Attached to
Replace KC-135 Maintenance Hangar Federal contract opportunity
Solicitation number
W912JD-10-R-0001
Issued by
Department of the Army Maine Army National Guard

About this file

RFI Responses - Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace KC-135 Maintenance Hangar, newest first.
File Type Posted
RFI Responses - Amendment 4.pdf PDF
W912JD-10-R-0001-0004.pdf PDF
Domestic Hydrant Flow Test 2005 INFORMATIONAL.pdf PDF
43580A106 Revision 1.PDF PDF
43580A111 Revision 1.PDF PDF
W912JD-10-R-0001-0003_Bid Schedule.pdf PDF
43580C101 Revision 2.pdf PDF
43580A107 Revision 2.PDF PDF
43580E502 Revision 1.pdf PDF
43580A109 Revision 2.PDF PDF
BNGR102800 Revision 1.pdf PDF
43580A105 Revision 1.PDF PDF
43580A201 Revision 1.PDF PDF
43580A110 Revision 1.PDF PDF
W912JD-10-R-0001-0003.pdf PDF
BNGR083416 Revision 1.pdf PDF
43580C102 Revision 2.pdf PDF
43580A602 Revision 1.PDF PDF
43580A108 Revision 1.PDF PDF
BNGR083323 Revision 1.pdf PDF
BNGR142400 Revision 1.pdf PDF
43580S305 Revision 1.pdf PDF
43580C302 Revision 1.pdf PDF
43580R601 Revision 1.pdf PDF
Site Visit Questions with Answers.pdf PDF
43580R702 Revision 1.pdf PDF
43580R500 Revision 1.pdf PDF
RFI Reference Guide.pdf PDF
43580A603 Revision 1.pdf PDF
43580R501 Revision 1.pdf PDF
Hangar Site Visit Sign-in Sheets 6 Jan 10.pdf PDF
43580R602 Revision 1.pdf PDF
43580C003 Revision 1.pdf PDF
43580S003 Revision 1.pdf PDF
43580C102 Revision 1.pdf PDF
Important Information to Offerors.pdf PDF
Burns and McDonnell's Pre-Proposal Slides for Hangar.pdf PDF
Contracting's Pre-Proposal Slides for Hangar.pdf PDF
Hangar Site Visit Sign-in Sheets 15 Dec 09.pdf PDF
Specifications_Volume 2.pdf PDF
WD - Heavy - ME20080007 - 06_12_2009.pdf PDF
Sourcce Selection Participation Agreement - Kraus.pdf PDF
Source Selection Participation Agreement - Busch.pdf PDF
WD - Building - ME20080001 - 10_23_2009.pdf PDF
Exhibit D Hangar.pdf PDF
Section 4 - Structural.pdf PDF
Section 2 - Architectural.pdf PDF
Section 3 - Civil.pdf PDF
Exhibit A Hangar.pdf PDF
Exhibit C Hangar.doc DOC document
Show all 50

Replace KC-135 Maintenance Hangar has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSOLIDATED RFI RESPONSES

SOLICITATION W912JD-10-R-0001

Replace KC-135 Maintenance Hangar

RFI 0003:

Questions: We are not able to find any specification for the interior fall protection over the KC-135. Please provide information for the interior fall protection that stipulates the design requirements (e.g. designed by a professional engineer, number of users for each system, number and type of harnesses, self retracting lifelines, fall arrest trolleys to be supplied, etc.)

Answer: Specification for fall protection will be issued by amendment.

RFI 0004:

Questions:

1. Drawings call for an epoxy floor in the hangar area, however, no specification for epoxy flooring can be found in the documents. Please advise.

2. Site drawings show removal of underground utilities (i.e. 1-1/2" water line, sanitary sewers, storm sewers, and electrical conduit lines). Are these to be abandoned in place or do they all have to be removed?

3. The size of the foundation and thickness of the slab for the existing hangar to be demolished are not shown on the drawings. Please advise.

