EHMS-VMS_Specs_2_of_2.pdf
PDF 13 MB Posted
- Attached to
- Construct Engineering Housing Maintenance and Vehicle Maintenance Shops Federal contract opportunity
- Solicitation number
- W912KN-16-R-0009
About this file
EHMS-VMS Specifications 2 of 2
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW JERSEY ARMY NATIONAL GUARD 30 SEPTEMBER 2014
SUPERSTORM SANDY DISASTER RESPONSE PROJECT ISSUED FOR CONSTRUCTION
EHMS/FMS, SEA GIRT, NEW JERSEY 100% BID-FINALS SUBMISSION
SEALS PAGE 00 01 07 - 1
DOCUMENT 00 01 07 – SEALS PAGE
ARCHITECT OF RECORD
To the best of my knowledge, these Drawings and
Specifications comply with the applicable minimum building codes.
Alfred Consoli
New Jersey Registered Architect No. AI-14676
Exp. Date: _________________________________
SEALS PAGE 00 01 07 - 2
END OF DOCUMENT 00 01 07
ENGINEER OF RECORD
To the best of my knowledge, these Drawings and
Specifications comply with the applicable minimum building codes.
Michael R. Lorenz, PE
New Jersey Professional Engineer No. 24GE03515600
Exp. Date: _________________________________
TABLE OF CONTENTS 00 01 10 - 1
DOCUMENT 00 01 10 – TABLE OF CONTENTS
SECTION
NUMBER
SECTION TITLE
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 SEALS PAGE
00 01 10 TABLE OF CONTENTS
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 14 16 COORDINATION WITH DMAVA-NJ AND NATIONAL GUARD TRAINING
CENTER
01 23 00 ADDITIVE BID ITEMS
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 43 SAFETY, HAZARDOUS MATERIALS AND HEALTH REQUIREMENTS
01 40 00 QUALITY REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 56 39 TEMPORARY TREE AND PLANT PROTECTION
01 60 00 PRODUCT REQUIREMENTS
01 73 29 CUTTING AND PATCHING
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
01 81 13 SUSTAINABLE DESIGN REQUIREMENTS (LEED)
01 91 13 GENERAL COMMISSIONING REQUIREMENTS
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
02 41 16 STRUCTURE DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
TABLE OF CONTENTS 00 01 10 - 2
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 21 00 STEEL JOIST FRAMING
05 31 00 STEEL DECKING
05 40 00 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 53 MISCELLANEOUS ROUGH CARPENTRY
06 40 23 INTERIOR ARCHITECTURAL WOODWORK
06 64 00 PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 00 THERMAL INSULATION
07 41 13.16 STANDING-SEAM METAL ROOF PANELS
07 42 13.13 FORMED METAL WALL PANELS
07 42 13.19 INSULATED METAL WALL PANELS
07 62 00 SHEET METAL FLASHING AND TRIM
07 72 00 ROOF ACCESSORIES
07 72 10 ROOFTOP FALL ARREST SYSTEM
07 72 53 SNOW GUARDS
07 84 13 PENETRATION FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 31 13 ACCESS DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 71 00 DOOR HARDWARE
08 71 13 AUTOMATIC DOOR OPERATORS
08 80 00 GLAZING
08 83 00 MIRRORS
08 90 00 LOUVERS AND VENTS
DIVISION 09 - FINISHES
09 22 16 NON-STRUCTURAL METAL FRAMING
09 29 00 GYPSUM BOARD
TABLE OF CONTENTS 00 01 10 - 3
09 30 00 TILING
09 51 13 ACOUSTICAL PANEL CEILINGS
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 19 RESILIENT TILE FLOORING
09 65 36 STATIC-CONTROL RESILIENT FLOORING
09 67 23 RESINOUS FLOORING
09 68 13 TILE CARPETING
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00 SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES
10 44 13 FIRE EXTINGUISHER CABINETS
10 51 13 METAL LOCKERS
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 - FURNISHINGS
12 21 13 HORIZONTAL LOUVER BLINDS
12 48 13 ENTRANCE FLOOR GRILLES
DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 - CONVEYING EQUIPMENT (NOT USED)
Facility Services Subgroup
DIVISION 21 - FIRE SUPPRESSION
21 05 18 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING
21 05 53 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT
21 13 13 WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22 05 19 METERS AND GAGES FOR PLUMBING PIPING
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
TABLE OF CONTENTS 00 01 10 - 4
22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 PLUMBING PIPING INSULATION
22 11 13 FACILITY WATER DISTRIBUTION PIPING
22 11 16 DOMESTIC WATER PIPING
22 11 19 DOMESTIC WATER PIPING SPECIALTIES
22 11 23 DOMESTIC WATER PUMPS
22 13 13 FACILITY SANITARY SEWERS
22 13 16 SANITARY WASTE AND VENT PIPING
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 15 13 GENERAL-SERVICE COMPRESSED-AIR PIPING
22 15 19 GENERAL-SERVICE PACKAGED AIR-COMPRESSORS AND RECEIVERS
22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS
22 42 13.13 COMMERCIAL WATER CLOSETS
22 42 13.16 COMMERCIAL URINALS
22 42 16.13 COMMERCIAL LAVATORIES
22 42 16.16 COMMERCIAL SINKS
22 42 23 COMMERCIAL SHOWERS, RECEPTORS, AND BASINS
22 45 00 EMERGENCY PLUMBING FIXTURES
22 47 16 PRESSURE WATER COOLERS
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13 DUCT INSULATION
23 07 19 HVAC PIPING INSULATION
23 08 00 COMMISSIONING OF HVAC
23 09 00 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
23 11 23 FACILITY NATURAL-GAS PIPING
