RFI Log as of 16JUN2016. **NOTE a 2nd site visit opportunity is scheduled Tuesday June 21 2016 at 9 00. See RFI MS-004.

View the file

Other files

File Type Posted
16-R-0009_Amendment_0001.pdf PDF
Maint_Shop_RFI_Log_thru_RFI_034_(28JUN2016).pdf PDF
MS_RFI_Log_(23JUN2016_(1600)).pdf PDF
16-R-0009_Preproposal_sign-in_sheet_-_2nd_site_visit_-_Maint_Shops.docx.pdf PDF
MS_RFI_Log_(23JUN2016_(1200)).pdf PDF
16-R-0009_Preproposal_-_2nd_site_visit_-_Maint_Shops.pdf PDF
RFI_MS-012_Specs_02_82_33_-_removal_ _disposal_of_ACM.pdf PDF
RFI_MS-009_C-103_PLAN_REVISION_16_JUN_2016(2).pdf PDF
RFI_MS-012_Asbestos_Survey_Bldg_demo_Sandy_projects.pdf PDF
MS_RFI_Log_(22JUN2016_(0830)).pdf PDF
RFI_Log_-_Maint_Shops_(Autosaved).pdf PDF
16-R-0009_EXHIBIT_C.doc DOC document
RFI_MS-001_Vehicle_Exhaust_System_pdf.pdf PDF
16-R-0009_Preproposal_conf_minutes.pdf PDF
16-R-0009_1442-pg_1 2.pdf PDF
16-R-0009_Preproposal_sign-in_sheet.pdf PDF
Whitman_Report_-_Asbestos_Env'l_Insp_Activities_at_Sea_Girt.pdf PDF
16-R-0009_EXHIBIT_C.pdf PDF
16-R-0009_EXHIBIT_A.pdf PDF
16-R-0009_EXHIBIT_B.pdf PDF
Geotechnical_Investigation_Report_(May_2014)_Sandy_projects.pdf PDF
EHMS-VMS_Drawings.pdf PDF
RFI_Template.doc DOC document
EHMS-VMS_Specs_2_of_2.pdf PDF
EHMS-VMS_Specs_1_of_2.pdf PDF
16-R-0009_EXHIBIT_D.pdf PDF
16-R-0009_1442_Solicitation.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPFO for New Jersey

Project Name: Maintenance Shops (EHMS / VMS) Project No. 340124 / 340127

RFP No. W912KN-16-R-0009

Date RFP Issued: 31 MAY 2016 Q&A's As of: 16 June 2016

RFI NO

MS- DATE RECEIVED SPEC SECTION DESCRIPTION

DATE TO

ENG./OWNER

DATE FROM

ENG./OWNER

DATE TO

CONTRACTOR COMMENTS

001 6/6/2016 233424 Is there an exhaust removal system specified for this project? 6/6/2016 6/12/2016 6/16/2016 Yes, a Vehicle Exhaust Removal System is required part of the project. Refer to Sheets M-111 (HVAC Plan Layout) and Sheet M-611 (Equipment Schedule [which includes Basis of Design information]), as well as other misc. requirements indicated within the documents (Electrical, etc.). See also Vehicle Exhaust System pdf (separately attached.)

002 6/10/2016 The minutes of the pre-proposal conference item #2, b. states “Project was formerly 2 separate facilities, each with their own source of funding, but is now 2 separate functions combined into one contract.”

Section 00010 – Solicitation Contract Form, shows separate pricing for each “building” as well as separate alternates. Please confirm that pricing is to be submitted based on this “separate” format.

6/10/2016 6/13/2016 6/16/2016 Provide pricing in accordance with solicitation Section 00110, paragraph 2.5.1.4.

003 6/14/2016 The bid forms call for separate pricing for construction of the EHMS and the VMS. There are no drawings detailing the separation and how to construct the areas where they meet if either building is removed and not taken in the contract. Please advise how to figure the MEPS for these areas as well as the exterior & interior construction at the walls that separate the two buildings.

6/14/2016

004 6/15/2016 Will there be another site visit held? 6/16/2016 6/16/2016 YES, one more site visit will be held on TUESDAY, JUNE 21, 2016 at 0900. Meet in the parking lot outside the Construction Office in Bldg 60 in Sea Girt.

Register with Beth Bullock at bethelee.a.bullock.ctr@mail.mil.