY:

E. UNIT PRICE: 13066997.00000000

E. UNIT PRICE: 1599614.00000000

E. UNIT PRICE: 1173892.00000000

E. UNIT PRICE: 103471.00000000

E. UNIT PRICE: 63699.00000000

E. UNIT PRICE: 39800.00000000

E. UNIT PRICE: 110363.00000000

E. UNIT PRICE:

E. UNIT PRICE:

E. UNIT PRICE:

E. UNIT PRICE:

E. UNIT PRICE:

E. UNIT PRICE:

F. ESTIMATED AMOUNT: 13066997.00000000

F. ESTIMATED AMOUNT: 1599614.00000000

F. ESTIMATED AMOUNT: 1173892.00000000

F. ESTIMATED AMOUNT: 103471.00000000

F. ESTIMATED AMOUNT: 63699.00000000

F. ESTIMATED AMOUNT: 39800.00000000

F. ESTIMATED AMOUNT: 110363.00000000

F. ESTIMATED AMOUNT:

F. ESTIMATED AMOUNT:

F. ESTIMATED AMOUNT:

F. ESTIMATED AMOUNT:

F. ESTIMATED AMOUNT:

F. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 12385000.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 1336000.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 904000.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 161000.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 63000.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 48620.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 284661.00000000

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 12385000.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 1336000.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 904000.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 161000.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 63000.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 48620.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE: 284661.00000000

9. OFFERS. NUMBER. 1. D. UNIT PRICE:

9. OFFERS. NUMBER. 1. D. UNIT PRICE:

9. OFFERS. NUMBER. 1. D. UNIT PRICE:

9. OFFERS. NUMBER. 1. D. UNIT PRICE:

9. OFFERS. NUMBER. 1. D. UNIT PRICE:

9. OFFERS. NUMBER. 1. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 16418120.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 682760.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 324480.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 116640.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 46656.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 6998.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE: 183708.00000000

9. OFFERS. NUMBER. 2. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. D. UNIT PRICE:

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 16418120.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 682760.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 324480.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 116640.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 46656.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 6998.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 183708.00000000

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT:

9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT:

6. NUMBER OF AMENDMENTS ISSUED: 3

1. SOLICITATION NUMBER: W912LR24B0001

PAGE OF: 1.00000000

PAGES: 3.00000000

NAME AND TITLE OF CERTIFYING OFFICIAL (Type): Rolando Perez, Maj-Chief of Contracts PRARNG

9. OFFERS. NUMBER. 1. A. OFFEROR: Sustech Integrated Solutions

9. OFFERS. NUMBER. 2. A. OFFEROR: Goldbelt Operations

9. OFFERS. NUMBER. 1. B. BID SECURITY (Type and amount): Bid Bond/20%

9. OFFERS. NUMBER. 2. B. BID SECURITY (Type and amount): Bid Bond/20%

9. OFFERS. NUMBER. 1. C. AMENDMENTS ACKNOWLEDGED: 3

9. OFFERS. NUMBER. 2. C. AMENDMENTS ACKNOWLEDGED: 3

SIGNATURE:

SIGNATURE:

3. DATE OPENED. Enter 2 digit month, 2 digit day and 4 digit year.: 2024-04-10

2. DATE ISSUED. Enter 2 digit month, 2 digit day and 4 digit year.: 2024-01-09

Enter 2 digit month, 2 digit day and 4 digit year.: 2024-04-11

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F). A. HIRED LABOR: 0

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F). B. REASONABLE CONTRACT (Without Profit): 0

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F). C. REASONABLE CONTRACT (Including Profit): 1

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

B.

ESTIMATED

C.