23 21 13 HYDRONIC PIPING
23 21 23 HYDRONIC PUMPS
23 31 13 METAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 34 23 HVAC POWER VENTILATORS
23 35 13 DUST COLLECTION SYSTEMS
23 37 13 DIFFUSERS, REGISTERS, AND GRILLES
23 37 23 HVAC GRAVITY VENTILATORS
23 54 16.13 GAS-FIRED FURNACES
23 55 23.13 LOW-INTENSITY, GAS-FIRED, RADIANT HEATERS
23 55 33.16 GAS-FIRED UNIT HEATERS
TABLE OF CONTENTS 00 01 10 - 5
23 81 26 SPLIT SYSTEM AIR CONDITIONERS
DIVISION 26 - ELECTRICAL
26 05 13 MEDIUM-VOLTAGE CABLES
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
26 05 48 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 73.13 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY
26 05 73.16 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 05 73.19 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY
26 09 13 ELECTRICAL POWER MONITORING AND CONTROL
26 09 23 LIGHTING CONTROL DEVICES
26 12 13 LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS
26 22 00 LOW-VOLTAGE TRANSFORMERS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER
CIRCUITS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27 13 00 COMMUNICATIONS BACKBONE CABLING
27 15 00 COMMUNICATIONS HORIZONTAL CABLING
27 41 33 CABLE ANTENNA TELEVISION DISTRIBUTION SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 14 FIRE ALARM AND MASS NOTIFICATION SYSTEM
Site and Infrastructure Subgroup
TABLE OF CONTENTS 00 01 10 - 6
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
31 21 18 GAS VAPOR INTRUSION MITIGATION SYSTEM
31 23 19 DEWATERING
31 31 16 TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 13 13 CONCRETE PAVING
32 13 73 CONCRETE PAVING JOINT SEALANTS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
DIVISION 33 - UTILITIES
33 41 00 STORM UTILITY DRAINAGE PIPING
33 71 49.13 OVERHEAD MEDIUM-VOLTAGE WIRING
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 23 13.13 OVERHEAD BRIDGE CRANE – TOP RUNNING
END OF TABLE OF CONTENTS
ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 21 05 18 - 1
SECTION 21 05 18 - ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Escutcheons.
2. Floor plates.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
PART 2 - PRODUCTS
2.1 ESCUTCHEONS
A. Split-Casting Brass Type: With polished, chrome-plated and rough-brass finish and with concealed hinge and setscrew.
2.2 FLOOR PLATES
A. Split-Casting Floor Plates: Cast brass with concealed hinge.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.
B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with
OD that completely covers opening.
1. Escutcheons for New Piping:
a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.
b. Bare Piping at Wall and Floor Penetrations in Finished Spaces: Split-casting brass type with polished, chrome-plated finish.
c. Bare Piping at Ceiling Penetrations in Finished Spaces: Split-casting brass type with polished, chrome-plated finish.
ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 21 05 18 - 2
d. Bare Piping in Unfinished Service Spaces: Split-casting brass type with rough-brass finish.
e. Bare Piping in Equipment Rooms: Split-casting brass rough-brass finish.
C. Install floor plates for piping penetrations of equipment-room floors.
D. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.
1. New Piping: One-piece, floor-plate type.
3.2 FIELD QUALITY CONTROL
A. Replace broken and damaged escutcheons and floor plates using new materials.
END OF SECTION 21 05 18
IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 21 05 53 - 1
SECTION 21 05 53 - IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Equipment labels.
2. Pipe labels.
3. Stencils.
4. Valve tags.
1.2 SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For color, letter style, and graphic representation required for each identification material and device.
C. Equipment-Label Schedule: Include a listing of all equipment to be labeled and the proposed content for each label.
D. Valve Schedules: Valve numbering scheme.
E. All test results shall be a required submittal to the Government.
F. Contractor shall submit qualifications of any required Independent Testing and Inspection
Agent in advance for Government approval.
1.3 CLOSEOUT SUBMITTALS
A. Maintenance Data: For each piping system to include in maintenance manuals.
PART 2 - PRODUCTS
2.1 EQUIPMENT LABELS
A. Metal Labels for Equipment:
1. Material and Thickness: Anodized aluminum, 0.032 inch thick, with predrilled holes for attachment hardware.
2. Letter Color: White.
3. Background Color: Red.
IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 21 05 53 - 2
4. Minimum Label Size: Length and width vary for required label content, but not less than
2-1/2 by 3/4 inch.
5. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.
6. Fasteners: Stainless-steel rivets or self-tapping screws.
7. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.
2.2 PIPE LABELS
A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service and showing flow direction.
B. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to cover full circumference of pipe and to attach to pipe without fasteners or adhesive.
C. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.
D. Pipe-Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings; pipe size; and an arrow indicating flow direction.
1. Flow-Direction Arrows: Integral with piping-system service lettering to accommodate both directions, or as separate unit on each pipe label to indicate flow direction.
2. Lettering Size: At least 1-1/2 inches high.
E. Pipe-Label Colors:
1. Background Color: Red.
2. Letter Color: White.
2.3 STENCILS
A. Stencils: Prepared with letter sizes according to ASME A13.1 for piping; and minimum letter height of 3/4 inch for access panel and door labels, equipment labels, and similar operational instructions.
1. Stencil Material: Aluminum.
2. Stencil Paint: Exterior, gloss, acrylic enamel red unless otherwise indicated. Paint may be in pressurized spray-can form.
3. Identification Paint: Exterior, acrylic enamel in white.
2.4 VALVE TAGS
A. Valve Tags: Stamped or engraved with 1/4-inch letters for piping-system abbreviation and 1/2-inch numbers.
IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 21 05 53 - 3
1. Tag Material: anodized aluminum, 0.032 inch thick, with predrilled holes for attachment hardware.
2. Fasteners: wire-link chain or S-hook.
3. Valve-Tag Color: Red.
4. Letter Color: White.
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.
3.2 LABEL INSTALLATION
A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.
B. Coordinate installation of identifying devices with locations of access panels and doors.
C. Install or permanently fasten labels on each major item of mechanical equipment.
D. Locate equipment labels where accessible and visible.
E. Piping Color-Coding: Painting of piping is specified in Section 09 91 23 "Interior Painting.”
F. Stenciled Pipe-Label Option: Stenciled labels may be provided instead of manufactured pipe labels, at Installer's option. Install stenciled pipe labels, complying with ASME A13.1, with painted, color-coded bands or rectangles on each piping system.
1. Identification Paint: Use for contrasting background.
2. Stencil Paint: Use for pipe marking.
G. Pipe-Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:
1. Near each valve and control device.
2. Near each branch connection excluding short takeoffs. Where flow pattern is not obvious, mark each pipe at branch.
3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.
4. At access doors, manholes, and similar access points that permit view of concealed piping.
5. Near major equipment items and other points of origination and termination.
6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in areas of congested piping and equipment.
IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 21 05 53 - 4
3.3 VALVE-TAG INSTALLATION
A. Install tags on valves and control devices in piping systems. List tagged valves in a valve-tag schedule.
B. Valve-Tag Application Schedule: Tag valves according to size, shape, and with captions similar to those indicated in "Valve-Tag Size and Shape" Subparagraph below:
1. Valve-Tag Size and Shape:
a. Wet-Pipe Sprinkler System: 2 inches, square.
3.4 WARNING-TAG INSTALLATION
A. Write required message on, and attach warning tags to, equipment and other items where required.
END OF SECTION 21 05 53
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 1
SECTION 21 13 13 - WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Pipes, fittings, and specialties.
2. Fire-protection valves.
3. Fire-department connections.
4. Sprinklers.
5. Alarm devices.
6. Pressure gages.
7. Backflow preventer.
B. Related Sections:
1. Section 07 84 13 “Penetration Firestopping.”
2. Section 07 62 00 "Sheet Metal Flashing and Trim."
3. Section 07 92 00 "Joint Sealants."
4. Section 21 05 18 “Escutcheons for Fire-Suppression Piping.”
5. Section 21 05 53 “Identification for Fire Suppression Piping and Equipment”.
6. Section 28 31 14 “Fire Alarm and Mass Notification System” for connections to the fire alarm system.
1.2 DEFINITIONS
A. Standard-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure of 175 psig maximum.
1.3 SYSTEM DESCRIPTIONS
A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water and that is connected to water supply through alarm valve. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device. Hose connections are included if indicated.
1.4 PERFORMANCE REQUIREMENTS
A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 2
B. Delegated Design: Designer of sprinkler system(s) shall be certified as a Level IV Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic
Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 or by a Professional Engineer licensed in the State of New Jersey.
C. Sprinkler system design shall be approved by authorities having jurisdiction.
1. Margin of Safety for Available Water Flow and Pressure: 5 percent of required pressure at required flow, including losses through water-service piping, valves, and backflow preventers.
2. Sprinkler Occupancy Hazard Classifications shall be based on FM Data Sheet 3-26 criteria as required by UFC 3-600-01. Hazard classifications shall be as follows:
a. Building Service Areas: HC-2.
b. Electrical Equipment Rooms: HC-2.
c. General Storage Areas: HC-2.
d. Mechanical Equipment Rooms: HC-2.
e. Office and Public Areas: HC-1.
f. Assembly area: HC-1.
3. Minimum Density for Automatic-Sprinkler Piping Design:
a. HC-1 Occupancy: 0.10 gpm over 1,500-sq. ft. area.
b. HC-2 Occupancy: 0.2 gpm over 2,500-sq. ft. area.
4. Maximum Protection Area per Sprinkler:
a. HC-1: 225 sq. ft.
b. HC-2: 130 sq. ft.
