About this file

This document package includes architectural drawings and specifications for a proposed Engineering Housing and Maintenance Shop (EHMS) at Camp Santiago Joint Training Center in Salinas, Puerto Rico, as well as the corresponding federal contract opportunity notice. The drawings depict the floor plans and signage layout for the proposed EHMS building and associated structures. The contract opportunity is solicitation number W912LR24B0001 issued by the Department of the Army National Guard to construct project number 431850 for the new DPW building at Camp Santiago Joint Training Center. The contractor will be responsible for providing all labor, materials, equipment, transportation and other services necessary for the general construction of the EHMS building as detailed in the statement of work. The response due date and anticipated award date are not specified.

View the file

Other files

File Type Posted
OF1419 - Abstract of Offers.pdf PDF
W912LR24B0001 DPW MILCON BID TABULATION-Final.pdf PDF
W912LR24B0001 - Ammendment 003 Modification Summary.pdf PDF
W912LR24B0001 - Ammendment 003 Conform Copy.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 02_08-Mar-2024.pdf PDF
(Revised) Questions and Answers to RFIs.xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 02_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 02_08-Mar-2024.pdf PDF
Questions and Answers to RFIs - W912LR-24-B-0001 .xlsx XLSX spreadsheet
PRARNG_EHMS_Camp Santiago_DWG S-200_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 73 16.13_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-630_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Conform Copy).pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-802_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG S-503_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 07 42 13.23_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-551_Amendment 01_08-Mar-2024.pdf PDF
Geotechnical Report.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 10 56 29.26_Amendment 01_08-Mar-2024.pdf PDF
Lead Based Paint Inspection Report DPW Buildings 38 56 57.pdf PDF
PRARNG_EHMS_Camp Santiago_SPEC 00 00 00-TOC_Amendment 01_08-Mar-2024.pdf PDF
LEAD-BASED PAINT INSPECTION REPORT BLDGs 50 54 55 58.pdf PDF
Asbesto Reports DPW Buildings.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG Q-102_Amendment 01_08-Mar-2024.pdf PDF
PRARNG_EHMS_Camp Santiago_DWG A-572_Amendment 01_08-Mar-2024.pdf PDF
W912LR24B0001 - Ammendment 002 (Modification Summary).pdf PDF
DPW - Pre Proposal Conference Minutes.pdf PDF
W912LR24B0001 - Ammendment 0001.pdf PDF
DPW Site Visit Attendance List 30JAN24.pdf PDF
Site Visit Project Description DPW.pptx PPTX presentation
Pre-Proposal Site Visit Slides - DPW 30JAN24 (003).pptx - Read-Only.pptx PPTX presentation
Attachment 02 - PRARNG EHMS Camp Santiago SPECS Vol 2 of 2 REV 19-July-2023.pdf PDF
Attachement 07 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 05 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
W912LR-24-B-0001 DPW Solicitation.pdf PDF
Attachement 06 - PRARNG EHMS Camp Santiago DRAWINGS Final 19 July 2023.pdf PDF
Attachment 01 - PRARNG EHMS Camp Santiago SPECS Vol 1 of 2 REV 19-July-2023.pdf PDF
Attachment 04 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 03 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F F

F

F F

F

F F

F M

C P

P

VTD VTD

F

F

A

RAMP DN

F

F

F

VTD

P N

A C

A

B C

C

D

E FA

SUPPLY OFFICE (OLI)

SUPPLY WAREHOUSE (OLI)

SUPPLY TOILET (OLI)

105 105

A2

A-504

A5

A-503

F

G

H

BREAK ROOM

CONFERENCE

1. SIGNAGE MUST MEET ADA AND ABA ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES.

2. ALL SIGNAGE MUST COMPLY WITH UFC 3-120-01. ALL SIGNS MUST BE PAINTED PER THE GRAPHIC

STANDARDS OUTLINED IN A-800.

3. COORDINATE ALL ROOM NUMBERS AND SIGN VERBIAGE WITH CONTRACTING OFFICER PRIOR TO

FABRICATION.

4. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED. CONSIDER

INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES / SIDELIGHTS TO ENSURE THAT SIGN

INSERT IS ACCESSIBLE.

5. CONFIRM ALL EXTERIOR BUILDING NUMBERS AND SIGN VERBIAGE WITH CONTRACTING OFFICER.

6. MOUNT ALL LIKE-SIGNS AT SAME HEIGHT.

7. SEE A-800 FOR SIGNAGE SCHEDULE AND SIGNAGE DETAILS

SIGNAGE GENERAL NOTES

D

C

B

A

1 2 3 4 5

Designed:

Drawn :

Checked:

Drawing No.:

Date:

Drawing Title:

Jacobs Project No.:

Scales:

P U

E R

T O

R

IC

O A

R M

Y N

A T

IO

N

A L

G U

A R

D C

A M

P S

A N

T

IA

G O

S A

L

IN

A S

P

U E

R T

O R

IC

O

E N

G

IN

E E

R

IN

G H

O U

S

IN

G

M A

IN

T

E N

A N

C E

S H

O P

E

H M

S

D3250109

DATEREV DESCRIPTION

501 North Broadway, Saint Louis, Missouri 63102

Metro Office Park 17 Street 2, Suite 400, Guaynabo, PR 00968

CH2M HILL‐

HDR JV

BID FINAL 100% DESIGN

B

IM

/U

S P

R T

B D

P

R A

R N

G P

R A

R N

G E

H M

S /P

R A

N G

E H

M S

A rc h .r v t

/7

/2

:4

:5

P

M

A-802RHY

CED

LEV

ARCHITECTURAL

SIGNAGE PLAN

(OLI)

2 JUNE 2023

1/8" = 1'-0"A1

SIGNAGE FLOOR PLAN (SUPPLY WAREHOUSE OLI)

1/8" = 1'-0"

A-201

A3

SIGNAGE FLOOR PLAN (CONF/BREAK OLI)

N N

1 AMENDMENT 01 03/08/24

File details come from the government source that posted it. Updated .