Answers:

1. Per request of the 101st Maintenance Squadron, the hangar floor originally scheduled to receive reflective dry-shake surface hardener will now receive a three-coat system epoxy system. The first coat will consist of an epoxy primer coat and moisture vapor block, if required. The second coat will be an epoxy body coat with broadcast application of non-skid white aluminum oxide abrasive. The third coat will be a urethane topcoat. Color shall be ultra light gray. The specification for this system will be issued by amendment.

2. All utilities shown shall be capped and removed from the site. Remove as indicated on the demolition drawings.

3. See additional reference drawings issued under Amendment 0002.

RFI 0007:

1. Specification section 32 13 00-Portland Cement Concrete Pavement for Airfields notes that either a slip-form process or a side-form process may be used for the installation of this concrete material.

Specification section 32 13 00 - 3.10.C goes on to state that if the side form process is used, the finishing screed machine must move forward with a combined longitudinal and transverse shearing motion. Speaking with several screed machine manufacturers, we cannot find a form riding machine that does this. Is it the intent of the specification to preclude the use of the side-form process for concrete pavement? Will a standard triple roller screed be allowed for this work?

2. Plan sheets A-111, S-004 and S-400 show a set of fall protection tie-off beams above the aircraft parking location inside the hangar. The structural drawings indicate that the design of the rails and support system are to be by the Fall Protection Supplier. The only project specification for fall protection is 11 10 16 - ROOFTOP FALL RESTRAINT SYSTEM. This section does not address the fall protection items inside the building. Please provide guidance as to the intent and design of this interior system so that we can find appropriate suppliers for it.

1. A standard slip-form or side-form process is acceptable.

2. Specification for fall protection will be issued by amendment.

RFI 0010:

1. Section 313116 calls for Termite Control, will this be required for the project?

2. Section 312000, Page 3, gives provisions for a Capillary Water Barrier under the slab, is this Barrier recommended or required?

3. Section 321215, Page 3, requires a MTV for asphalt paving. Since the paving is in tight areas and not on taxiways or runways will this be required?

4. Section 321215, Page 16, requests that a test strip be performed for hot mix asphalt paving. Where the area of paving consists of tight areas, will a test strip be required?

5. What permits will the contractor be required to obtain for the project?

6. What is the extent of the demolition for building 499 that will be performed by the contractor?

7. Is there information on the foundation of building 499 that could be provided showing the depth and size of the foundation walls and footers that are to be demolished?

8. Drawing C-302 detail 8 & 9 both refer to detail 15/C-302 which is left blank on the drawings. Could you provide detail 15/C-302?

1. Termite Control is required.

2. Capillary Water Barrier is REQUIRED per S-001, section 4.

3. Will be removed.

4. Test strip is not required.

5. Civil permits would include such items as FAA, EPA Construction General Permit, and SWPPP.

The contractor is responsible to adhere and obtain all required permits. This list may not be all inclusive. The Contractor is required validate all permits that will be required.

6. As indicated on the bid documents. See additional reference drawings issued under Amendment 0002.

7. Additional “For Information Only” drawings will be issued by amendment.

8. These should reference detail 13/C-302.

RFI 0011:

Question: Electrical Specification Section 260533 Paragraph B, Conduit Installation: #2 States: Use zinc coated EMT where routed higher than 10’ above the hanger floor in the hanger aircraft bay, for interior 480V branch circuits, interior concealed 120V power, lighting, alarms, control, and communications in offices, corridors, toilets, break rooms, ceiling plenum areas, and in aircraft hanger bay above 10’-0” height. Please confirm that concealed within masonry walls and 18” above the hanger floor are both not within the classified environment and not in the hanger. Therefore EMT can be used to feed equipment in the hanger that is located higher than 18” above the hanger floor and the EMT is concealed within the masonry wall.

Answer: EMT can be installed concealed within the masonry wall. The contractor shall comply with the requirements of NEC Articles 501 and 513 and specifications when installing conduits.

RFI 0014:

Section 074113 – Metal Roof Panels

• In paragraph 2.01 A. 1. – Is pre-painted aluminum-zinc alloy coated steel sheet acceptable for metal roof panels?

This same material is specified as acceptable for both roof trims (paragraph 2.06 B.) and roof-top curbs (paragraph 2.06 D.) in this same section.