5. Total Combined Hose-Stream Demand Requirement: According to UFC 3-600-01: 250 gpm
D. Seismic Performance Requirements
1. Seismic-Restraint Loading:
a. Reference Structural Plans and Specifications for seismic restraint loading values.
b. Component Importance Factor for electrical components shall be: 1.5.
c. Reference UFC 3-310-01, “Seismic Design for Buildings”, for additional seismic restraint requirements for mechanical components.
1.5 SUBMITTALS
A. Product Data: For each type of product indicated in this section. If more than one product is listed on product data sheet, clearly annotate which model is to be used.
B. Shop Drawings: For wet-pipe sprinkler systems. Include plans, elevations, sections, details, and attachments to other work.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 3
C. Delegated-Design Submittal: For sprinkler systems indicated to comply with performance requirements and design criteria, including analysis data signed by a NICET Level IV Sprinkler
Technician or Professional Engineer registered in the State of New Jersey.
D. Coordination Drawings: Sprinkler systems, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:
1. Reflected Ceiling Plans.
2. HVAC ductwork.
3. Items penetrating finished ceiling include the following:
a. Lighting fixtures.
b. Air outlets and inlets.
E. Qualification Data: For qualified Installer.
F. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations.
Drawings and calculations shall be prepared by qualified NICET Level IV Technician or
Professional Engineer registered in the State of New Jersey.
G. Welding certificates.
H. Fire Hydrant Test Report.
I. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and
Test Certificate for Aboveground Piping."
J. Field quality-control reports.
K. Operation and Maintenance Data: For sprinkler specialties to include in emergency, operation, and maintenance manuals.
L. All test results shall be a required submittal to the Government.
M. Contractor shall submit qualifications of any required Independent Testing and Inspection
Agent in advance for Government approval.
1.6 QUALITY ASSURANCE
A. Installer Qualifications:
1. Installer's responsibilities include designing, fabricating, and installing sprinkler systems and providing professional engineering services needed to assume engineering responsibility. Base calculations on operation of the fire pump.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 4
a. NICET Level IV Technician Responsibilities: Preparation of working plans, calculations, and field test reports by a qualified NICET Level IV Technician or
Professional Engineer registered in the State of New Jersey.
B. Welding Qualifications: Qualify procedures and operators according to ASME Boiler and
Pressure Vessel Code.
C. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the most recent editions of the following:
1. NFPA 13, "Installation of Sprinkler Systems."
2. NFPA 24, "Installation of Private Fire Service Mains and Their Appurtenances."
1.7 COORDINATION
A. Coordinate layout and installation of the sprinkler system with other construction of other trades, including lighting, HVAC equipment, and partition assemblies.
1.8 EXTRA MATERIALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Sprinkler Cabinets: Finished, wall-mounted, steel cabinet with hinged cover, and with space for minimum of six spare sprinklers plus sprinkler wrench. Include number of sprinklers required by NFPA 13 and sprinkler wrench. Include separate cabinet in each building with sprinklers and wrench for each type of sprinkler used on Project.
PART 2 - PRODUCTS
2.1 PIPING MATERIALS
A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and fitting materials, and for joining methods for specific services, service locations, and pipe sizes.
2.2 STEEL PIPE AND FITTINGS
A. Standard Weight, Black-Steel Pipe: ASTM A 53/A 53M, Type E, Grade B. Pipe ends may be factory or field formed to match joining method.
B. Schedule 10, Black-Steel Pipe: ASTM A 135 or ASTM A 795/A 795M, Schedule 10 in NPS 5 and smaller; and NFPA 13-specified wall thickness in NPS 6 to NPS 10, grooved end.
C. Black-Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M, standard-weight, seamless steel pipe with threaded ends.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 5
D. Uncoated, Steel Couplings: ASTM A 865, threaded.
E. Malleable- or Ductile-Iron Unions: UL 860.
F. Cast-Iron Flanges: ASME 16.1, Class 125.
G. Steel Flanges and Flanged Fittings: ASME B16.5, Class 150.
H. Steel Welding Fittings: ASTM A 234/A 234M and ASME B16.9.
I. Grooved-Joint, Steel-Pipe Appurtenances:
1. Pressure Rating: 175 psig minimum.
2. Uncoated, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe.
3. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern, unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.
2.3 PIPING JOINING MATERIALS
A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch thick.
1. Class 125, Cast-Iron Flanges and Class 150, Bronze Flat-Face Flanges: Full-face gaskets.
B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.
C. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
2.4 LISTED FIRE-PROTECTION VALVES
A. General Requirements:
1. Valves shall be UL listed or FM approved.
2. Minimum Pressure Rating for Standard-Pressure Piping: 175 psig.
B. Ball Valves:
1. Standard: UL 1091 except with ball instead of disc.
2. Valves NPS 1-1/2 and Smaller: Bronze body with threaded ends.
3. Valves NPS 2 and NPS 2-1/2: Bronze body with threaded ends or ductile-iron body with grooved ends.
4. Valves NPS 3: Ductile-iron body with grooved ends.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 6
C. Butterfly Valves:
1. Standard: UL 1091.
2. Pressure Rating: 175 psig.
3. Body Material: Bronze.
4. End Connections: Threaded.
D. Check Valves:
1. Standard: UL 312.
2. Pressure Rating: 250 psig minimum.
3. Type: Swing check.
4. Body Material: Cast iron.
5. End Connections: Flanged or grooved.
E. OS&Y Gate Valves:
1. Standard: UL 262.
2. Pressure Rating: 175 psig.
3. Body Material: Bronze.
4. End Connections: Threaded.
F. NRS Gate Valves:
1. Standard: UL 262.
2. Pressure Rating: 250 psig minimum.
3. Body Material: Cast iron with indicator post flange.
4. Stem: Nonrising.
5. End Connections: Flanged or grooved.
2.5 SPECIALTY VALVES
A. General Requirements:
1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.
2. Pressure Rating:
a. Standard-Pressure Piping Specialty Valves: 175 psig minimum.
3. Body Material: Cast or ductile iron.
4. Size: Same as connected piping.
5. End Connections: Flanged or grooved.
B. Automatic (Ball Drip) Drain Valves:
1. Standard: UL 1726.
2. Pressure Rating: 175 psig minimum.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 7
3. Type: Automatic draining, ball check.
4. Size: NPS 3/4.
5. End Connections: Threaded.
2.6 FIRE-DEPARTMENT CONNECTIONS
A. Provide type as indicated on the drawings.
B. Exposed-Type, Fire-Department Connection:
1. Standard: UL 405.
2. Type: Exposed, projecting, for wall mounting.
3. Pressure Rating: 175 psig minimum.
4. Body Material: Corrosion-resistant metal.
5. Inlets: Brass with threads according to NFPA 1963 and matching local fire-department sizes and threads. Include extension pipe nipples, brass lugged swivel connections, and check devices or clappers.
6. Caps: Brass, lugged type, with gasket and chain.
7. Escutcheon Plate: Round, brass, wall type.
8. Outlet: Back, with pipe threads.
9. Number of Inlets: Two.
10. Escutcheon Plate Marking: Similar to "AUTO SPKR."
11. Finish: Rough brass or bronze.
12. Outlet Size: NPS 4.
2.7 SPRINKLER SPECIALTY PIPE FITTINGS
A. Sprinkler Inspector's Test Fittings:
1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.
2. Pressure Rating: 175 psig minimum.
3. Body Material: Cast- or ductile-iron housing with sight glass.
4. Size: Same as connected piping.
5. Inlet and Outlet: Threaded.
2.8 SPRINKLERS
A. General Requirements:
1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.
2. Pressure Rating for Automatic Sprinklers: 175 psig minimum.
B. Automatic Sprinklers with Heat-Responsive Element:
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 8
1. Characteristics: Nominal 1/2-inch orifice with Discharge Coefficient K of 5.6 for light hazard, and nominal 17/32-inch orifice with Discharge Coefficient K of 8.0 for
"Ordinary" temperature classification rating unless otherwise indicated or required by application.
2. All sprinklers shall be quick response.
C. Sprinkler Finishes:
1. Chrome plated in finished areas.
2. Bronze in mechanical rooms, electrical rooms, storage rooms and other similar areas.
D. Sprinkler Escutcheons: Materials, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed, flush, and recessed-type sprinklers are specified with sprinklers.
1. Ceiling Mounting: Steel painted white, two piece, concealed with 1-inch vertical adjustment. Escutcheon shall thread onto the assembly. Slip-on escutcheons are not permitted.
E. Sprinkler Guards:
1. Standard: UL 199.
2. Type: Wire cage with fastening device for attaching to sprinkler.
3. Guards shall be installed on all pendent sprinklers in mechanical rooms, electrical rooms, storage rooms and other similar areas where susceptible to physical damage, or where less than 7’-6” above finished floor.
2.9 ALARM DEVICES
A. Alarm-device types shall match piping and equipment connections.
B. Water-Flow Indicators:
1. Standard: UL 346.
2. Water-Flow Detector: Electrically supervised.
3. Components: Two single-pole, double-throw circuit switches for isolated alarm and auxiliary contacts, 7 A, 125-V ac and 0.25 A, 24-V dc; complete with factory-set, field-adjustable retard element to prevent false signals and tamperproof cover that sends signal if removed.
4. Type: Paddle operated.
5. Pressure Rating: 250 psig.
6. Design Installation: Horizontal or vertical.
C. Valve Supervisory Switches:
1. Standard: UL 346.
2. Type: Electrically supervised.
3. Components: Single-pole, double-throw switch with normally closed contacts.
4. Design: Signals that controlled valve is in other than normal position.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 9
2.10 PRESSURE GAGES
A. Standard: UL 393.
B. Dial Size: 3-1/2- to 4-1/2-inch diameter.
C. Pressure Gage Range: 0 to 250 psig minimum.
D. Water System Piping Gage: Include "WATER" label on dial face.
2.11 BACKFLOW PREVENTERS
A. Double-Check, Backflow-Prevention Assemblies:
1. Standard: AWWA C510.
2. Operation: Continuous-pressure applications unless otherwise indicated.
3. Pressure Loss: 5 psig maximum, through middle one-third of flow range.
4. Size: 6 inch.
5. Design Flow Rate: 1,000 gpm.
6. Pressure Loss at Design Flow Rate: 3 psig.
7. Body Material: Cast iron or steel with interior lining complying with AWWA C550 or that is FDA approved or stainless steel.
