KNMD119003_C-101-R3.pdf

PDF 654 KB Posted

Attached to
ECIP:SOLAR PV ARRAYS PHASE I (KNMD119002) AND ECIP:SOLAR PV ARRAYS PHASE II (KNMD119003)
Solicitation number
W912J6-14-R-0002
Issued by

About this file

C-101 KNMD119003

View the file

Other files

File Type Posted
Q A_Dated_14AUG2014.pdf PDF
W912J614R0002-0010.pdf PDF
Q A_Dated_13AUG2014_0600_hrs.pdf PDF
W912J614R0002-0009.pdf PDF
EXHIBITDW912J614R0002REVISED.doc DOC document
Q A_Dated_12AUG2014_1030_hrs.pdf PDF
REV_00010_BID_SCHEDULE_01AUG14.pdf PDF
Q A_Dated_11AUG2014_1300_hrs.pdf PDF
Q A_Dated_11AUG2014_0800_hrs.pdf PDF
63826-E601R1.pdf PDF
W912J614R0002-0008.pdf PDF
63826-E002R1.pdf PDF
Q A_Dated_08AUG2014_0700_hrs.pdf PDF
W912J614R0002-0007.pdf PDF
Q A_Dated_06AUG2014_0700hrs.pdf PDF
HICK-SPV-481413.ECIP_1.pdf PDF
Q A_Dated_04AUG2014.pdf PDF
ECIP_Phase_2_addendum_003.pdf PDF
ECIP_Phase_1_addendum_003.pdf PDF
HICK-SPV-481413.ECIP_2.pdf PDF
W912J614R0002-0006.pdf PDF
REV_00010_BID_SCHEDULE_01AUG14.pdf PDF
W912J614R0002-0005.pdf PDF
W912J614R0002-0004.pdf PDF
EXHIBITGTEPCalcW912J614R0002REVISED.pdf PDF
Q A_Dated_01AUG2014.pdf PDF
W912J614R0002-0003.pdf PDF
JBPHHINST_5510.1_-_JBPHH_Base_Access_Regulation_22Sep11.pdf PDF
HICK-SPV-316229.ECIP_1.pdf PDF
ECIP_Phase_1_Addendum_002.pdf PDF
ECIP_Phase_2_Addendum_002.pdf PDF
HICK-SPV-316229.ECIP_2.pdf PDF
Q A_Dated_29JUL2014.pdf PDF
Q A_Dated_28JUL2014.pdf PDF
HICK-SPV-013100.ECIP_1.pdf PDF
HICK-SPV-013100.ECIP_2.pdf PDF
ECIP_I_Addendum_1.pdf PDF
HICK-SPV-013300.ECIP_1.pdf PDF
W912J614R0002-0002.pdf PDF
EXHIBITEW912J614R0002_REVISED.doc DOC document
HICK-SPV-013300.ECIP_2.pdf PDF
EXHIBITCW912J614R0002REVISED.doc DOC document
ECIP_II_Addendum_1.pdf PDF
Q A_Dated_25JUL2014.pdf PDF
W912J614R0002-Preproposal_Site_Visit_Minutes_22_Jul_14.pdf PDF
Pre-Proposal_Meeting_Attendance_Sheet_22Jul14.pdf PDF
Q A_Dated_22JUL2014.pdf PDF
Q A_Dated_14JUL2014.pdf PDF
Q A_Dated_11JUL2014.pdf PDF
W912J614R0002-0001.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

U x

E U x

E U x

E U x

E U x

E U x

E U x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

S

S x

E

U x

E

U x

E

U x

SS

x

SS

x

SS

x

S

S

EXISTING APRON

AGE

BUILDING

EXISTING FENCE

U E

UE

U E

U

E

BLDG 2324

EXISTING APRON

I-EX-TEXT

UE

U E

U

E

U

E

E

T59

E

U

E

UC UC

U

C

U

C

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

191 1615141312111098765432 17 18

N

M

L

K

J

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

C O

P Y

R I G

H T

B

U R

N S

A

N D

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

C

HAWAII AIR NATIONAL GUARD

JOINT BASE PEARL HARBOR HICKAM

OAHU, HAWAII

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

68326

Project No. - KNMD119003

W90FYQ-09-D-0002

ECIP SOLAR PV ARRAYS,

PHASE II

JANUARY 2014

01/24/14

RTA SUBMITTAL

FOR REVIEW

0 MZ

KNMD119003C-101.DWG

D. MUETING

R. BARUTH

PV FIELD SITE PLAN

BID OPTION 5

PV PANEL LAYOUT PIER

T.O.C. ELEVATION 4.00' (TYP)

SEE NOTE 11.

