PrePropMinutes01Aug13-W912J613R0004.pdf
PDF 1 MB Posted
- Attached to
- TFI-F-22 Combat Aircraft Parking Apron (KNMD069216) and TFI-F-22 Combat Apron Addition (KNMD119001)
- Solicitation number
- W912J6-13-R-0004
About this file
PreProposal Meeting Minutes 01Aug13
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TFI-F-22 Combat Aircraft Parking Apron TFI-F-22 Combat Apron Addition (CAPA 13)
Project #’s KNMD069216/119001 Joint Base Pearl Harbor Hickam (JBPHH)
01 Aug 13
Introductions
• Contracting Personnel
– Ellen-Jo Valade, Contracting Officer
– CPT Manuel Llanes, Local Contracting Officer
– Julianne Cooper, CTR, Contract Admin
• Site Visit
– Lt Col Jesus Figueroa, Program Manager
– Major Cyrus Lung
REMINDER THAT ALL QUESTIONS MUST BE SUBMITTED
THROUGH THE APPROPRIATE PROCESS DETAILED IN
SOLICIATION SECTION 00100 PARAGRAPH 3. DO NOT
CONTACT THE INDIVIDUALS LISTED DIRECTLY.
Synopsis
• Combat Aircraft Parking Apron & Combat Apron Addition, commonly known as CAPA 13
• Magnitude is $5,000,000 to $10,000,000
• A Firm-Fixed Price Contract will be awarded
Synopsis
• Project is being solicited UNRESTRICTED
• The contract will be awarded using Source
Selection Tradeoff Procedures
• Evaluation Factors
– Technical
– Past Performance
– Price
Solicitation, Plans & Specs
• On the web – https://www.fbo.gov
• Solicitation
– Exhibits
– Questions & Answers document
– Amendments
• Check regularly & REFRESH the webpage
• Plans & Specs are RESTRICTED ACCESS
• Firms must be registered and have password on
FBO.gov https://www.fbo.gov/
• Export Controlled Materials
– Companies must be certified (via approved DD2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS)
– Questions about this program or DD2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted at (800)352- 3572 or email jcp-admin@dla.mil mailto:jcp-admin@dla.mil
• The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO.gov to have their JCP number to their FBO.gov account. JCP has indicated they are currently experiencing a three (3) week delay in addition to the normal waiting period.
• If your firm has applied to JCP for certification but has not yet received MPIN, documents can be provided to your firm if you provide proof your firm has submitted application to JCO.
– Tracking slip, certified return receipt, sent email message, delivered email message, etc.
• See Contracting Officer after the meeting with your proof and to sign for electronic distribution.
• You will need a valid email address to receive documents in this manner.
Contract Period of Performance
Construction Period is 540 Calendar Days After Receiving
The Notice to Proceed
Disclaimer
The following is a brief overview of the proposal requirements
• Offerors are strongly cautioned to carefully read the requirements of the solicitation and comply accordingly
Volume 1-Cost/Price Info & Pro Forma Documents
• Offeror portion of SF 1442
• Section 00010-Pricing Info-All Line Items
• Exhibits F and H
• Section 00600-Reps & Certs
– Complete Reps & Certs on the web at https://www.sam.gov/portal/public/SAM/
– Complete & return Reps & Certs in Section 00600
– Include Introductory Page-Section 00100 Para
3.4.1.2 lists required information https://www.sam.gov/portal/public/SAM/
Volume 1-Cost/Price Info & Pro Forma Documents
• Exhibit D completed
• If Applicable Small Business Subcontracting Plan
– MUST have original signature
• Sealed Envelope Sealed Envelope
– FAR 9.105-1
– Containing letters from financial institutions concerning your firm’s credit worthiness AND capability to bond at a minimum to the price proposed.