8. End Connections: Flanged or grooved and larger.
9. Accessories: Integral control valves – OS&Y or butterfly.
2.12 BACKFLOW PREVENTER TEST ASSEMBLY
A. Hose Valve Manifold Assembly:
1. Header Pipe: ASTM A 53/A 53M, Schedule 40, galvanized steel with ends threaded according to ASME B1.20.1.
2. Header Pipe Fittings: ASME B16.4, galvanized cast-iron threaded fittings.
3. Automatic Drain Valve: UL 1726.
4. Manifold:
a. Test Connections: Comply with UL 405 except provide outlets without clappers instead of inlets.
b. Body: Flush type, brass or ductile iron, with one outlet for each 250 gpm of system demand or fraction thereof.
c. Nipples: ASTM A 53/A 53M, Schedule 40, galvanized-steel pipe with ends threaded according to ASME B1.20.1.
d. Adapters and Caps with Chain: Brass or bronze, with outlet threaded according to
NFPA 1963 and matching local fire-department threads.
e. Escutcheon Plate: Brass or bronze; rectangular.
f. Hose Valves: UL 668, bronze, with outlet threaded according to NFPA 1963 and matching local fire-department threads.
g. Exposed Parts Finish: Polished brass.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 10
B. Escutcheon Plate Marking: Equivalent to "BACKFLOW PREVENTER TEST."
2.13 PIPING ESCUTCHEONS
A. Refer to Section 21 05 58, “Escutcheons for Fire Suppression Piping.”
2.14 SLEEVES
A. Galvanized-Steel-Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.
2.15 SLEEVE SEALS
A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.
1. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.
2. Pressure Plates: Carbon steel.
3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements.
2.16 RISER CHECK VALVE
A. Description:
1. UL listed.
2. Pressure Rating: 175 psig minimum.
3. Type: Spring-loaded.
4. Body Material: Cast iron.
5. 2-inch main drain included
6. End Connections: Flanged or grooved.
PART 3 - EXECUTION
3.1 HYDRANT FLOW TEST
A. Perform a hydrant flow test in accordance with NFPA 291. Base hydraulic calculations on results of hydrant flow test.
3.2 SERVICE-ENTRANCE PIPING
A. Connect sprinkler piping to water-service piping for service entrance to building. Comply with requirements for exterior piping in Section 22 11 13 “Facility Water Distribution Piping.”
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 11
3.3 PIPING INSTALLATION
A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.
1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Engineer before deviating from approved working plans.
B. Piping Standard: Comply with requirements for installation of sprinkler piping in NFPA 13.
C. Install seismic restraints on piping. Comply with requirements for seismic-restraint device materials and installation in NFPA 13.
D. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.
E. Install unions adjacent to each valve in pipes NPS 2 and smaller.
F. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.
G. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, and sized and located according to NFPA 13.
H. Install sprinkler piping with drains for complete system drainage.
I. Install alarm devices in piping systems.
J. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements for hanger materials in NFPA 13.
K. Install pressure gages on riser or feed main, and at each sprinkler test connection. Include pressure gages with connection not less than NPS 1/4 and with soft metal seated globe valve, arranged for draining pipe between gage and valve. Install gages to permit removal, and install where they will not be subject to freezing.
L. Fill sprinkler system piping with water.
3.4 JOINT CONSTRUCTION
A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.
B. Install unions adjacent to each valve in pipes NPS 2 and smaller.
C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 12
D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.
F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.
G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.
3. Do not thread pipe with wall thickness less than schedule 40.
H. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to "Quality Assurance" Article.
1. Shop weld pipe joints where welded piping is indicated. Do not use welded joints for galvanized-steel pipe.
I. Steel-Piping, Cut-Grooved Joints: Cut square-edge groove in end of pipe according to
AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe joints. Do not cut-groove pipe with wall thickness less than schedule 40.
J. Steel-Piping, Roll-Grooved Joints: Roll rounded-edge groove in end of pipe according to
AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe grooved joints.
3.5 VALVE AND SPECIALTIES INSTALLATION
A. Install listed fire-protection valves, trim and drain valves, specialty valves and trim, controls, and specialties according to NFPA 13 and authorities having jurisdiction.
B. Install listed fire-protection shutoff valves supervised open, located to control sources of water supply except from fire-department connections. Install permanent identification signs indicating portion of system controlled by each valve.
3.6 SPRINKLER INSTALLATION
A. Install sprinklers in suspended ceilings in center of narrow dimension of acoustical ceiling panels.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 13
3.7 FIRE-DEPARTMENT CONNECTION INSTALLATION
A. Install wall-type, fire-department connections.
3.8 ESCUTCHEON INSTALLATION
A. Install escutcheons for penetrations of walls, ceilings, and floors.
B. Escutcheons:
1. Piping with Fitting or Sleeve Protruding from Wall: One piece, deep pattern.
2. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One piece, cast brass with polished chrome-plated finish.