• In paragraph 2.05 B. 1-4 – Please clarify the profile and material for the roof liner panels. The profile for the specified roof liner panels (with 1” high corrugations spaced 1’ o.c.) is not appropriate for support of rigid insulation in a roof assembly. The specified material does not match the continuously corrugated liner panel manufactured from .015”, 80-ksi steel which is used in the Butler CMR-24 roof system (which was identified as the basis of design during the pre-proposal conference).

• In paragraph 2.05 C. 2. – Individual roof system manufacturers have engineered roof clips that are part of their U.L. tested assemblies. Providing any roof clips other than those used in their assemblies during roof testing by U.L. may void the U.L. wind uplift ratings.

Please confirm that manufacturers shall supply their standard engineered roof clip product used during U.L. testing.

• In paragraph 3.03 A. – Please identify where the specified underlayment is to be used

. The project drawings show no underlayment, and the Butler CMR-24 roof system (identified in the pre-proposal conference as the basis for the design) does not utilize an underlayment.

• In paragraph 3.03 C. – Please identify where the specified slip sheet is to be used

. The project drawings show no slip sheet, and the Butler CMR-24 roof system (identified in the pre-proposal conference as the basis for the design) does not utilize a slip sheet.

Section 074213 – Metal Wall Panels

• In paragraph 2.01 A. 1. – Is pre-painted aluminum-zinc alloy coated steel sheet acceptable for metal wall

This same material is specified as acceptable for wall and soffit flashing and trims (paragraph 2.08 B.) in this same section.

• In paragraph 2.06 A. 1. – Is pre-painted aluminum-zinc alloy coated steel sheet acceptable for metal soffit

This same material is specified as acceptable for wall and soffit flashing and trims (paragraph 2.08 B.) in this same section.

Section 133419 – Metal Building Systems

• In paragraph 2.06 B. 4. – Why is there a requirement for the attachment clips for secondary framing to be welded to the frames?

Are bolted connections acceptable?

• In paragraph 2.06 D. 2. – Some manufacturers provide secondary framing members in paint-ready galvanized steel that should not receive acid pre-treatment prior to priming.

Please confirm that acid pretreatment of secondary members shall only apply to galvanized members that are not provided with “paint ready”galvanized finish.

In paragraph 2.07 C. 1 & 2 – A 10” deep member be not be adequate for the loads and spans for this project.

Furthermore, the depths of secondary structural members are not standardized across the pre-engineered building industry.

Please confirm building manufacturer shall provide secondary structural member of sufficient depth to meet required loading for project, rather than one specific depth.

Answers:

Section 074113, paragraph 2.01.A.1: Yes Section 074113, paragraph 2.05.B1-4: Interior metal liner shall be equal to Butler CMP-24 System.

Section 074113, paragraph 2.05 C.2: Use manufacturers standard engineered roof clip products used during UL testing.

Section 074113, paragraph 3.03 C: Refer to vapor retarder over liner panel in lieu of slip sheet.

Section 074213, paragraph 2.01 A.1: Use zinc-coated (galvanized) steel sheet, 22 gauge, G-90.

Aluminum-zinc (galvalume) is not acceptable.

Section 074213, paragraphs 2.06 A.1: Use zinc-coated (galvanized) steel sheet, 24 gauge, G-90.

Aluminum-zinc (galvalume) is not acceptable.

Section 133419, paragraph 2.06 B.4: Attachment clips to be attached per specification.

Section 133419, paragraph 2.06 D.2: Confirmed.

Section 133419, paragraph 2.07 C.1 & 2: Confirmed.

RFI 0016:

1. Plan Drawing A-107 contains two notes pertaining to monorail crane locations. Specification section 05 12 00 - 2.12 notes to refer to DIVISION 14 for related crane runway requirements. There are no crane runway requirements in DIVISION 14, or anywhere else in the plans/specifications. Please advise if the crane, crane runways or both are to be part of this contract. Provide necessary information if either or both is to be included.

2. Specification section 07 41 13-METAL ROOF PANELS notes that for steel roof deck supporting the metal roof panels one should refer to section 05 31 23 - STEEL ROOF DECK. The Metal Roof Panel specifications as well as the Architectural drawings call for a roof liner panel to be placed on top of the Pre- Engineered Building framing members, under the insulation that is directly under the Metal Roof Panels.

