KNMD119003_C-101-R3.pdf
PDF 654 KB Posted
- Attached to
- ECIP:SOLAR PV ARRAYS PHASE I (KNMD119002) AND ECIP:SOLAR PV ARRAYS PHASE II (KNMD119003)
- Solicitation number
- W912J6-14-R-0002
- Issued by
-
Department of the Army National Guard
About this file
C-101 KNMD119003
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
U x
E U x
E U x
E U x
E U x
E U x
E U x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
E
U x
E
U x
E
U x
SS
x
SS
x
SS
x
S
S
EXISTING APRON
AGE
BUILDING
EXISTING FENCE
U E
UE
U E
U
E
BLDG 2324
EXISTING APRON
I-EX-TEXT
UE
U E
U
E
U
E
E
T59
E
U
E
UC UC
U
C
U
C
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
191 1615141312111098765432 17 18
N
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
C O
P Y
R I G
H T
B
U R
N S
A
N D
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
HAWAII AIR NATIONAL GUARD
JOINT BASE PEARL HARBOR HICKAM
OAHU, HAWAII
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
68326
Project No. - KNMD119003
W90FYQ-09-D-0002
ECIP SOLAR PV ARRAYS,
PHASE II
JANUARY 2014
01/24/14
RTA SUBMITTAL
FOR REVIEW
0 MZ
KNMD119003C-101.DWG
D. MUETING
R. BARUTH
PV FIELD SITE PLAN
BID OPTION 5
PV PANEL LAYOUT PIER
T.O.C. ELEVATION 4.00' (TYP)
SEE NOTE 11.
BID OPTION 4
PV PANEL LAYOUT PIER
T.O.C. ELEVATION 4.50' (TYP)
SEE NOTE 11.
PV PANEL LAYOUT PIER
T.O.C. ELEVATION 5.00' (TYP)
ALL CRUSHED ROCK ON WEED
CONTROL FABRIC INSTALLED
BY PHASE I. SEE DEMOLITION
NOTE 11. COORDINATE
SEQUENCE OF INSTALLATION
WITH AWARDED BID OPTIONS
BID OPTION 6
PV PANEL LAYOUT PIER
T.O.C. ELEVATION 5.00' (TYP)
SEE NOTE 11.
BID OPTION 7
PV PANEL LAYOUT PIER
T.O.C. ELEVATION 5.50' (TYP)
SEE NOTE 11.
BID OPTION 8
PV PANEL LAYOUT PIER
T.O.C. ELEVATION 6.00' (TYP)
SEE NOTE 11.
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITY LOCATIONS
BEFORE BEGINNING ANY SITE WORK. NOTIFY CONTRACTING OFFICER
IF UNKNOWN UTILITIES ARE ENCOUNTERED. CONTRACTING OFFICER
TO NOTIFY IN WRITING OF REQUIRED ACTION. SUBMIT FOUNDATION
PLAN FOR REVIEW AND APPROVAL AFTER VERIFICATION OF ALL SITE
UTILITIES.
2. ALL SCRAP METAL SHALL BE RECYCLED OFF BASE. CONTRACTOR
SHALL PROVIDE THE WEIGHT OF ALL DEMOLITION DEBRIS AND
RECYCLED SCRAP METAL TO THE CONTRACTING OFFICER.
3. THE WEIGHT OF CONCRETE TAKEN OFF BASE FOR RECYCLING SHALL
BE REPORTED TO THE CONTRACTING OFFICER. THE WEIGHT OF ALL
CONCRETE THAT IS DISPOSED OF AS SOLID WASTE SHALL ALSO BE
REPORTED TO THE CONTRACTING OFFICER AS DEMOLITION DEBRIS.
4. CONTRACTOR SHALL COORDINATE ALL UTILITY WORK WITH
CONTRACTING OFFICER.
5. IF CONTRACTOR ENCOUNTERS CONTAMINATED SOIL/FUEL; CONTACT
CONTRACTING OFFICER AND BASE ENVIRONMENTAL DEPARTMENT,
AND IF REQUIRED BY HAWAII DEPARTMENT OF ENVIRONMENTAL
PROTECTION REGULATIONS AND CONTRACTING OFFICER. REMOVE
ALL CONTAMINATED MATERIAL PER STATE AND FEDERAL
REGULATIONS AND CONTRACT SPECIFICATIONS.
6. CONTRACTOR IS REQUIRED TO OBTAIN A STORM WATER GENERAL
PERMIT FOR LAND DISTURBANCE OF MORE THAN 1 ACRE FROM
HAWAII DEPARTMENT OF ENVIRONMENTAL QUALITY.
7. TEMPORARY CONSTRUCTION FENCE TO BE INSTALLED AROUND THE
SITE FOR SEPARATION WITH AIRFIELD OPERATIONS AREA. 8 FOOT
CHAIN-LINK FENCE WITH BROWN UV RESISTANT FOD CONTROL
FABRIC.
8. TRUCK WASHOUT AREA TO BE CONSTRUCTED, MAINTAINED, AND
CLEANED IN ACCORDANCE WITH DEPT OF ENVIRONMENTAL
PROTECTION REGULATIONS. PROVIDE DETAILS AND MAINTENANCE
PLAN AS PART OF THE STORMWATER POLLUTION PREVENTION PLAN.
