ECIP_Phase_1_addendum_003.pdf
PDF 1 MB Posted
- Attached to
- ECIP:SOLAR PV ARRAYS PHASE I (KNMD119002) AND ECIP:SOLAR PV ARRAYS PHASE II (KNMD119003)
- Solicitation number
- W912J6-14-R-0002
- Issued by
-
Department of the Army National Guard
About this file
ECIP Phase I Addendum 0003
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
U x
E U x
E U x
E U x
E U x
E U x
E U x
E
U x
E
U x
E
U x
E x
E x
E x
E x
E x
E x
E x
E x
E x
AGE
BUILDING
EXISTING
PARKING
E 1,657,286.82
N 55,394.65
E 1,657,332.47
MATCH EXISTING
FENCE
N 55,680.20
E 1,657,235.63
N 55,639.97
E 1,657,241.69
N 55,709.31
E 1,657,123.87
N 55,719.62
.5 m
[1 .0
A C
C E
S S
D R
IV
E
E 1,657,269.12
N 55,186.36
BUILDING 2324
E 1,657,170.22
N 55,389.79
E 1,657,170.22
N 55,195.02
E 1,657,186.47
N 55,208.65
E 1,657,170.35
4.00' PERSONNEL GATE
N 55,337.43 m
A
C
C
E
S
D
R
I V
E
E 1,657,307.52
N 55,377.78
BATTERY
SELFRIDGE
EXISTING
F22 SQUAD
OPS HANGER
E 1,657,323.80
N 55,667.56
.5 m
[1 .0
G R
A V
E L A
C C
E S
S
D R
IV
E
CONTROL PANEL SLAB
(6' X 4') TOC = 5.50
SEE ELECTRICAL
DRAWINGS
E 1,657,293.78
N 55,254.39
UE UE
U E
U
E
E 1,657,096.89
N 55,411.26
EXISTING
PARKING LOT
E 1,657,307.73
N 55,633.67
E 1,657,251.88
N 55,653.61
E 1,657,257.94
N 55,722.95
E 1,657,323.80
N 55,647.32
E 1,657,110.23
N 55,735.87
E 1,657,323.80
N 55,381.44
CONNECT TO
EXISTING FENCE
E 1,657,080.64
N 55,397.63
E 1,657,202.08
N 55,387.00
UE
E
C
U C
HH2G
E
E
E
E
UC
C
UE
U E
U
E
U
E
UE
UC
E
UC
E
U
E
U
C
1. ALL WEED CONTROL FABRIC AND CRUSHED ROCK GROUND COVER TO
BE INCLUDED IN PHASE I OF THE ECIP PROJECT FOR THE ENTIRE
PHASE I AND II PV ARRAY FIELD INCLUDING ALL OPTION AREAS.
COORDINATE INSTALLATION SEQUENCE WITH AWARDED OPTIONS IN
PHASE I AND PHASE II DRAWINGS. SEE NOTE 11, C-101.
2. ALL ELECTRICAL WORK BETWEEN THE LIMITS OF THE PV ARRAY
GOING WEST AND IN FRONT OF THE SQUAD OPS HANGAR SHALL BE
COMPLETED TO MINIMIZE IMPACTS ON BUILDING ACCESS AND SHALL
BE DONE IN TIMELY AND EFFICIENT MANNER. THE PHASING OF THE
CONSTRUCTION SHALL MAINTAIN CONTINUOUS SAFE BUILDING
ACCESS DURING ALL WORK AND LIMIT THE DURATION TO COMPLETE
WORK IN FRONT OF OR WITHIN THE FINISHED LANDSCAPED AREA
NEAR SQUAD OPS TO A MAXIMUM OF 10 CALENDAR DAYS. ALL
DAMAGED HARDSCAPE ELEMENTS SHALL BE RESTORED TO MATCH
EXISTING MATERIALS AND JOINTING. AT LEAST ONE SIDEWALK
BETWEEN THE PARKING LOT AND SQUAD OPS HANGAR SHALL REMAIN
OPEN AT ALL TIMES. ALL DISTURBED LANDSCAPING, PLANTING,
IRRIGATION SYSTEMS, GRASS/TURF AREAS SHALL BE RESTORED TO
PRE-CONTRACT CONDITIONS. ALL PLANTINGS SHALL MATCH EXISTING
ITEMS IN SIZE AND TYPE. ALL GRASS TYPES SHALL MATCH EXISTING
GRASSES. CONTRACTOR SHALL MAINTAIN ALL DISTURBED AREAS
INCLUDING WEEDING, FERTILIZER AND MONITORING OF IRRIGATION
UNTIL NEW PLANTINGS AND GRASS ARE FULLY RE-ESTABLISHED.