This type of a metal liner panel is typical to PEMB construction and is clearly specified later in section 07 41 13 and it is not a steel roof deck material. Please advise exactly where or if this steel roof deck specified in section 05 31 23 is expected to be used.

Answers:

1. Section 051200 should refer to spec section 41. Specification 412200 attached.

2. Steel roof deck not required if PEMB does not require it. The PMEB is a performance item and will have to have design sealed by a PE and submitted for review.

RFI 0017:

1. Will the General Contractor be responsible to furnish and install the lockers? If so, will there be a locker specification issued?

2. Will the General Contractor be responsible for hiring a security officer?

3. If during the project, the base is required to shut down the main gate to civilians, will the General Contractor be compensated for added costs associated with the shutdown? Will additional time be added to the contract?

4. On Drawing S-001, note E/3/b, the General Contractor is responsible to hire an engineer to redesign the foundation if the current design doesn't meet the requirements of the actual building reactions. If this occurs, will the General Contractor be compensated for this engineering?

5. Drawing S-003 Notes 1, 2 & 3 for vertical masonry reinforcement are either missing or incomplete.

Please clarify these notes.

Answers:

1. Lockers are Government-Furnished/Government-Installed

2. No. This will be further addressed by amendment.

3. This will be addressed under the referenced FAR clauses in the contract.

4. No. Contractor should consider in his bid.

5. Drawing will be reissued by amendment.

RFI 0018:

1. Room finish schedule specifies an item “FH” for light reflective Non-Metallic Shake on hardener.

Section 033000 does not have a specification for this. Can we get a spec for this item?

2. Section 033000 pg 19, paragraph 3.08 – item A specifies a concrete seal coat. Can you tell us where this occurs?

3. Drawing S-002 shows a typical radiant heat piping joint intersection detail that occurs at CJ1 & CJ2 locations. This detail shows the rebar as being above the piping. Detail for the piping on drawing M503 shows the piping attached to the rebar. If detail on drawing S-002 is used, it presents a problem on how to support the rebar above the piping. We have a third detail on drawing M504 that is similar to the detail on S-002. Can we use the detail on drawing M503 or do we need to use the details on drawings S-002 & M- 504?

4. Section 220500, pg 8, paragraph 3.06 specifies concrete bases for plumbing. Section 033000, pg 19, paragraph also has a spec for equipment bases. Do we carry all concrete bases under section 033000?

5. Drawing S-002 shows a typical thickened slab edge detail. Typical wall sections do not show a thickened edge. Do we use a thickened edge at all wall sections including the interior wall section “B” on drawing S- 302?

1. Section 2.07 added to spec 033000.

2. Seal Coat not required on this project.

3. Radiant heat piping detail on S-002 is a generic detail. Rebar shall be located as shown in CJ details on sheet S-002. Radiant heat piping shall be located in accordance with mechanical plans and manufacturer’s recommendations. Do not shift rebar for placement of radiant heat piping.

4. Concrete equipment base pads shall be in accordance with spec 033000 and typical detail on S-002.

5. Thickened slab edge detail to be used at all slab edges.

RFI 0024:

1. Stair Finishes:

a. Specifications call for rubber treads, risers, and stringers. The finish schedule calls for VCT only. The stair details call for 1-piece tread riser with rubber landing tile.

i. Are the stairs to receive rubber tread/risers with VCT on the landings or rubber on the landings?

ii. Are resilient stringers to be used?

iii. Specific manufacturers, products, and colors have been specified for other resilient products but not stair accessories. Will such information be provided, or are we to simply meet the specifications? Are treads to be ADA or standard treads?

2. There is no specification or product listed for Entry Mats (EFM). Will one be provided?

3. There is no specification or product listed for Electrostatic Discharge Tile (ESD). Will one be provided?

Answers:

1. Use VTC on stair landings. Do not use resilient stringers. Meet specifications and standards.

2. Specification will be added by amendment.

3. Specification will be added by amendment.

RFI 0025:

1. Section 033000 page 11, paragraph 2.06, item “B” Is this, the product to be used for the areas shown as “Conc/H”, (sealer, hardener on concrete) on the finish schedule – drawing A-601?