3. Bare Piping at Ceiling Penetrations in Finished Spaces: One piece, cast brass with polished chrome-plated finish.
4. Bare Piping in Unfinished Service Spaces: One piece, cast brass with polished chrome-plated finish.
5. Bare Piping in Equipment Rooms: One piece, cast brass.
6. Bare Piping at Floor Penetrations in Equipment Rooms: One-piece floor plate.
3.9 SLEEVE INSTALLATION
A. General Requirements: Install sleeves for pipes and tubes passing through penetrations in floors, partitions, roofs, and walls or masonry construction.
B. Sleeves are not required for core-drilled holes.
C. Permanent sleeves are not required for holes formed by removable PE sleeves.
D. Cut sleeves to length for mounting flush with both surfaces unless otherwise indicated.
E. Install sleeves in new partitions, slabs, and walls as they are built.
F. For interior wall penetrations, seal annular space between sleeve and pipe or pipe insulation using joint sealants appropriate for size, depth, and location of joint. Comply with requirements for joint sealants in Section 07 92 00 "Joint Sealants."
G. For exterior wall penetrations above grade, seal annular space between sleeve and pipe using joint sealants appropriate for size, depth, and location of joint. Comply with requirements for joint sealants in Section 07 92 00 "Joint Sealants."
H. For exterior wall penetrations below grade, seal annular space between sleeve and pipe using sleeve seals.
I. Seal space outside of sleeves in concrete slabs and walls with grout.
J. Install sleeve materials according to the following applications:
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 14
1. Sleeves for Piping Passing through Concrete Floor Slabs: Galvanized-steel pipe.
2. Sleeves for Piping Passing through Concrete Floor Slabs of Mechanical Equipment Areas or Other Wet Areas: Galvanized-steel pipe.
a. Extend sleeves 2 inches above finished floor level.
b. For pipes penetrating floors with membrane waterproofing, extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.
Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches above finished floor level. Comply with requirements for flashing in Section 07 62 00 "Sheet Metal Flashing and Trim."
3. Sleeves for Piping Passing through Exterior Concrete Walls:
a. Galvanized-steel-pipe sleeves for pipes smaller than NPS 6.
b. Cast-iron wall-pipe sleeves for pipes NPS 6 and larger.
c. Install sleeves that are large enough to provide 1-inch annular clear space between sleeve and pipe or pipe insulation when sleeve seals are used.
4. Sleeves for Piping Passing through Interior Concrete Walls:
a. Galvanized-steel-pipe sleeves for pipes smaller than NPS 6.
b. Galvanized-steel-sheet sleeves for pipes NPS 6 and larger.
K. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestop materials and installations in Section 07 84 13 "Penetration Firestopping."
3.10 SLEEVE SEAL INSTALLATION
A. Install sleeve seals in sleeves in exterior concrete walls at water-service piping entries into building.
B. Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble sleeve seal components and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
3.11 IDENTIFICATION
A. Install labeling and pipe markers on equipment and piping according to requirements in
NFPA 13.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 15
3.12 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Hydrostatic / Leak Test: After installation, charge systems and test for leaks. Perform hydrostatic test in accordance with NFPA 13. Repair leaks and retest until no leaks exist.
2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
3. Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance"
Chapter.
4. Energize circuits to electrical equipment and devices.
5. Coordinate with fire-alarm tests. Operate as required.
6. Verify that equipment hose threads are same as local fire-department equipment.
C. Sprinkler piping system will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports and submit promptly.
3.13 CLEANING
A. Clean dirt and debris from sprinklers.
B. Remove and replace sprinklers with paint other than factory finish.
3.14 DEMONSTRATION
A. Train Government maintenance personnel to adjust, operate, and maintain system.
B. Provide 2 hours of on-site training for Operations and Maintenance Personnel. The session outline shall cover the following items:
1. Review of Operations and Maintenance Manuals.
2. Review of As-built Drawings.
3. Overview of system components.
4. System operation under normal conditions.
5. System operation under abnormal conditions.
6. Emergency procedures.
7. Troubleshooting procedures.
8. Maintenance and Repair procedures.
9. Questions.
C. Provide 1 indicated training session as outlined above.
D. Provide handouts in bound format and in sufficient quantity to provide each attendee with a copy.
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 16
3.15 PIPING SCHEDULE
A. Piping between Fire-Department Connections and Check Valves: Galvanized, standard-weight steel pipe and joints.
B. Sprinkler specialty fittings may be used, downstream of control valves, instead of specified fittings.
C. Standard-pressure, wet-pipe sprinkler system, NPS 2-1/2 and smaller, shall be one of the following:
1. Standard-weight, black-steel pipe with threaded ends; uncoated, gray-iron threaded fittings; and threaded joints.
2. Standard-weight, galvanized-steel pipe with threaded ends; galvanized, gray-iron threaded fittings; and threaded joints.
3. Standard-weight, black-steel pipe with plain ends; steel welding fittings; and welded joints.
D. Standard-pressure, wet-pipe sprinkler system, NPS 3 and larger, shall be the following:
1. Schedule 10, black-steel pipe with roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
2. Schedule 40, black-steel pipe with roll or cut-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.
3. Schedule 40, black-steel pipe with threaded ends; uncoated, gray-iron threaded fittings;
and threaded joints.