CONTRACTOR SHALL SUBMIT IN HIS EXECUTION PLAN SKETCHES
IDENTIFYING ALL AREAS THAT WILL BE DISTURBED BY HIS ACTIONS
AND IDENTIFY MATERIALS, PLANTS, ETC. THAT WILL BE USED TO
REPLACE OR REPAIR AREAS. THIS PLAN SHALL BE APPROVED BY THE
CONTRACTING OFFICER PRIOR TO BEGINNING ANY WORK.
3. CONCRETE MOW STRIP TO BE 12" WIDE BY 12" DEEP WITH 4-#5 BARS
LONGITUDINALLY.
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
191 1615141312111098765432 17 18
N
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
C O
P Y
R I G
H T
B
U R
N
A
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
HAWAII AIR NATIONAL GUARD
JOINT BASE PEARL HARBOR HICKAM
OAHU, HAWAII
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
68326
Project No. - KNMD119002
JANUARY 2014
01/24/14
RTA SUBMITTAL
FOR REVIEW
0 MZ
W90FYQ-09-D-0002
ECIP SOLAR PV ARRAYS,
PHASE I
KNMD119002C-102.DWG
D. MUETING
R. BARUTH
MATCH
EXISTING
FENCE
PV FIELD SITE PLAN
F
H
A N
G A
R
EXISTING
FENCE
EXISTING
FENCE
M
A
M
A
L
B
Y
R
I V
E
EXISTING
RMAG
PHASE 1 PV ARRAYS SEE DRAWING E-002
BASE BID
PIER T.O.C. ELEV. 5.00
BID OPTION 1
PIER T.O.C. ELEV. 4.50
BID OPTION 2
PIER T.O.C. ELEV. 4.00
PH II PV ARRAY
COVER THE GROUND AREA WITH 6" LAYER OF OPEN
GRADED 2" BROWN/TAN COLOR CRUSHED ROCK ON
WEED CONTROL FABRIC AFTER INSTALLATION OF
FOUNDATIONS (TYP)
24' X 4'
EQUIPMENT
SLAB TOC = 6.00
SEE ELECTRICAL
DRAWINGS
4' X 50'
EQUIPMENT
SLAB SEE
ELECTRICAL
DRAWINGS
MANHOLE
COORDINATE NEW
ELECTRICAL WITH
EXISTING UTILITIES.
SEE NOTE 2.
SECURITY
FENCE WITH
CONCRETE
MOW STRIP
HANDHOLE
PV SITE PLAN NOTES:
PHASE II PV
ARRAYS
SEE NOTE 1
HANDHOLE
SEE ELECTRICAL
DRAWINGS
SEE DRAWING E-002
FOR SITE ELECTRICAL
SEE NOTE 2.
EXISTING TRANSFORMER
CONCRETE MOW STRIP
(12" WIDE, 12" DEEP)
SEE NOTE 3
12" WIDE BY 12" DEEP CONCRETE MOW STRIP
AROUND PERIMETER OF ROCK SURFACE. SEE
DETAIL 2, C-500.
12" MOW STRIP AROUND
ENTIRE PERIMETER. SEE
NOTE 3.
12" MOW STRIP
SEE NOTE 3.
12" MOW STRIP SEE NOTE 3.
COVER AREA WITH
4" TOP SOIL SEEDING AND
TEMPORARY IRRIGATION AFTER
DEMOLITION OF ENTRANCE
DRIVE
SEE NOTE 2
4.57m [15.00']
ACCESS DRIVE
EXISTING
UNDERGROUND
COMMUNICATIONS
LINE
1 07/28/14 ADDENDUM 002 MZ
2 07/30/14 ADDENDUM 003 MZ
8+009+00
F
M
E 1654577.46
INSTALL PV PIER
T.O.C. = 7.50 (TYP)
N 55167.96
E 1654578.96
INSTALL PV PIER
T.O.C. = 7.50 (TYP)
N 55293.96
E 1654455.96
PV PIER
T.O.C. = 7.50 (TYP)
N 55293.96
E 1654469.46
INSTALL PV PIER
T.O.C. = 7.50 (TYP)
N 55167.96
U
C
U
E
U
E
UE
UE
U E
U E
U E
U
E
U
C
C
U E
U
C
U
C
HB
HB
HBHB
HD
HD
HD
HD
HD
HDHD
HB
8+009+00
F
M
ELECTRICAL SLAB
152mm [6"] GRANULAR
FILL
SEE STRUCTURAL DRAWINGS FOR
FOUNDATION INFORMATION
PRECAST CONCRETE CAP
m m
BOND BEAM - SEE
STRUCT.