UNIT D. UNIT

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount)

B. BID SECURITY (Type and amount)

B. BID SECURITY (Type and amount)

B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: W912LR24B0001

2. PROJECT TITLE: Project no. 431850 Construction of Public Works (DPW) Engineering Housing and Maintenance Shop (EHMS) at Camp Santiago Joint Training Center (CSJTC), Salinas, PR

4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond/20%

4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond/20%

4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond/20%

4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond/20%

4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 3

4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 3

4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: 3

4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 3

3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:

3B. ESTIMATED QUANTITY:

4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:

3C. CONTRACT ITEMS. UNIT:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:

4E. OFFERS (Continued) ESTIMATED.:

4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:

3C. CONTRACT ITEMS. UNIT:

3B. ESTIMATED QUANTITY:

3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.:

4E. OFFERS (Continued) ESTIMATED.: 157487.40000000

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: 157487.40000000

4E. OFFERS (Continued) ESTIMATED.: 380254.42000000

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: 380254.42000000

4E. OFFERS (Continued) ESTIMATED.: 91001.56000000

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: 91001.56000000

4E. OFFERS (Continued) ESTIMATED.: 138650.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.: 138650.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: 7.00000000

4E. OFFERS (Continued) ESTIMATED.: 117432.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: 117432.00000000

4E. OFFERS (Continued) ESTIMATED.: 281017.99000000

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: 281017.99000000

4E. OFFERS (Continued) ESTIMATED.: 46092.50000000

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: 46092.50000000

4E. OFFERS (Continued) ESTIMATED.: 37030.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.: 37030.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: 6.00000000

4E. OFFERS (Continued) ESTIMATED.: 71906.27000000

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: 71906.27000000

4E. OFFERS (Continued) ESTIMATED.: 137914.13000000

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: 137914.13000000

4E. OFFERS (Continued) ESTIMATED.: 61172.50000000

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: 61172.50000000

4E. OFFERS (Continued) ESTIMATED.: 95250.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.: 95250.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: 5.00000000

4E. OFFERS (Continued) ESTIMATED.: 338512.13000000

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: 338512.13000000

4E. OFFERS (Continued) ESTIMATED.: 251935.55000000

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: 251935.55000000

4E. OFFERS (Continued) ESTIMATED.: 222850.05000000

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: 222850.05000000

4E. OFFERS (Continued) ESTIMATED.: 100230.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.: 100230.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: 4.00000000

4E. OFFERS (Continued) ESTIMATED.: 1266207.16000000

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: 1266207.16000000

4E. OFFERS (Continued) ESTIMATED.: 956355.74000000

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: 956355.74000000

4E. OFFERS (Continued) ESTIMATED.: 1103806.02000000

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: 1103806.02000000

4E. OFFERS (Continued) ESTIMATED.: 884630.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: 884630.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: 3.00000000

4E. OFFERS (Continued) ESTIMATED.: 1878477.15000000

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 1878477.15000000

4E. OFFERS (Continued) ESTIMATED.: 2178431.05000000

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 2178431.05000000

4E. OFFERS (Continued) ESTIMATED.: 1773847.65000000

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: 1773847.65000000

4E. OFFERS (Continued) ESTIMATED.: 1283060.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: 1283060.00000000

3C. CONTRACT ITEMS. UNIT: Job

3B. ESTIMATED QUANTITY: 1.00000000

3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 2.00000000

3B. ESTIMATED QUANTITY: 1.00000000

3C. CONTRACT ITEMS. UNIT: Job

4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 16490620.00000000

4E. OFFERS (Continued) ESTIMATED.: 16490620.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 17392440.00000000

4E. OFFERS (Continued) ESTIMATED.: 17392440.00000000

4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 18535837.90000000

4E. OFFERS (Continued) ESTIMATED.: 18535837.90000000

4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 18986168.10000000

4E. OFFERS (Continued) ESTIMATED.: 18986168.10000000

PAGE OF: 2.00000000

PAGES: 3.00000000

Offeror number. Column 1 of 4.: 3

Offeror number. Column 2 of 4.: 4

Offeror number. Column 3 of 4.: 5

Offeror number. Column 4 of 4.: 6

A. OFFEROR: Villavicencio & Associates Const LLC

A. OFFEROR: JM Caribbean Builders Corp

A. OFFEROR: ANG Construction

A. OFFEROR: Three O LLC

File details come from the government source that posted it. Updated .