Amendment 0005.doc

DOC document 38 KB Posted

Attached to
MAINE National Guard Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
W912JD11R0001
Issued by
Department of the Army Maine Army National Guard

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to MAINE National Guard Multiple Award Task Order Contract, newest first.
File Type Posted
List of Awarded Multiple Award Task Order Contracts.docx DOCX document
MATOC Mail Addresses.doc DOC document
Amendment 006.doc DOC document
RFI_LOG__Updated 3Dec10_MATOC_-_W912JD-10-R-0001 .xls XLS spreadsheet
RFI_LOG__Updated 24Nov10_MATOC_-_W912JD-10-R-0001 .xls XLS spreadsheet
P-9 Existing OH Door.pdf PDF
RFI_LOG_ Updated_19Nov10_MATOC_W912JD-10-R-0001 111910.xls XLS spreadsheet
EXHIBIT C Updated 19 Nov 10.doc DOC document
Amendment 0004.doc DOC document
102800 - Toilet Accessories.pdf PDF
Amendment 003.doc DOC document
Maine - MATOC - Pre-Pro Conf - Notes.doc DOC document
Pre-Proposal Sign In Sheet.pdf PDF
List of Task Orders Awarded under Current MATOC.pdf PDF
EXHIBIT C Updated 12 Nov 10.doc DOC document
Exhibit G RFI Request Form.pdf PDF
Amendment 002_ 12 Nov 10.doc DOC document
MATOC PREPROPSAL SLIDE 1110.ppt PPT presentation
Amendment 001 4 Nov 10.doc DOC document
RFI LOG - MATOC - W912JD-10-R-0001.xls XLS spreadsheet
EXHIBIT A updated 4 Nov 10.doc DOC document
Exhibit E-1 Prototiypical updated 4 Nov 10.doc DOC document
EXHIBIT D.pdf PDF
EXHIBIT A.pdf PDF
4_Architectural_Drawings.pdf PDF
6_Electrical_Drawings.pdf PDF
Mr. David W McPhail -Source Selection Participation Agreement.pdf PDF
1_General_Drawings.pdf PDF
5_Mechanical_Drawings.pdf PDF
Exhibit E-1 Prototiypical.pdf PDF
EXHIBIT C.pdf PDF
EXHIBIT G.doc DOC document
MATOC TASK ORDER Solicitation W912JD-11-R-0001.pdf PDF
3_Structural_Drawings.pdf PDF
EXHIBIT B.pdf PDF
7_Specification Book Final Submission 040909.pdf PDF
2_Civil_Drawings.pdf PDF
Exhibit F.pdf PDF
Exhibit E Prototiypical.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

AMENDMENT 5

Amendment 005

RFI 020

Question: Since we are suppose to match wall and roof panels, please provide information on the existing.

Answer: Existing roof panels are Kynar CXP type, 24 gage with floating clips and thermal blocks; wall panels are Kynar MAP type, 24 gage.

RFI 021

Question: Since we are suppose to match existing profile of the sectional door, please provide information on the existing.

Answer: See attached material submittal from original construction, "P-9 Existing OH Door".

RFI 045b

Question: Does the Architect of Record have to be licensed in the State of Maine?

Answer: No requirement, however it will be seen as beneficial

RFI 048

Question: Proposal Inquiry: Drawing CU 101 references propane service notes. Is the contractor responsible for the cost for notes 1 and 3and the owner responsible for the cost for note 2?

Answer: Yes

RFI 050a

Question: What is the project duration for the SEED Project - Building 9 Alterations?

Answer: See Exhibit E "Prototypical Project Notice of Proposed Project, Proposal Form" PERFORMANCE PERIOD: 180 Days, after receipt of Notice to Proceed.

RFI 050b

Question: Is there a government estimate for the project dollar value of the SEED Project - Building 9 Alterations?

Answer: See Exhibit E "Prototypical Project Notice of Proposed Project, Proposal Form" MAGNITUDE OF PROJECT: Between $500,000 and $1,000,000.

RFI 051a

Question: Overhead Coiling Doors-specs mention fusible links at 1.4 C2, but that is typical of fire doors. The spec doesn’t mention that these are fire doors. Please confirm

Answer: Coiling doors are not rated. No fusible link required.

RFI 051b

Question: Should the overhead Coiling Doors be insulated? The sectional doors are and are in the same building. Please confirm.

Answer: Insulation not required.

RFI 051c

Question: Both Manual Operation and Electrical are mentioned. It appears they are to manual, please confirm.

Answer: New coiling doors are manual operation; new sectional door is electric.

(End of Summary of Changes)