BID OPTION 4

PV PANEL LAYOUT PIER

T.O.C. ELEVATION 4.50' (TYP)

SEE NOTE 11.

PV PANEL LAYOUT PIER

T.O.C. ELEVATION 5.00' (TYP)

ALL CRUSHED ROCK ON WEED

CONTROL FABRIC INSTALLED

BY PHASE I. SEE DEMOLITION

NOTE 11. COORDINATE

SEQUENCE OF INSTALLATION

WITH AWARDED BID OPTIONS

BID OPTION 6

PV PANEL LAYOUT PIER

T.O.C. ELEVATION 5.00' (TYP)

SEE NOTE 11.

BID OPTION 7

PV PANEL LAYOUT PIER

T.O.C. ELEVATION 5.50' (TYP)

SEE NOTE 11.

BID OPTION 8

PV PANEL LAYOUT PIER

T.O.C. ELEVATION 6.00' (TYP)

SEE NOTE 11.

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITY LOCATIONS

BEFORE BEGINNING ANY SITE WORK. NOTIFY CONTRACTING OFFICER

IF UNKNOWN UTILITIES ARE ENCOUNTERED. CONTRACTING OFFICER

TO NOTIFY IN WRITING OF REQUIRED ACTION. SUBMIT FOUNDATION

PLAN FOR REVIEW AND APPROVAL AFTER VERIFICATION OF ALL SITE

UTILITIES.

2. ALL SCRAP METAL SHALL BE RECYCLED OFF BASE. CONTRACTOR

SHALL PROVIDE THE WEIGHT OF ALL DEMOLITION DEBRIS AND

RECYCLED SCRAP METAL TO THE CONTRACTING OFFICER.

3. THE WEIGHT OF CONCRETE TAKEN OFF BASE FOR RECYCLING SHALL

BE REPORTED TO THE CONTRACTING OFFICER. THE WEIGHT OF ALL

CONCRETE THAT IS DISPOSED OF AS SOLID WASTE SHALL ALSO BE

REPORTED TO THE CONTRACTING OFFICER AS DEMOLITION DEBRIS.

4. CONTRACTOR SHALL COORDINATE ALL UTILITY WORK WITH

CONTRACTING OFFICER.

5. IF CONTRACTOR ENCOUNTERS CONTAMINATED SOIL/FUEL; CONTACT

CONTRACTING OFFICER AND BASE ENVIRONMENTAL DEPARTMENT,

AND IF REQUIRED BY HAWAII DEPARTMENT OF ENVIRONMENTAL

PROTECTION REGULATIONS AND CONTRACTING OFFICER. REMOVE

ALL CONTAMINATED MATERIAL PER STATE AND FEDERAL

REGULATIONS AND CONTRACT SPECIFICATIONS.

6. CONTRACTOR IS REQUIRED TO OBTAIN A STORM WATER GENERAL

PERMIT FOR LAND DISTURBANCE OF MORE THAN 1 ACRE FROM

HAWAII DEPARTMENT OF ENVIRONMENTAL QUALITY.

7. TEMPORARY CONSTRUCTION FENCE TO BE INSTALLED AROUND THE

SITE FOR SEPARATION WITH AIRFIELD OPERATIONS AREA. 8 FOOT

CHAIN-LINK FENCE WITH BROWN UV RESISTANT FOD CONTROL

FABRIC.

8. TRUCK WASHOUT AREA TO BE CONSTRUCTED, MAINTAINED, AND

CLEANED IN ACCORDANCE WITH DEPT OF ENVIRONMENTAL

PROTECTION REGULATIONS. PROVIDE DETAILS AND MAINTENANCE

PLAN AS PART OF THE STORMWATER POLLUTION PREVENTION PLAN.

9. CONTRACTOR TO STOCKPILE REQUIRED MATERIALS AND EQUIPMENT

WITHIN LIMITS OF RESPECTIVE PROJECT AREA OR STAGING AREA AS

INDICATED ON THE DRAWINGS AND RESTORE THE AREA WITH 4"

TOPSOIL, SEEDING AND TEMPORARY IRRIGATION.