2. Room finish schedule drawing A601: Rooms #105, #109, #111, #112 & #113 have a legend shown as “Conc/FH”. This legend is not shown on the finish legend. Are the rooms to be concrete with Non-Metallic shake on hardener or are they to have a liquid sealer / hardener?

3. We cannot find the thickness of the 2nd level concrete floor slab. Plans do show the second floor F.F.

elevation 116’-0”, however, plans do not give a top of joist elevation. Plans or specifications also do not specify a second floor slab thickness and reinforcing. Please provide the total slab depth as required for the 2nd level slab and the required reinforcing.

4. Site and structural drawings do not have design / detail on the concrete sidewalk. Please provide the following:

A) Confirm the thickness B) Curb / edge detail C) Construction joint details and spacing D) Contraction joint detail and spacing E)Reinforcement detail F) Sealer requirements G) Concrete strength

5. Can we get design data on the exterior concrete pads as follows?

A) Confirm 6” thickness B) Edge detail C) Reinforcing requirements

D) Concrete strength

6. In option #4 could you please confirm what the existing apron thickness is?

Answers:

1. No, section 2.07 added to spec for surface hardener.

2. Provide shake on hardener.

3. Second floor framing to be designed by PEMB. The criteria for loading are provided in the General Notes on the structural drawings. Also see response to RFI 057.

4. This will be addressed by amendment.

5. Exterior pads shall be suitable for equipment furnished. All pads shall be placed over 12” compacted aggregate base. Minimum thickness shall be 8” with #5 bars at 12” O.C. each way. 4000 psi concrete.

6. See Drawing C-0003.

RFI 0026:

Questions: SECTION 083323 - OVERHEAD COILING DOORS

1. Can you confirm these doors are Fire Doors; #'s: lllc, l39d, l5ld, l62d, l63a and (1) 4’ X 4' counter shutter at ISO tool room 105?

2. In the door schedule, what does the B mean under Label B-90?

3. Are any of the doors chain operated or are they all electric?

4. Page 5 of the specs, Under 2.06. What is it that you require powder coat paint baked thermoset finish?

You also mention gray as the color. Gray is a standard baked color. Powder coat is an expensive option.

Page 2 of specs, under summary 1.01-B., you mention field paint in division 099000? NOTE: the fire doors cannot be field painted because they are labeled.

5. Page 6 of specs, under 2.07, paragraph H, you are asking for both photo electric eyes and 4-wire fail safe edges. Are you looking for both or just 4-wire fail safe? Sentence J; do you want ADA-audible alarm and strobe lights on all electric doors?

Answers:

1. All but the 4x4 counter shutter door are 90-minute fire doors.

2. 90-minute fire rated door

3. Electric

4. Powder-coating is not required. Factory paint doors to specified color.

5. No photo electric eye required.

RFI 0027:

Question: Will we be receiving any information regarding the Hush House structure and foundation?

Answer: Hush House foundation drawings provided with Amendment 0002.

RFI 0028:

Question: Aluminum supplier blast design information.

Answer: Building Category: Primary Gathering

RFI 0029:

1. Can you please point me to where it specifies the second floor slab-on-deck details? I cannot find the specifications on this such as thickness, reinforcing, etc.

2. Specification section 111016/2.01/A. requires that the Rooftop Fall Arrestor System be installed by Flexible Lifeline Systems. Is it acceptable for the general contractor to install the system?

3. Will the in-hangar fall protection system be provided by the contractor or by the owner? If by the contractor, please provide a specification for this product.

4. Please provide a specification for the recessed entry mats depicted on A-407 & A-601.

5. Are the monorail cranes noted on A-107 to be provided by the contractor or by the owner? If by the contractor, please provide a specification for this product.

6. Drawing A-507 details 1, 2, 3, 5&6 note "see structural drawings for stair details". Will these structural plans that are referenced be available for the bid?

7. Specification 051200/2.07/F/1/a & b mention carrying allowances for banded grating openings but no dollar amount is specified. Please clarify.