Volume #2 Part I Technical Capability Proposal
NO PRICES/COST IN THIS VOLUME
• Part I- Technical Capability Proposal
• Comprised of four (4) sub factors
1. Contractor Experience & Capability
2. Construction Equipment & Plant
3. Material & Product Compliance Schedule
4. Small Business Participation Plan
Technical Capability Proposal
NO PRICES/COST IN THIS VOLUME
• Sub factors 1, 2, & 3 are limited to a total page count of 30 pages
1. Sub Factor #1 limit of 15 pages
2. Sub Factor #2 limit of 10 pages
3. Sub Factor #3 limit of 5 pages
4. Sub Factor #4 use Exhibit G Format
• IMPORTANT-Both large & small business must complete & include Sub Factor #4- Exhibit G
Sub Factor #1
• Contractor Experience & Capability
• Limited to 15 pages (excluding tabs, indexes, resumes)
• Demonstrate technical capability to perform a project of this size and complexity & familiarity with construction work associated with the local Hawaiian Island environment & involvement of the local labor workforce
• Discuss at a minimum projects submitted on in Exhibit A’s in Past/Present Performance Volume #2 Part II
• Discuss your firm’s extent of related experience and explain to what degree the offeror has the experience and capability to manage a complex construction project comparable to the work requirements of this solicitation
• Discuss experience and capability in managing a project in the local Hawaiian island environment
• Discuss involvement of the local labor workforce
• Discuss any other previous projects that are similar to this project in terms of scope, size, and complexity
• If no similar experience so state and indicate in detail how you plan to overcome this lack of experience.
• The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience.
• Discuss your management plan and approach for the execution of this contract. The narrative shall include necessary information regarding the offeror’s ability to perform complete project management of a resulting contract and all of its requirements.
• Discuss your experience and capability to meet the requirements of Spec Sect 03 30 04.00, para 2.1.2, Alkali- Silica Reactivity Aggregates and Spec Sect 32 13 11.
• Demonstrate, as a minimum, that the following key personnel have experience managing projects/contracts of the same/similar dollar magnitude, size, complexity, and scope, in the capacity which they are proposed:
– Contract Manager
– Project Manager(s)
– Site Superintendent(s)
– Estimator(s)
– Quality Control Manager(on site)
– Safety Manager/Representative (on site)
• Demonstrate personnel meet experience & education qualifications included in the contracts requirements.
• Specifically identify how the requirements of Spec Sect 01 45 00.00 10 Para 3.1 Quality Assurance General Requirements will be met.
• If no experience so state, and indicate in detail how you plan to overcome this lack of experience.
• Onus is solely on offeror to indicate in detail the plans to overcome lack of experience.
• Resumes/Cut Sheets limited to 2 pages per person
– If intended person is not currently on staff MUST have signed Exhibit B or
Letter of Intent
• Discuss means & methods utilized by your firm to accomplish demolition, ensure foreign object debris (FOD) control, and ability to accomplish construction around active airfield and parked aircraft.
• Discuss your company experience with petrography and petrographer(s). Indicate the personnel assigned the role of petrographer and demonstrate they have experience with petrography.
• If no experience so state, and indicate in detail how you plan to overcome this lack of experience.
• Onus is solely on offeror to indicate plan to overcome lack of experience.
• Project Management includes the full spectrum of activities which should be included in the overall narrative of the material submittal process, subcontractor compliance and testing laboratory.
– Discuss your approach for each of these activities.
Include discussion of policy establishing schedules for the performance of QC tasks, policy for reporting QC findings to the Govt.
– Offerors should not provide proposed QC Plan or provide plan as part of this narrative.
• Describe how you will obtain the specified aggregate, stockpile management, testing procedures, the combined aggregate gradation, and how you intend to minimize micofines from being introduces into the concrete mixture.
• Discuss how you will ensure grade control and how final evaluations will be met & verified.
• Describe how you will place the concrete to avoid segregation, paste buildup, hot concreting, and other concrete durability issues
Sub Factor #2
• Construction Equipment and Plant
• Limited to 10 pages (excluding tabs, indexes, resumes)
• Discuss as a minimum the following information:
– Concrete Operations (Age, type, number& locations of projects equipment was used. Give Sustained production rates)
– Asphalt Operations (Age, type, number& locations of projects equipment was used. Give Sustained production rates)
– Slip-Form/Fixed-Form Paving Equip(Provide catalog cuts, manufacturer with model # or other description. Indicate # of personnel with experience with equipment)
– Performed Joint Seal Installation Machine (Provide catalog cuts, manufacturer with model # or other description. Indicate # of personnel with experience with equipment)
Sub Factor #3
• Material and Product Compliance Schedule
• Limited to 5 pages (excluding tabs, indexes, resumes)
• Demonstrate an understanding of the materials and products to be provided in a way that provides the Govt confidence that compliance with the plans and specifications will exist.