3.16 SPRINKLER SCHEDULE
A. Use sprinkler types in subparagraphs below for the following applications:
1. Rooms without Ceilings: Upright sprinklers.
2. Rooms with Suspended Ceilings: Concealed sprinklers.
3. Wall Mounting: Sidewall sprinklers.
B. Provide sprinkler types in subparagraphs below with finishes indicated.
1. Concealed Sprinklers: Rough brass, with factory-painted white cover plate.
2. Upright, Pendent and Sidewall Sprinklers: Chrome plated in finished spaces exposed to view; rough bronze in unfinished spaces not exposed to view.
END OF SECTION 21 13 13
COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 22 05 13 - 1
SECTION 22 05 13 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general requirements for single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on ac power systems up to
600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.
1.2 COORDINATION
A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:
1. Motor controllers.
2. Torque, speed, and horsepower requirements of the load.
3. Ratings and characteristics of supply circuit and required control sequence.
4. Ambient and environmental conditions of installation location.
PART 2 - PRODUCTS
2.1 GENERAL MOTOR REQUIREMENTS
A. Comply with NEMA MG 1 unless otherwise indicated.
B. Comply with IEEE 841 for severe-duty motors.
2.2 MOTOR CHARACTERISTICS
A. Duty: Continuous duty at ambient temperature of 40 deg C and at altitude of 3300 feet above sea level.
B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.
2.3 POLYPHASE MOTORS
A. Description: NEMA MG 1, Design B, medium induction motor.
B. Efficiency: Energy efficient, as defined in NEMA MG 1.
COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 22 05 13 - 2
C. Service Factor: 1.15.
D. Multispeed Motors: Variable torque.
1. For motors with 2:1 speed ratio, consequent pole, single winding.
2. For motors with other than 2:1 speed ratio, separate winding for each speed.
E. Multispeed Motors: Separate winding for each speed.
F. Rotor: Random-wound, squirrel cage.
G. Bearings: Regreasable, shielded, antifriction ball bearings suitable for radial and thrust loading.
H. Temperature Rise: Match insulation rating.
I. Insulation: Class F.
J. Code Letter Designation:
1. Motors 15 HP and Larger: NEMA starting Code F or Code G.
2. Motors Smaller than 15 HP: Manufacturer's standard starting characteristic.
K. Enclosure Material: Cast iron for motor frame sizes 324T and larger; rolled steel for motor frame sizes smaller than 324T.
2.4 POLYPHASE MOTORS WITH ADDITIONAL REQUIREMENTS
A. Motors Used with Reduced-Voltage and Multispeed Controllers: Match wiring connection requirements for controller with required motor leads. Provide terminals in motor terminal box, suited to control method.
B. Motors Used with Variable Frequency Controllers: Ratings, characteristics, and features coordinated with and approved by controller manufacturer.
1. Windings: Copper magnet wire with moisture-resistant insulation varnish, designed and tested to resist transient spikes, high frequencies, and short time rise pulses produced by pulse-width modulated inverters.
2. Energy- and Premium-Efficient Motors: Class B temperature rise; Class F insulation.
3. Inverter-Duty Motors: Class F temperature rise; Class H insulation.
4. Thermal Protection: Comply with NEMA MG 1 requirements for thermally protected motors.
C. Severe-Duty Motors: Comply with IEEE 841, with 1.15 minimum service factor.
COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 22 05 13 - 3
2.5 SINGLE-PHASE MOTORS
A. Motors larger than 1/20 hp shall be one of the following, to suit starting torque and requirements of specific motor application:
1. Permanent-split capacitor.
2. Split phase.
3. Capacitor start, inductor run.
4. Capacitor start, capacitor run.
B. Multispeed Motors: Variable-torque, permanent-split-capacitor type.
C. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.
D. Motors 1/20 HP and Smaller: Shaded-pole type.
E. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 22 05 13
METERS AND GAGES FOR PLUMBING PIPING 22 05 19 - 1
SECTION 22 05 19 - METERS AND GAGES FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Liquid-in-glass thermometers.
2. Dial-type pressure gages.
3. Gage attachments.
4. Test plugs.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.3 INFORMATIONAL SUBMITTALS
A. Product Certificates: For each type of meter and gage, from manufacturer.
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For meters and gages to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 LIQUID-IN-GLASS THERMOMETERS
A. Metal-Case, Industrial-Style, Liquid-in-Glass Thermometers:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Palmer Wahl Instrumentation Group.
b. Tel-Tru Manufacturing Company.
c. Trerice, H. O. Co.
d. Weiss Instruments, Inc.
2. Standard: ASME B40.200.
http://www.specagent.com/LookUp/?uid=123456808046&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808047&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808048&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808049&mf=04&src=wd
METERS AND GAGES FOR PLUMBING PIPING 22 05 19 - 2
3. Case: Cast aluminum; 7-inch nominal size unless otherwise indicated.
4. Case Form: Adjustable angle unless otherwise indicated.
5. Tube: Glass with…