W912J613R0004-0004 AMENDMENT 0004

View the file

Other files

File Type Posted
Q A_Dated_16Aug13.pdf PDF
Amend__7-W912J613R0004-0007.pdf PDF
Q A_Dated_13Aug13_1130_hrs.pdf PDF
Q A_Dated_13Aug13_1030_hrs.pdf PDF
Q A_Dated_13Aug13_0900_hrs.pdf PDF
W912J613R0004-0006.pdf PDF
BID_SCHEDULE_13AUG13.pdf PDF
Q A_Dated_09Aug13_0900_hrs.pdf PDF
Adden0004-REVISED_Asbestos_Report.pdf PDF
W912J613R0004-0005.pdf PDF
Adden0004-REVISED_LBP_Report.pdf PDF
REVISED_EXHIBIT_F_W912J613R0004.pdf PDF
REVISED_EXHIBIT_H.pdf PDF
Q A_Dated_08Aug13_0900hrs.pdf PDF
Q A_Dated_08Aug13.pdf PDF
Vol_1_KNMD119001_Drawing_G002_ADD_002.pdf PDF
KNMD119001_SPECS-Add_003.pdf PDF
SPECS-Addendum0002_KNMD119001.pdf PDF
Q A_Dated_05Aug13.pdf PDF
W912J613R0004-0003.pdf PDF
Vol_1_KNMD119001_Drawing-Add_002.pdf PDF
W912J613R0004-0002.pdf PDF
KNMD069216 119001_ASBESTOS_REPORT.pdf PDF
KNMD069216 119001_SOIL_SAMPLING_REPORT.pdf PDF
KNMD069216 119001_LEAD_SCREENING_REPORT.pdf PDF
PrePropMinutes01Aug13-W912J613R0004.pdf PDF
Q A_Dated_02Aug13.pdf PDF
PreProp_Sign_In_Sheet_01Aug13.pdf PDF
Non-disclosure_certificate__contractor.docx DOCX document
Q A_Dated_01Aug13.pdf PDF
W912J613R0004-0001.pdf PDF
Vol_3_AF_DWG_8443128_Sheet_S1-Add-001.pdf PDF
Vol_1_KNMD119001_Drawing-Add_001.pdf PDF
Q A_Dated_31Jul13.pdf PDF
Q A_Dated_26Jul13.pdf PDF
Q A_Dated_16Jul13.pdf PDF
EXHIBIT_H_TEP_Calc_W912J613R0004.docx DOCX document
EXHIBIT_C_W912J613R0004.doc DOC document
EXHIBIT_F_W912J613R0004.docx DOCX document
EXHIBIT_D_and_E__W912J613R0004.doc DOC document
Exhibit_J_W912J613R0004.doc DOC document
Exhibit_I_TEP_SAMPLE_W912J613R0004.docx DOCX document
EXHIBIT_G_-SB_Participation_Plan_W912J613R0004.docx DOCX document
W912J613R0004.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

W912J6

Purpose of Amendment 0004 is to incorporate Addendum 0003 and update the Wage Determination.

Wage Determination has been updated to General Decision Number: HI130001 07/26/2013 HI1

W912J6

USPFO FOR HAWAII

CPT MANUEL LLANES

91-1179 ENTERPRISE AVE

KAPOLEI, HI 96707-2150

See Item 6

J

F7C31A3184A001

W912J6-13-R-0004

KNMD069216/119001

1 2

08/07/2013

07/16/2013

W912J6-13-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

Wage Determination has been updated to General Decision Number: HI130001 07/26/2013 HI1

AMENDMENT 0004

Amendment 0004 hereby incorporates the following Addendum 0003. Details are listed below:

1. CHANGES TO SPECIFICATIONS. Attached hereto are new and revised pages to the Specifications.

Revised pages replace like-numbered pages. The revision mark “Addendum 003” is shown on each new and revised page.

a. REVISED ITEMS: Following are revised items to the specifications. Changes are indicated with bold or underlined print or highlighted. Although the entire section is being re-issued, only the following sub-items are changed within the section:

• PROJECT TABLE OF CONTENT

The protect table of content has been updated to include the new sections issued in this addendum and previous addenda.

b. DELETED ITEMS:

• SECTION 44 42 53 (Deleted in Q&A Dated 05 Aug 13)

c. NEW ITEMS:

• SECTION 09 97 13.27

• SECTION 33 32 13.14

• SECTION 33 56 10

• SECTION 33 58 00

2. CHANGES TO THE DRAWINGS: Attached hereto are new and revised sheets to the Drawing. Revised

Drawings replace like-numbered pages. The revision mark “B” is shown on each new and revised page.

a. REVISED DRAWINGS (NOT ISSUED).

• None

b. REVISED DRAWINGS (ISSUED). The following revised drawings replace like-numbered drawings and are issued herewith:

SHEET SEQ. SHEET. NO. LTR REVISION DATE

Volume 1 02 of 88 G-002 B 02 AUG 13

The index of drawings was updated to include the new sheets issued in previous addendum.

c. NEW DRAWINGS (ISSUED). The following new drawings are issued herewith: