A E Bid Schedule 0003.pdf
PDF 921 KB Posted
- Attached to
- Replace KC-135 Maintenance Hangar Federal contract opportunity
- Solicitation number
- W912JD-10-R-0001
About this file
A E Bid Schedule for Amendment 0003
View the file
Other files for this federal contract opportunity
Show all 50
Replace KC-135 Maintenance Hangar has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace KC-135 Maintenance Hangar
BS - 1
Bangor, Maine
BIDDER’S NAME:__________________________________________
BIDDING SCHEDULE
Item No.
Description
Estimated Quantity
Unit
Unit Price Estimated Amount
1.
2.
3.
4.
5.
6.
7.
8.
BASE BID
Construct KC-135 Maintenance Hangar, less
OPTIONS 1 THROUGH 5
Building 493 Upgrades
OPTION NO. 1
Automatic Gate
OPTION NO. 2
Parking Lot
OPTION NO. 3
Demolish Existing Hangar
OPTION NO. 4
Rigid Concrete Pavement in lieu of Asphalt Pavement
OPTION NO. 5
Demolish Existing Hush House Foundation and Pavement
OPTION NO. 6
Demolish Building 497
L.S.
TOTAL BASE BID
TOTAL BASE BID
PLUS OPTIONS 1
THROUGH 6
david.mcphail Cross-Out david.mcphail Typewritten Text david.mcphail Typewritten Text david.mcphail Typewritten Text david.mcphail Typewritten Text david.mcphail Typewritten Text
Replace KC-135 Maintenance Hangar
BS - 2
Bangor, Maine
NOTES FOR BIDDING SCHEDULE
1. Payment under Bid Item No. 1 will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to “Construct KC-135 Maintenance Hangar”, complete, except for those items separately scheduled for payment under the identified Bid Options. Payment under this Bid Item will also include all sitework, pavements and utilities required to support the KC-135 Maintenance Hangar. as well as the demolition of the existing hangar.
REISSUED BY AMENDMENT NUMBER 0003
2. Payment under Bid Item No. 2 will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to complete the “Building 493 Upgrades” as shown and identified in the contract documents.
3. Payment under Bid Item No. 3 (OPTION 1) will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to provide, install, test and turn over the “Automatic Gate” as shown on drawings C005 and C102.
4. Payment under Bid Item No. 4 (OPTION 2) will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to provide, install, test and turn over the “Parking Lot” as shown on drawings C005 and C103.
5. Payment under Bid Item No. 5 (OPTION 3) will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to “Demolish Existing Hangar”, complete. The work shall include the abatement of specified hazardous materials as well as related utilities identified on drawing C005 and the FOR REFERENCE ONLY drawings R001 through R301.
6. Payment under Bid Item No. 6 (OPTION 4) will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to provide the “Rigid Concrete Pavement in lieu of Asphalt Pavement” as shown on drawings C005 and C107.
7. Payment under Bid Item No. 7 (OPTION 5) will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to “Demolish Existing Hush House Foundation and Pavement” as shown on drawings C003, C005 and the FOR REFERENCE ONLY drawings R700 through R702.
8. Payment under Bid Item No. 8 (OPTION 6) will be made at the contract lump-sum price and will constitute full compensation for furnishing all materials, equipment, plant, tools, and all labor costs and other associated incidentals necessary to “Demolish Building 497” as shown on drawing C003 and the FOR REFERENCE ONLY drawings R600 through R602.
| BIDDING SCHEDULE |
| BASE BID |
| OPTION NO. 1 |
| OPTION NO. 3 |
| OPTION NO. 4 |
| OPTION NO. 5 |
| OPTION NO. 6 |
| TOTAL BASE BID |