TOP OF BRICK
EL = 33.32m [109'-4"]
FINISH FLOOR
ARCH EL = 30.48m [100'-0"]
CIVIL = 5.50'
EXPANSION JOINT
BETWEEN WALL AND
CONCRETE
B3
203mm [8"]
SPLIT-FACED CMU
m m
102mm [4"] X 203mm [8"]
SMOOTH-FACED CMU
102mm [4"] X 203mm [8"]
SMOOTH-FACED CMU
m m m m m m
229mm [9"]
114mm
[4 1/2"]
19.mm [3/4"] 19mm [3/4"]SCREENWALL
THICKNESS
114mm
[4 1/2"]
CONTINUOUS DRIP
EACH SIDE
CMU VENEER
DOWELS
CMU WALL
KNMD119002C-103.DWG
D. MUETING
R. BARUTH D. LENZ
OVERALL CIVIL SITE PLAN
NOTES:
LEGEND
CONCRETE
SIDEWALK
1. ALL COORDINATES AND DIMENSIONS ARE TO EXTERIOR CORNER OF BUILDING SLAB, FACE OF CURB, OR EDGE OF PAVEMENT AND ARE IN FEET UNLESS NOTED OTHERWISE..
2. CONTRACTOR SHALL REINFORCE ALL CONCRETE SLABS THAT HAVE MANHOLES, CLEANOUTS,
GUARD POSTS, OR ARE IRREGULAR IN SHAPE AS INDICATED OR AS DIRECTED BY CONTRACTING
OFFICER.
3. CONTRACTOR TO FIELD VERIFY LOCATION, SIZE, BOLT PATTERN, AND ELEVATION OF CONCRETE
PIERS PRIOR TO SUBMITTING SHOP DRAWINGS AND STEEL FABRICATION.
4. CONTRACTOR SHALL PLACE PROTECTION FOR ALL PAVEMENTS AND EXISTING NEW FINISHES PRIOR
TO BEGINNING ANY CONSTRUCTION OF ECIP COVERED PARKING IN FRONT OF THE F-22 SIMULATOR
FACILITY. THERE SHALL BE NO DRIVING OF EQUIPMENT ON CONCRETE FINISHES - MUST PLACE
PROTECTION FIRST SUCH AS PLYWOOD OVER THE AREA OF PROJECT WORK. NO SCOOPING OF
SOILS OR FOUNDATION BORING MATERIALS WITH A BOBCAT SHALL BE DONE DIRECTLY ON THE
SURFACE OF THE CONCRETE SIDEWALKS OR PAVEMENTS UNLESS COMPLETELY COVERED WITH
DURABLE MATERIALS FOR PROTECTION. ALL WORK DIRECTLY ON SIDEWALKS SHALL BE DONE BY
HAND SHOVELING AND THE SURFACES SHALL BE SWEPT CLEAN ON A DAILY BASIS. CONTRACTOR
SHALL MAKE A FULL ASSESSMENT OF THE EXISTING CONDITIONS AT THE START OF CONSTRUCTION
FOR ESTABLISHING THE BASE LINE AND THEN DOCUMENT WHAT WILL BE CONSIDERED DAMAGE OR
DAMAGED ITEMS BY THIS CONTRACT WORK. CONTRACTOR SHALL WALK THE AREA OF PROPOSED
CONSTRUCTION WITH THE CONTRACTING OFFICER AND PHOTOGRAPH/DOCUMENT ALL AREAS FOR
EXISTING SITE CONDITIONS. ANY DAMAGE TO CONCRETE SIDEWALKS OR PARKING LOT PAVEMENTS
SHALL BE REPLACED FULL DEPTH IN COMPLETE PANELS. SAWCUT THE PERIMETER OF THE
EXISTING PANEL FULL DEPTH, REMOVE THE PAVEMENT WITHOUT DAMAGING ADJACENT PANELS,
INSTALL REQUIRED DOWELS AND REBAR AND PLACE NEW CONCRETE WITH JOINTS AND SEALANTS
TO MATCH EXISTING SITE CONDITIONS. IT IS CRITICAL THAT THE RECENTLY CONSTRUCTED
PARKING LOT AND NEW SIMULATOR FINISHES NOT BE DAMAGED IN ANY WAY WHILE EXECUTING THE
ECIP PROJECT. ALL REPAIRS AND METHODS SHALL BE APPROVED IN WRITING PRIOR TO BEGINNING
ANY WORK..