9. CONTRACTOR TO STOCKPILE REQUIRED MATERIALS AND EQUIPMENT
WITHIN LIMITS OF RESPECTIVE PROJECT AREA OR STAGING AREA AS
INDICATED ON THE DRAWINGS AND RESTORE THE AREA WITH 4"
TOPSOIL, SEEDING AND TEMPORARY IRRIGATION.
10. CONTRACTOR SHALL VERIFY ALL EXISTING UG IRRIGATION SYSTEMS.
CONTRACTOR SHALL CUT/CAP EXISTING LINES WHERE NEEDED,
INSTALL NEW LINES AS NEEDED AROUND THE ECIP AREA, RELOCATE
AND ADD SPRINKLER HEADS TO PROVIDE A COMPLETELY CONNECTED
SYSTEM TO ALL PORTIONS OF THE EXISTING SYSTEM AND TO
PROVIDE IRRIGATION COVERAGE TO ALL AREAS COVERED BY THE
EXISTING SYSTEM. ECIP PHASE I SHALL CLEAR THE SITE OF ALL
EXISTING IRRIGATION PIPES, DO CLEARING, ETC. FOR ECIP PHASE II
ARRAY FIELD AND DO ALL SITE WORK INCLUDING GEOTEXTILE FABRIC,
GRAVEL SURFACE, CONCRETE MOW CURB, AND FENCE WORK.
11. ECIP PHASE I BASE BID INCLUDES ALL SITE WORK FOR BOTH PHASE I
AND PHASE II AND ALL OPTION AREAS AT THE GROUND ARRAY AREA
INCLUDING CLEARING, GRUBBING, GRADING, EXISTING UTILITY
CONFIRMATION, NEW FENCE CONSTRUCTION, NEW CONCRETE MOW
STRIP, AND INSTALLATION OF UG CONDUITS TO THE WEST OF THE
SQUAD OPS HANGAR AS INDICATED. COORDINATE THE INSTALLATION
OF THE GEOTEXTILE FABRIC, ROCK COVER, AND CONCRETE MOW
CURB WITH THE AWARDED SECTIONS OF THE PV ARRAY AND ITS
ASSOCIATED FOUNDATIONS, CONDUITS, AND OTHER RELATED WORK
ELEMENTS.
DEMOLITION NOTES:
1. ALL WEED CONTROL FABRIC AND CRUSHED ROCK GROUND COVER TO
BE INCLUDED IN PHASE I OF THE ECIP PROJECT FOR THE ENTIRE
PHASE I AND II PV ARRAY FIELD INCLUDING ALL OPTION AREAS.
COORDINATE INSTALLATION SEQUENCE WITH AWARDED OPTIONS IN
PHASE I AND PHASE II DRAWINGS.
2. ALL ELECTRICAL WORK BETWEEN THE LIMITS OF THE PV ARRAY
GOING TO THE AGE BUILDING SHALL BE COMPLETED TO MINIMIZE
IMPACTS ON BUILDING ACCESS AND SHALL BE DONE IN TIMELY AND
EFFICIENT MANNER. THE PHASING OF THE CONSTRUCTION SHALL
MAINTAIN CONTINUOUS SAFE BUILDING ACCESS DURING ALL WORK
AND LIMIT THE DURATION TO COMPLETE WORK WITHIN THE FINISHED
LANDSCAPED AREA TO A MAXIMUM OF 10 CALENDAR DAYS. ALL
DAMAGED HARDSCAPE ELEMENTS SHALL BE RESTORED TO MATCH
EXISTING MATERIALS AND JOINTING. ALL DISTURBED LANDSCAPING,
PLANTING, IRRIGATION SYSTEMS, GRASS/TURF AREAS SHALL BE
RESTORED TO PRE-CONTRACT CONDITIONS. ALL PLANTINGS SHALL
MATCH EXISTING ITEMS IN SIZE AND TYPE. ALL GRASS TYPES SHALL
MATCH EXISTING GRASSES. CONTRACTOR SHALL MAINTAIN ALL
DISTURBED AREAS INCLUDING WEEDING, FERTILIZER AND
MONITORING OF IRRIGATION UNTIL NEW PLANTINGS AND GRASS ARE
FULLY RE-ESTABLISHED. CONTRACTOR SHALL SUBMIT IN HIS
EXECUTION PLAN SKETCHES IDENTIFYING ALL AREAS THAT WILL BE
DISTURBED BY HIS ACTIONS AND IDENTIFY MATERIALS, PLANTS, ETC.
THAT WILL BE USED TO REPLACE OR REPAIR AREAS. THIS PLAN
SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO
BEGINNING ANY WORK.
PV SITE PLAN NOTES:
TEMPORARY
CONSTRUCTION
FENCE SEE NOTE 7
SEE DRAWING C-102 PHASE I
PACKAGE FOR LAYOUT OF
FENCE AND PV ARRAYS.
DUCTBANK SEE ELECTRICAL
DRAWING. SEE NOTE 2.
EXISTING UNDERGROUND
COMMUNICATIONS LINE
1 07/28/14 ADDENDUM 002 MZ
2 07/30/14 ADDENDUM 003 MZ
3 08/07/14 ADDENDUM 004 MZ