• Demonstrate an understanding of the requirements of the Plans & Specifications specifically for the following products:
– Portland Cement
– Concrete Aggregates
– Graded Crushed Aggregate Base Course
– Performed Joint Seal
• For all other material the requirements of this section of the proposal may be met in one (1) of two (2) ways:
1. Make a positive statement of intent to provide only products and materials as suggested/recommended in the plans & specs and NOT to provide “or equal” substitutions on separate page labeled “Material & Product Compliance Schedule”
OR
2. Those offerors intending to provide “or-equal” products and materials (not the basis of design) shall submit a section in the technical proposal labeled “Material and Product Compliance Schedule”. By specification section and paragraph list any material/product and the or-equal or substitution you are proposing.
• For any material/product and the or-equal or substitution you are proposing:
– Include pertinent information (not limited to)
– Manufacturer
– Model Number
– Salient Characteristics
– Brief Descriptions
• Do not include:
– Cut sheet, Spec sheets, samples, etc.
Sub Factor #4
• Small Business Participation Plan
• Required of all offerors
• Submit in accordance with instructions provided in Exhibit G
• Use Format provided Exhibit G
• Other than Small Business must also provide
Small Business Subcontracting Plan IAW FAR 52.219-9
Sub Factor #4
• Goals
– Small Business 14%
– Small Disadvantaged Business 5%
– Women Owned Small Business 5%
– Service Disabled Veteran Owned Small Business 0%
– HUBZone Small Business 0%
• Unless requesting HUBZone preference IAW FAR52.219-4 then goal is 50%
– Veteran Owned Small Business 2%
Volume #2 Part II Past/Present Performance Info
• Exhibit A-Part 1 Performance Relevancy Questionnaires
– Use Provided Format -1 Project Per Exhibit A
– Complete not less than 3 not more than 6 forms for relevant contracts complete or substantially completed (70%) in last 5 years.
• Exhibit A-Part 2 Complete One (1)
• Send questionnaires for Exhibit A’s provided or;
• Include FINAL Performance (CCASS) Eval or;
• Include complete PPQ’s not older than 6 months
• Do this early-Must be to Contracting Officer NLT Closing
Date
Volume #2 Part II Past/Present Performance Info
• If you do not have relevant Past Performance and are using experience of key personnel, predecessor companies, or subcontractors to obtain your Past/Present Performance, ensure you clearly state this in the proposal
• To be considered subcontractor must complete a consent form-Exhibit B must be included in your proposal
Submission Requirements
• Section 00110 of the RFP details the required information and format for the proposal
• Two (2) Volumes are required
• Volume #1- One(1) Original Hard Copy & One
(1) CD/DVD Electronic Copy
– Volume 1 MUST also include sealed envelope
• Volume #2- Four (4) CD/DVD Electronic Copies
• DO NOT submit paper copies of Volume #2
Important Reminder
The Government intends to award without discussion and there may not be a chance for discussions, corrections, or revised proposals
Proposal Due Dates
• Proposal Due 1400 Hours (2:00pm) HST on Thursday 15 Aug 2013
• Hard Copy of Volume I must be signed in original by officer of your company
• No facsimile or electronic mail offers
• Send or deliver to: (instructions in Section 00110)
USPFO Hawaii ATTN: CPT Manuel Llanes
91-1179 Enterprise Ave. Bldg. 117 Kapolei, HI 96707
References, PPQ’s, Exhibit C’s
• Reference questionnaires are also due by this time and date
– Send reference questionnaires out as soon as possible
– Return to Contracting Officer via email
Exhibits
• Exhibit A-Performance Relevancy Questionnaire
– Part 1, no less than 3 no more than 6
– Part 2, submit 1
• Exhibit B-Subcontractor/Teaming Partner/Key Personnel Info & Consent Form (if applicable)
• Exhibit C-Reference Questionnaire Package
• Exhibit D-Option Information Form
• Exhibit E-Proposal Inquiry Form
Exhibits (cont.)
• Exhibit F-Forward Pricing Agreement Rates
• Exhibit G- Small Business Participation Plan
• Exhibit H-Evaluated Total Offer Calculation
• Exhibit I- Evaluated Total Offer Calculation
SAMPLE
• Exhibit J- Pre Proposal Meeting Access Form
Exhibit G Small Business Participation Plan
• Follow the format provided
• ALL offerors (both large & small) are required to complete this Exhibit
• Offerors shall propose the level of participation of small business (as a prime or subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area
• Failure to meet any of the specified goals may make this sub factor “Unacceptable” and result in an overall Technical Rating of “Unacceptable”
Exhibit H Evaluated Total Offer Calculation
• Evaluation technique which measures the lowest total overall project cost to the Government will be utilized for this solicitation
• Evaluated Total Offer Method
– Considers the total price of ALL CLINS added to the potential remaining value of a contract, plus Home Office Overhead Rate and subcontractor markup.