10. CONTRACTOR SHALL VERIFY ALL EXISTING UG IRRIGATION SYSTEMS.

CONTRACTOR SHALL CUT/CAP EXISTING LINES WHERE NEEDED,

INSTALL NEW LINES AS NEEDED AROUND THE ECIP AREA, RELOCATE

AND ADD SPRINKLER HEADS TO PROVIDE A COMPLETELY CONNECTED

SYSTEM TO ALL PORTIONS OF THE EXISTING SYSTEM AND TO

PROVIDE IRRIGATION COVERAGE TO ALL AREAS COVERED BY THE

EXISTING SYSTEM. ECIP PHASE I SHALL CLEAR THE SITE OF ALL

EXISTING IRRIGATION PIPES, DO CLEARING, ETC. FOR ECIP PHASE II

ARRAY FIELD AND DO ALL SITE WORK INCLUDING GEOTEXTILE FABRIC,

GRAVEL SURFACE, CONCRETE MOW CURB, AND FENCE WORK.

11. ECIP PHASE I BASE BID INCLUDES ALL SITE WORK FOR BOTH PHASE I

AND PHASE II AND ALL OPTION AREAS AT THE GROUND ARRAY AREA

INCLUDING CLEARING, GRUBBING, GRADING, EXISTING UTILITY

CONFIRMATION, NEW FENCE CONSTRUCTION, NEW CONCRETE MOW

STRIP, AND INSTALLATION OF UG CONDUITS TO THE WEST OF THE

SQUAD OPS HANGAR AS INDICATED. COORDINATE THE INSTALLATION

OF THE GEOTEXTILE FABRIC, ROCK COVER, AND CONCRETE MOW

CURB WITH THE AWARDED SECTIONS OF THE PV ARRAY AND ITS

ASSOCIATED FOUNDATIONS, CONDUITS, AND OTHER RELATED WORK

ELEMENTS.

DEMOLITION NOTES:

1. ALL WEED CONTROL FABRIC AND CRUSHED ROCK GROUND COVER TO

BE INCLUDED IN PHASE I OF THE ECIP PROJECT FOR THE ENTIRE

PHASE I AND II PV ARRAY FIELD INCLUDING ALL OPTION AREAS.

COORDINATE INSTALLATION SEQUENCE WITH AWARDED OPTIONS IN

PHASE I AND PHASE II DRAWINGS.

2. ALL ELECTRICAL WORK BETWEEN THE LIMITS OF THE PV ARRAY

GOING TO THE AGE BUILDING SHALL BE COMPLETED TO MINIMIZE

IMPACTS ON BUILDING ACCESS AND SHALL BE DONE IN TIMELY AND

EFFICIENT MANNER. THE PHASING OF THE CONSTRUCTION SHALL

MAINTAIN CONTINUOUS SAFE BUILDING ACCESS DURING ALL WORK

AND LIMIT THE DURATION TO COMPLETE WORK WITHIN THE FINISHED

LANDSCAPED AREA TO A MAXIMUM OF 10 CALENDAR DAYS. ALL

DAMAGED HARDSCAPE ELEMENTS SHALL BE RESTORED TO MATCH

EXISTING MATERIALS AND JOINTING. ALL DISTURBED LANDSCAPING,

PLANTING, IRRIGATION SYSTEMS, GRASS/TURF AREAS SHALL BE

RESTORED TO PRE-CONTRACT CONDITIONS. ALL PLANTINGS SHALL

MATCH EXISTING ITEMS IN SIZE AND TYPE. ALL GRASS TYPES SHALL

MATCH EXISTING GRASSES. CONTRACTOR SHALL MAINTAIN ALL

DISTURBED AREAS INCLUDING WEEDING, FERTILIZER AND

MONITORING OF IRRIGATION UNTIL NEW PLANTINGS AND GRASS ARE

FULLY RE-ESTABLISHED. CONTRACTOR SHALL SUBMIT IN HIS

EXECUTION PLAN SKETCHES IDENTIFYING ALL AREAS THAT WILL BE

DISTURBED BY HIS ACTIONS AND IDENTIFY MATERIALS, PLANTS, ETC.

THAT WILL BE USED TO REPLACE OR REPAIR AREAS. THIS PLAN

SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO

BEGINNING ANY WORK.

PV SITE PLAN NOTES:

TEMPORARY

CONSTRUCTION

FENCE SEE NOTE 7

SEE DRAWING C-102 PHASE I

PACKAGE FOR LAYOUT OF

FENCE AND PV ARRAYS.

DUCTBANK SEE ELECTRICAL

DRAWING. SEE NOTE 2.

EXISTING UNDERGROUND

COMMUNICATIONS LINE

1 07/28/14 ADDENDUM 002 MZ

2 07/30/14 ADDENDUM 003 MZ

3 08/07/14 ADDENDUM 004 MZ

File details come from the government source that posted it. Updated .