RFI_MS-009_C-103_PLAN_REVISION_16_JUN_2016(2).pdf
PDF 307 KB Posted
- Attached to
- Construct Engineering Housing Maintenance and Vehicle Maintenance Shops Federal contract opportunity
- Solicitation number
- W912KN-16-R-0009
About this file
Ref RFI MS-009 (OWS) - revised Sheet C-103
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG #36
BL
D
G
BL
D
G
BLDG #66
BLDG #67
BLDG #68
BULKHEAD
RETAINING
WALL
PARKING
PARKING
SIGN
PARKING
PARKING
PARKING
Block Garage & Office
Frame Shed
Steel
HAZMAT
Containment Bldg
1 Story Frame
& Block Medical
Facility
1 Story Frame
& Block
1 Story Modular Office
Building
Block Garage
1 Story Block
12 Story Block
National Guard Militia Museum
Cannon
18"
Maple
Concrete
C on cr et e
C o n c
Diesel
Fuel Tank
8' Hu rri ca ne F en ce
Macadam
Macadam
Macadam
Macadam
Macadam
Macadam
Macadam
Concrete
TIDELANDS PER NJ DEP GIS DATA
B
LD
G
-T
TWO 6" HDPE Gr ave l
Gr av el Gra vel
Grav el
Grav el
9.5
VAULT?
S
S
S
S
BLDG #36
BL
D
G
BL
D
G
BLDG #66
BLDG #67
BLDG #68
BULKHEAD
RETAINING
WALL
PARKING
SIGN
PARKING
PARKING
PARKING
S
MH 4MH 5
MH 5A
COMMUNICATION JUNCTION BOXES
COMMUNICATION JUNCTION BOX
GAS METER
GAS METER
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORI
NG WELL
WV
WV
WV
GV
WV4" DIP SA
N LAT
4" LATERAL FROM UNKNOWN LOCATION
2"
2" WATERLINES NOT CONNECTED
WATERLINES NOT CONNECTED
2" GAS
2" GAS
INLETS #233 & 234 ARE DEBRIS FILLED
6"DIP
6'
OF
" C
ON
C
6"DIP
6" D
IP
4" P
V C
Block Garage & Office
Frame Shed
Steel
HAZMAT
Containment Bldg
1 Story Frame
& Block Medical
Facility
1 Story Frame
& Block
1 Story Modular Office
Building
Block Garage
1 Story Block
12 Story Block
National Guard Militia Museum
Cannon
18"
Maple
Diesel
Fuel Tank
8' Hu rri ca ne F en ce
12" PVC4" P
VC
8" P
V C
#3
#3
#3
#3
No Lege nd
TIDELANDS PER NJ DEP GIS DATA
C.O.
C.O.
C.O.
C.O.
C.O.
B
LD
G
-T
WV
WVWV
D
D
D
C
B
A
1 2 3 4 5
Designed By:
Drawn By:
Checked By:
Drawing No.:
Date:
Drawing Title:
Jacobs Project No.:
Scales:
Key Plan:
Revision:
Date:
By: Description:
N E
W J
E R
S E
Y A
R M
Y N
A
TI
O N
A L
G U
A R
D N
A
TI
O N
A L
G U
A R
D T
R A
IN
IN
G C
E N
TE
R
(N G
TC
S E
A G
IR
T, N E
W J
E R
S E
Y
SU
PE
R
ST
O R
M S
AN
D
Y D
IS
AS
TE
R
R
ES
PO
N
SE
P
R O
JE
C
TS
EN
G
IN
EE
R
IN
G
H O
U
SI
N G
M
AI
N
TE
N
AN
C E
SH
O
P
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P (E
H M
S / F
M S)
FDYD9400
C O
N
TR
A C
T N
U M
B E
R : W
FY
Q -0
9- D
-0
TA
S K
O R
D E
R N
U M
B E
R : Z
K
30 SEPTEMBER 2014
100% BID-FINALS SUBMISSION, ISSUED FOR CONSTRUCTION
Michael R. Lorenz, PE New Jersey License: 24GE03515600
299 Madison Avenue, Morristown, New Jersey 07962
CIVIL
EXISTING CONDITIONS /
SITE DEMOLITION PLAN
R. CROWLEY
M. WERDER
D. CALLAHAN C-103
KEY PLAN
SCALE: 1" = 400'
SHEET NOTES:
1. CONTRACTOR SHALL COORDINATE WITH ON-GOING CONSTRUCTION OF THE
REGIONAL TRAINING INSTITUTE (RTI) PROJECT.
2. CONTRACTOR SHALL COORDINATE WITH ON-GOING CONSTRUCTION OF
SUPERSTROM SANDY DISASTER RESPONSE TELECOM/IT INFRASTRUCTURE
PROJECT.
KEY PLAN
0 20 40 C1
SITE DEMOLITION PLAN
N
MATCH LINE
SEE SHEET C-102
KEY NOTES:
1 REMOVE BUILDINGS #64 AND #64-T AND ASSOCIATED
PAVEMENT. DEMOLITION SHALL INCLUDE REMOVAL OF ALL
BELOW GRADE FOUNDATIONS IN THERE ENTIRETY AND
UTILITIES REMOVED ND CAPPED BACK TO THE EXISTING
MAIN.
REMOVE BUILDINGS #36 AND #65, AND ASSOCIATED
PAVEMENT. AFTER SUBSTANTIAL COMPLETION OF EHMS/FMS
FACILITY. COORDINATE WITH COR ON SCHEDULED
DEMOLITION OF FACILITIES, PROVIDING WRITTEN NOTICE OF
ANTICIPATED DEMOLITION A MINIMUM OF 90 DAYS IN
ADVANCE. DO NOT PROCEED WITH DEMOLITION WITHOUT
WRITTEN PERMISSION FROM COR. DEMOLITION SHALL
INCLUDE REMOVAL OF ALL BELOW GRADE FOUNDATIONS IN
THEIR ENTIRETY AND UTILITIES REMOVED AND CAPPED BACK
TO THE EXISTING MAIN, UNLESS NOTED OTHERWISE.
REMOVE EXISTING ASPHALT PAVEMENT.
REMOVE EXISTING CONCRETE PAVEMENT.
REMOVE EXISTING GAS LINE AND GAS METER.
REMOVE EXISTING UNDERGROUND COMMUNICATIONS LINE
UP TO EXISTING EDGE OF PAVEMENT.
REMOVE EXISTING UNDERGROUND COMMUNICATIONS LINE
UP TO EXISTING JUNCTION BOX.
REMOVE EXISTING SANITARY SEWER AND ASSOCIATED
SANITARY SEWER CLEANOUTS AND MANHOLES. STOP
SANITARY SEWER REMOVAL AT EXISTING EDGE OF
PAVEMENT AND PROVIDE 4-INCH CAP.
REMOVE EXISTING WATERLINE AND ASSOCIATED WATER
VALVES. STOP WATERLINE REMOVAL AT EXISTING EDGE OF
PAVEMENT AND PROVIDE CAP.
REMOVE EXISTING OVERHEAD ELECTRICAL LINE UP TO
EXISTING ELECTRICAL POLE.
PROTECT EXISTING STORM SEWER LINE TO REMAIN IN
SERVICE.
EXISTING MONITORING WELLS TO REMAIN.
REMOVE AND RELOCATE EXISTING DIESEL FUEL TANK TO
FUEL STORAGE ENCLOSURE AT EHMS / FMS PROJECT SITE.
PROTECT AND STORE EXISTING TANKS OUTSIDE THE
DEFINED LIMITS OF DISTURBANCE PRIOR TO RELOCATING TO
EHMS / FMS SITE. COORDINATE WITH COR ON STORAGE
LOCATION.
REMOVE UNDERGROUND CONCRETE OIL/WATER SEPARATOR
VAULT
REMOVE SANITARY SEWER LINE CONNECTED TO OIL/WATER
SEPARATOR. STOP SANITARY SEWER LINE REMOVAL AT
EXISTING EDGE OF GOV. WILSON BLVD AND CAP SANITARY
SEWER TO BE ABANDONED IN PLACE BENEATH ROADWAY.
0 20 40 A1
UTILITY DEMOLITION PLAN
N
MATCH LINE
SEE SHEET C-102
1 6/16/2016 RC PLAN REVISION
(OIL/WATER SEPARATOR REMOVAL)
| NJ-HS-EHMS_FMS-C-103 |
| C-103 |