Exhibit H Evaluated Total Offer Calculation
• ALL offerors must submit completed Exhibits F and H
• Failure to submit Forward Pricing Schedule
(Exhibit F) and a completed Exhibit H may make the offeror non-compliant with the solicitation requirements
Proposal Evaluation
• Process detailed in RFP Section 00120
• Carefully review Section 00120 when preparing your proposal
• Comply with Section 00100 and 00110 requirements
• Failure to furnish a complete proposal may result in elimination from consideration
Best Value
Best Value is defined as an award based on the greatest overall benefit in response to the requirement.
Award is based on price and other no-cost related factors.
Award
• The offeror whose proposal provides the Best Value to the Govt
• Technical and Past/Present Performance are approximately equal to each other and when combined are approximately equal to the Price Factor.
Important Reminders
• Submit a complete proposal IAW instructions
• Use the formats provided
• Submit Forward Pricing Formats
• Prime Contractors are responsible for coordination among the divisions with subcontractors
• Large Businesses must also submit a Small Business Plan IAW FAR Part 19
Important Reminders
• When using a subcontractor to obtain/enhance relevancy provide subcontractor consent form (Exhibit B) or the information will not be considered
• Award in this process does not necessarily mean the lowest price wins
How Questions Will Be Handled
• Questions must be submitted on Exhibit E via electronic mail to: 127wg.angrckoomb@ang.af.mil and to julianne.cooper.ctr@ang.af.mil
• Submit no later than COB 08 Aug 13
• Questions received after 08 Aug 13 may be held and addressed after RFP closing with those offerors determined to be in the competitive range if discussions are deemed necessary
• Do NOT call technical personnel or AE-this will delay getting an answer mailto:127wg.angrckoomb@ang.af.mil mailto:julianne.cooper.ctr@ang.af.mil
Answers to Questions
• All questions, on a non-attribution basis, and the answers will be posted to the website https://www,fbo.gov
• If necessary Addendums, issued by an Amendment will also be posted
• Check website regularly and don’t forget to REFRESH the web page.
https://www,fbo.gov/
Helpful Websites
• https://www.fbo.gov
• https://www.acqusition.gov/
• https://www.sam.gov/portal/public/SAM/
• http://www.wdol.gov/wdol/scafiles/davisbacon/hi.html https://www.fbo.gov/ https://www.acqusition.gov/ https://www.sam.gov/portal/public/SAM/ http://www.wdol.gov/wdol/scafiles/davisbacon/hi.html
Site Visit Safety Briefing
• Important information to know before we begin our site visit on JBPHH.
QUESTIONS
| AIR NATIONAL GUARD�Pre Proposal Conference��W921J6-13-R-0004 |
| Introductions |
| Synopsis |
| Synopsis |
| Solicitation, Plans & Specs |
| Solicitation, Plans & Specs |
| Solicitation, Plans & Specs |
| Solicitation, Plans & Specs |
| Contract �Period of Performance |
| Disclaimer |
| Volume 1-Cost/Price Info & Pro Forma Documents |
| Volume 1-Cost/Price Info & Pro Forma Documents |
| Volume #2 Part I�Technical Capability Proposal |
| Volume #2 Part I�Technical Capability Proposal |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #1 |
| Volume #2 Part I�Sub Factor #2 |
| Volume #2 Part I�Sub Factor #3 |
| Volume #2 Part I�Sub Factor #3 |
| Volume #2 Part I�Sub Factor #3 |
| Volume #2 Part I�Sub Factor #3 |
| Volume #2 Part I�Sub Factor #3 |
| Volume #2 Part I�Sub Factor #4 |
| Volume #2 Part I�Sub Factor #4 |
| Volume #2 Part II�Past/Present Performance Info |
| Volume #2 Part II�Past/Present Performance Info |
| Submission Requirements |
| Important Reminder |
| Proposal Due Dates |
| References, PPQ’s, Exhibit C’s |
| Exhibits |
| Exhibits (cont.) |
| Exhibit G�Small Business Participation Plan |
| Exhibit H�Evaluated Total Offer Calculation |
| Exhibit H�Evaluated Total Offer Calculation |
| Proposal Evaluation |
| Best Value |
| Award |
| Important Reminders |
| Important Reminders |
| How Questions Will Be Handled |
| Answers to Questions |
| Helpful Websites |
| Site Visit Safety Briefing |
| QUESTIONS |
File details come from the government source that posted it. Updated .