8. Can you please provide specifications for carpeting and electrostatic discharge tile that are called for in the finish schedule?

Answers:

1. Second floor framing and slab by PEMB manufacturer

2. System has to be equal to Flexible Lifeline Systems. It is not the intent of the specifications to dictate means-and methods.

3. By contractor. Specification to be added by amendment.

4. See response to RFI0024 above.

5. Spec section 412200 added.

6. Stair framing by PEMB manufacturer.

7. No allowances in FED contracts.

8. See response to RFI0024 above.

RFI 0030:

Question: Details A and B on S303 show HSS4x4x1/4 drains from the door track to the trench drain but the location and quantity are not found on any of the drawings. Please advise.

Answer: Provide drains at each end of track and 15’ max spacing throughout. Slope at 1% gradient.

RFI 0031:

Question: Racanelli construction is based out of Long island NY. We would like to bid this job, but had some concerns about it. Racanelli’s main concern is if there are any permits or requirements to be able to work in the state of Maine.

Answer: Civil permits would include such items as FAA, EPA Construction General Permit, and SWPPP.

The contractor is responsible to adhere and obtain all required permits. This list may not be all inclusive.

The Contractor is required to validate all permits that will be required. General Contractors are not required to be licensed by the State of Maine.

RFI 0032:

Question: The option prices are not described in detail in the bid documents (narrative). Can a narrative be provided with details regarding what to include/not include in the option price and reference the documents to be included in the pricing?

Basically, it would be nice to have clear delineation where the base bid scope stops and option scope starts.

Answer: Will provide by amendment.

RFI 0036:

Question: Please confirm if a dedicated quality control manager is required separate from a full time project manager and superintendent for the general contract.

Answer: Bid as shown.

RFI 0039:

Question: The back of the bid form, bound into volume one of the spec (BS-2), references allowances.

However, neither the documents nor the solicitation bid form includes allowances. Please indicate what allowances are to be included and how much.

Answer: This will be deleted by amendment.

RFI 0040:

Question: The documents call for testing by the contractor. Is this to be handled through an allowance invoiced on a monthly basis, or is the contractor to guess at a quantity of testing required and include testing costs as a lump sum in their bid?

RFI 0042:

Question: Regarding submittals - Will electronic submittals be accepted, or will ten copies of all submittals need to be mailed to Kansas City as indicated in the specifications? How will submittals of samples be managed? Will masonry samples, and other types, need to be mailed to Kansas City?

Answer: Electronic submittals are acceptable. Number of copies will be reduced to six (6). It is the intent of the project to have an A-E full-time representative on site to assist with some on-site review of submittals and samples but mailing to Kansas City will still be required.

RFI 0043:

Question: Regarding submittals - Will a submittal register/submittal schedule be required? If so, please indicate format required if any.

Answer: The Contractor shall prepare this on AF Form 66 to be provided at the preconstruction meeting.

RFI 0044:

Question: Please explain what is an "Engineers document management project website" as referenced in specification section 013300, 1.02, E, 2.

Answer: This will be a secured FTP site for transmitting of documents as needed.

RFI 0045:

Question: Specification section 013216, 1.04, B calls for the use of Suretrak scheduling software. Is Microsoft Project acceptable scheduling software?

Answer: Any acceptable and proven scheduling software is acceptable but must provide for the specified requirements.

RFI 0046:

Question:

Specification section 011100, 1.05 for Preordered Equipment and Materials indicates that the contractor is to assume Owner purchase orders including costs of equipment, materials, receiving, handling, storage and installation ............ included in contract price.

What is the cost of these purchase orders and what is the equipment and material to be "handled".

What is the equipment and material to be installed? Does the equipment require supporting construction, like blocking?

Should this be managed as a Government mandated allowance for all bidders? This would allow Government flexibility on final product, cost, and installation.

Also, in section 011100, 1.05, B a statement is made of "renegotiate purchase" and "execute final purchase order" related to Government pre-ordered equipment and materials. What is meant by this? This seems to require, or at least encourage, bid shopping.

Answer: This paragraph will be deleted by amendment.

