Amendment 001 4 Nov 10.doc

DOC document 38 KB Posted

Attached to
MAINE National Guard Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
W912JD11R0001
Issued by
Department of the Army Maine Army National Guard

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to MAINE National Guard Multiple Award Task Order Contract, newest first.
File Type Posted
List of Awarded Multiple Award Task Order Contracts.docx DOCX document
MATOC Mail Addresses.doc DOC document
Amendment 006.doc DOC document
RFI_LOG__Updated 3Dec10_MATOC_-_W912JD-10-R-0001 .xls XLS spreadsheet
RFI_LOG__Updated 24Nov10_MATOC_-_W912JD-10-R-0001 .xls XLS spreadsheet
P-9 Existing OH Door.pdf PDF
Amendment 0005.doc DOC document
102800 - Toilet Accessories.pdf PDF
RFI_LOG_ Updated_19Nov10_MATOC_W912JD-10-R-0001 111910.xls XLS spreadsheet
EXHIBIT C Updated 19 Nov 10.doc DOC document
Amendment 0004.doc DOC document
Amendment 003.doc DOC document
MATOC PREPROPSAL SLIDE 1110.ppt PPT presentation
Maine - MATOC - Pre-Pro Conf - Notes.doc DOC document
Pre-Proposal Sign In Sheet.pdf PDF
List of Task Orders Awarded under Current MATOC.pdf PDF
EXHIBIT C Updated 12 Nov 10.doc DOC document
Exhibit G RFI Request Form.pdf PDF
Amendment 002_ 12 Nov 10.doc DOC document
RFI LOG - MATOC - W912JD-10-R-0001.xls XLS spreadsheet
EXHIBIT A updated 4 Nov 10.doc DOC document
Exhibit E-1 Prototiypical updated 4 Nov 10.doc DOC document
7_Specification Book Final Submission 040909.pdf PDF
2_Civil_Drawings.pdf PDF
Exhibit F.pdf PDF
Exhibit E Prototiypical.pdf PDF
EXHIBIT D.pdf PDF
EXHIBIT A.pdf PDF
4_Architectural_Drawings.pdf PDF
6_Electrical_Drawings.pdf PDF
Mr. David W McPhail -Source Selection Participation Agreement.pdf PDF
1_General_Drawings.pdf PDF
5_Mechanical_Drawings.pdf PDF
Exhibit E-1 Prototiypical.pdf PDF
EXHIBIT C.pdf PDF
EXHIBIT G.doc DOC document
MATOC TASK ORDER Solicitation W912JD-11-R-0001.pdf PDF
3_Structural_Drawings.pdf PDF
EXHIBIT B.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

AMENDMENT 1

Amendment 001

RFI 001

Question: “advise as to what the specific requirements are to sufficiently demonstrate to the Government that a potential/interested MATOC contractor has the capability to respond to Project On-site Conferences under emergency conditions or 120 minutes? I have read sections SC4.2.1 and 4.2.1.4.1 and 4.2.1.5.1, etc. and cannot identify specific criteria listed in the aforementioned solicitation.”

Answer: Please ensure that a member of the team or a local company will be available to respond to the site within 120 minutes, to begin resolving emergency situations.

RFI 002

Question: “Exhibit E-1 at B.7 – suggest the % sign be removed after 100 since the calculation multiplied by 1 will not be changed.”

Answer: Agree that the % sign should be removed after 100 in the formula in Exhibit E-1 line B7. B.7 should read "Percent Self-performed Work = Line B.6/Line B.5 X 100 = ____________%" Exhibit E-1 has been updated.

RFI 003

Question: “00110-2.2.1 states six(6) general construction submittals for Exhibit A but Exhibit A states submission of five (5). Please clarify.”

Answer: Section 00110 Part 2.2.1 is the current change in effect and therefore Exhibit A Part 1 should be corrected to read "Prepare six (6) Part 1 forms for general construction, and two (2) for design build, if requesting consideration for this option." Exhibit A has been updated.

RFI 004

Question: “Could you please verify that the work to be done to the data rack in Room 105 is just a removal and reinstall and that there are no new or additional components that will need to be installed?”

Answer: Affirmative, remove and reinstall existing components; coordinate with the contracting officer before removing; components damaged by Contractor will be replaced at no additional cost to the Government.

RFI 006

Question: “There is fiber optic cable being used on this project between the data jacks and the data rack. The specification is not clear as to the exact type of fiber required. Could this clarify?”

Answer: Do not install fiber optic cable at this time; this will be installed as part of a future contract.

(End of Summary of Changes)