5. CONTRACTOR SHALL SCHEDULE AND EXECUTE THE WORK TO MINIMIZE IMPACT TO THE
GOVERNMENT USE OF THE NEWLY CONSTRUCTED PARKING LOT. THE PARKING LOT SHALL NOT BE
COMPLETELY CLOSED FOR ANY DURATION OF THE WORK. THE INSTALLATION OF THE SUNSHADES
AND STRUCTURES SHALL BE DONE TO KEEP AT LEAST ONE ROW OF PARKING OPEN AT ALL TIMES
FOR USE BY THE BUILDING OCCUPANTS. IF THE ENTIRE LOT MUST ME CLOSED IT SHALL BE LIMITED
TO ONLY 5 WORKING DAYS AND SHALL NOT OCCUR MORE THAN THREE TIMES DURING THE ENTIRE
INSTALLATION OF THE PV SUNSHADES IN THE SIMULATOR BUILDING PARKING LOT. BUILDING
ACCESS SHALL NOT BE BLOCKED AT ANY TIME DURING THE CONSTRUCTION ACTIVITIES. THE JOB
SITE SHALL BE KEPT CLEAN AND WELL ORGANIZED. NO LANDSCAPING OR UNPAVED AREAS
AROUND THE PARKING LOT SHALL BE DAMAGED EXCEPT FOR THE INSTALLATION OF CONDUITS OR
CABLING. ALL DISTURBED AREAS SHALL BE RESTORED TO THEIR EXISTING CONDITIONS INCLUDING
PLANTINGS, SEEDING, SODDING, AND IRRIGATION. ALL PLANTINGS SHALL MATCH EXISTING
PLANTINGS IN SIZE AND TYPE.
INSTALL
NEW SIDEWALK
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
191 1615141312111098765432 17 18
N
M
L
K
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
C O
P Y
R I G
H T
B
U R
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
HAWAII AIR NATIONAL GUARD
JOINT BASE PEARL HARBOR HICKAM
OAHU, HAWAII
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
68326
Project No. - KNMD119002
JANUARY 2014
01/24/14
RTA SUBMITTAL
FOR REVIEW
0 MZ
W90FYQ-09-D-0002
ECIP SOLAR PV ARRAYS,
PHASE I
I:\USNGB\52085\CAD\CIVIL\ECIP\SHEETS\KNMD119002C-103.DWG 7/30/2014 1:44 PM D_MUETING
5.00'(TYP)
PARKING LOT PV SYSTEM
(SEE SHEET S-005)
6.00'
INSTALL
NEW SIDEWALK
AROUND PV
PIERS
121.00'
18.00' (TYP)
18.00' (TYP)
INSTALL PV PIERS (TYP) FILL IN
SIDEWALK CONCRETE AROUND
NEW PV PIER COLUMNS (TYP)
EXISTING SIMULATOR PARKING
LOT (SEE NOTES 5, 6)
EXISTING PV PIERS
(TYP 5)
EXISTING PV PIERS
(TYP 5)
SEE NOTE 3.
INSTALL
PV PIERS (TYP 15)
INSTALL SCREEN WALL
AROUND ELECTRICAL
EQUIPMENT.
C
SCALE IN FEET
2' 4'
ECIP ENCLOSURE WALL SECTION
SECTION C
TYPICAL PRECAST CONCRETE
CAP AT SCREEN WALL
SECTION 2
ELECTRICAL EQUIPMENT SLAB
INSIDE WALLS AREA.
10.00'
1 07/30/14 ADDENDUM 003 MZ
| KNMD119002 C-102-R2 |
| KNMD119002 C-103-R1 |
File details come from the government source that posted it. Updated .