RFI 0047:

Specification section 015100, 3.06, 2, c requires a phone line in watchman's office. Please explain where the watchman's office is. Who hires and pays for the watchman salary?

Specification section 015100, 3.06, 2, f requires a dedicated phone and fax line in the Superintendent and Contracting Officer's trailer. Will a Contracting Officer trailer be required, as there are facilities for a Contracting Officer on campus? Also, how will phone, fax, internet, be made available for contractor? As the project is on a Government campus beyond the control of local utility companies, the Government will need to "allow" connection. How will this work and cost be managed? Should this be an allowance?

Answer: Watchman requirements will be deleted by amendment.

RFI 0048:

Specification section 015200, 2.01 calls for a Government field office. Will this be required on this campus as other facilities seem to be available for Government use?

Specification section 015200, 2.01, C, 18 requires three computer work stations. Is this to be provided just for the Government or does these three computers include the computer to be used by the contractors Superintendent?

Answer: Provide Government Field Office as specified with specified computer support.

RFI 0049:

Specification section 015700 calls for an enclosure fence around the project; however this is not indicated on the drawings. Please indicate where a fence is to be placed.

A fence currently exists. Is it acceptable for the existing fence to be maintained as the permanent fence?

Answer: The Contractor shall be responsible for coordinating and fencing the work site to secure his equipment and property as well as control FOD onto the flightline. See drawings for use of existing fences and/or permanent fences. The existing fencing may be used upon approval by the government. The fence shall be placed to secure the site and must be approved by the government.

RFI 0050:

Who hires and pays for the commissioning agent, Owner, Designer, or Contractor?

If the commissioning agent cost is to be carried in the contractors bid price, who is the commissioning agent that was used in the design phase? Please confirm that all bidders are to use the commissioning agent that was used in the bid phase?

Answer: The Contractor can hire a Commissioning agent of his choice for the prerequisite commissioning.

Enhanced commissioning will be performed by the Government if desired.

RFI 0051:

Question: Drawing A-802 thru A-805 indicates various pieces of equipment and furniture. Are all of the units shown owner furnished and owner installed? If not, please indicate which pieces are to be supplied by the Contractor and/or installed by the Contractor.

Answer: Equipment shown on A-802 through A-805 is Government-Furnished/Government-Installed.

RFI 0052:

Question: Are there as-built drawings available for Hush House (building 500)? For the old hangar that no longer exists (building 499)? In particular, are foundation and underground utility drawings available?

Answer: Drawings for the existing hangar have been provided. Only the Hush House foundations are to be demolished and removed by the Contractor. Drawings will be provided by amendment.

RFI 0053:

Will the contractor be responsible for relocating any existing equipment from building 496?

The documents do not state this, but it was mentioned in the pre-bid walk through.

Answer: No. Bid as shown.

RFI 0055:

Question: Spec section 313116 calls for soil treatment for termite control. Is this required in Maine, at this site? It is unorthodox to require this in this area.

Answer: Required by the Government.

RFI 0056:

Question: Drawing S-300 note 1 comments on assumptions related to reactions from the pre-engineered metal building. If assumptions are under designed, redesign of the foundation will be required.

Please confirm that the review of the reactions, comparison to assumptions and redesign of foundation (if required) will be by the Engineer of Record and not by the Contractor or other third party engineer.

Also, if modifications are required to rebar size/quantity or concrete foundation size/quantity, please confirm that this will be addressed as a changed condition with the selected bidder. Contractors will be unable to make predictions of cost based on the designer's assumptions.

Answer: Foundation reaction review by Engineer of Record. If the reactions result in redesign of the foundations, the Contractor will be responsible for the redesign. See drawing S-001, Note 5.E.3.B. This should be evaluated as soon as possible by the Contractor and his PMEB supplier to assure that redesign is done so as to not disrupt work sequence and to maintain the contract performance period.

RFI 0057:

1. Please provide specification for light reflective non-metallic shake-on floor hardener called for in the finish schedule (A-601).

2. Please provide specification for the trench drains noted on S-106 / Note 9. Are these to be cast in place or a manufactured product? Detail G/S-302 appears to show a cast in place trench drain, but I can't seem to find any information regarding dimensions, slab embedments, grating thickness, etc... The trench drains are also referenced on drawing M-117 as TD-A and TD-B.

3. Please provide the loading requirements for the second floor system (Areas B&C).

Answers:

1. Spec section 033000 2.07 added.

2. The trench drains are pre-manufactured drains as indicated on P-701 (Trench Drain Schedule).

3. Second floor design load shall be in accordance with 2006 IBC and ASCE 7-05 (50 psf throughout, 100 psf in exit corridors and stairways)

RFI 0058:

1. Please provide complete list of Owner provided equipment as identified in specification 011100, Item #1.05.

2. Specification section 015700-2; Item 3.03 "Security" calls for a "Watchman Services to be provided by the Contractor on-duty during all house when Contractor's supervisory personnel are not on the Site". Can this requirement be waived as the work area is located within a secure zone (within airport limits)?

3. Please confirm that Asbestos Items in Tables 1 in Specification Section 132800, Asbestos Abatement, please confirm that any work associated with building 496 shall be part of Option #3.

4. Please confirm that there is no asbestos abatement to be conducted in building 493 as part of the base bid.

5. Please confirm that there is not asbestos abatement to be conducted in Option #5 as part of the Hush House demolition.

6. Please confirm that asbestos removal in building 497 is required as indicated in Table 1 of spec section 132800 under this contract as there does not appear to be any other work associated with building 497.

Should this work be included as part of Item #1 or Item #2 of the bid form?

7. What are the procedures to gain security clearance at the Camp Keyes USPFO base in Augusta where the bids need to be dropped off as indicated in section 5.01 of the Solicitation?

8. Specification Section 102219 (Demountable Gypsum Panel Partitions), sub section 2.02, A1-3; please indicate required thickness, width and finish for gypsum panel partitions.

9. Please provide a stripping layout for the airplane hangar, if required.

10. Please provide specification on expansion joint filler at control joints in slab on grade as one does not appear to be indicated.

11. Please indicate if the design was intended to include any sort of cat-walk accessibility to the tail pipe exhaust hose reel system indicated on drawing M-101. If so, please provide SK's indicating design.

12. Please provide a list of all live and dead loads which need to be incorporated into the design of the pre-engineered metal building.

Answers:

1. This paragraph will be deleted by amendment.

2. This paragraph will be deleted by amendment.

3. Bid as shown.

4. Bid as shown.

5. Bid as shown.

6. Bid as shown.

7. ANG will respond.

8. See response to RFI 0064.

9. Not required. Bid as shown.

10. See spec 033000 2.04 B.

11. Bid as shown.

12. Design load requirements can be found on S-001 and S-004.

RFI 0059:

1. Please provide window type for windows in room 209 & 218. Do the windows in room 209 & 218 receive fire shutters?

2. Please confirm that window type 12, that look into the hangar from the second floor do not receive blinds.

3. Blinds are called for on type 3 windows per details on drawing A-607 & 608. Room number 111 (fiberglass room) is to have type 3 windows. Are blinds required in room 111?

4. Admin room 1 &2 #127 & 129 are to receive window type 1 which does not receive blinds. Are blinds desired in these rooms?

5. The spec calls for manual and motorized/electric shades/blinds. Which windows are to receive the motorized shades/blinds?

1. Window in 209 and 218 shall be Type W-12. Both are to receive fire shutters.

2. Provide window blinds for window Type W-12.

3. Yes.

4. Yes.

5. All blinds are manual.

RFI 0060:

Question: Are fire shutters to be equipped with fusible links only? Or, are they to be electrically wired to the alarm system? Or both? If to be wired to alarm system, please supply detail.

Answer: Fire shutter to be equipped with fusible link and wired to the alarm system.

RFI 0061:

Question: Sometimes when metal roof panels are placed over board insulation a noise is made inside the building from the wind vibrating the metal roof panel onto the rigid insulation (like a drum beat).

To remedy this situation an added layer of batt insulation is placed over the rigid insulation beneath the metal roof panel. If a layer of cushion, batt insulation, is desired please indicate and supply a detail.