Q A_Dated_08Aug13_0900hrs.pdf

PDF 34 KB Posted

Attached to
TFI-F-22 Combat Aircraft Parking Apron (KNMD069216) and TFI-F-22 Combat Apron Addition (KNMD119001)
Solicitation number
W912J6-13-R-0004
Issued by

View the file

Other files

File Type Posted
Q A_Dated_16Aug13.pdf PDF
Amend__7-W912J613R0004-0007.pdf PDF
Q A_Dated_13Aug13_1130_hrs.pdf PDF
Q A_Dated_13Aug13_1030_hrs.pdf PDF
Q A_Dated_13Aug13_0900_hrs.pdf PDF
W912J613R0004-0006.pdf PDF
BID_SCHEDULE_13AUG13.pdf PDF
Q A_Dated_09Aug13_0900_hrs.pdf PDF
Adden0004-REVISED_Asbestos_Report.pdf PDF
W912J613R0004-0005.pdf PDF
Adden0004-REVISED_LBP_Report.pdf PDF
REVISED_EXHIBIT_F_W912J613R0004.pdf PDF
REVISED_EXHIBIT_H.pdf PDF
Q A_Dated_08Aug13.pdf PDF
Vol_1_KNMD119001_Drawing_G002_ADD_002.pdf PDF
W912J6-13-R-0004-0004.pdf PDF
KNMD119001_SPECS-Add_003.pdf PDF
SPECS-Addendum0002_KNMD119001.pdf PDF
Q A_Dated_05Aug13.pdf PDF
W912J613R0004-0003.pdf PDF
Vol_1_KNMD119001_Drawing-Add_002.pdf PDF
W912J613R0004-0002.pdf PDF
KNMD069216 119001_ASBESTOS_REPORT.pdf PDF
KNMD069216 119001_SOIL_SAMPLING_REPORT.pdf PDF
KNMD069216 119001_LEAD_SCREENING_REPORT.pdf PDF
PrePropMinutes01Aug13-W912J613R0004.pdf PDF
Q A_Dated_02Aug13.pdf PDF
PreProp_Sign_In_Sheet_01Aug13.pdf PDF
Non-disclosure_certificate__contractor.docx DOCX document
Q A_Dated_01Aug13.pdf PDF
W912J613R0004-0001.pdf PDF
Vol_3_AF_DWG_8443128_Sheet_S1-Add-001.pdf PDF
Vol_1_KNMD119001_Drawing-Add_001.pdf PDF
Q A_Dated_31Jul13.pdf PDF
Q A_Dated_26Jul13.pdf PDF
Q A_Dated_16Jul13.pdf PDF
EXHIBIT_H_TEP_Calc_W912J613R0004.docx DOCX document
EXHIBIT_C_W912J613R0004.doc DOC document
EXHIBIT_F_W912J613R0004.docx DOCX document
EXHIBIT_D_and_E__W912J613R0004.doc DOC document
Exhibit_J_W912J613R0004.doc DOC document
Exhibit_I_TEP_SAMPLE_W912J613R0004.docx DOCX document
EXHIBIT_G_-SB_Participation_Plan_W912J613R0004.docx DOCX document
W912J613R0004.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO:

SOLICITATION W912J6-13-R-0004

Dated 08 Aug 13 0900 hrs Local Hawaiian Standard Time

**IMPORTANT REMINDER THAT ALL QUESTIONS ARE DUE NO LATER

THAN 12 NOON LOCAL HST FIVE (5) WORKING DAYS PRIOR TO CLOSING

DATE (Section 00100 Para 3.3)**

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload”

Dated 16 Jul 13

Q1. How do I access the files/documents for the Project?

A1. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation.

Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@.dla.mil.

Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2015.

A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.

Dated 26 Jul 13

Q3. Would the Government consider a micropile foundation solution for this project?

A3. A micorpile foundation solution is currently under consideration. Addendum to be forthcoming.

Dated 31 Jul 13

Q4. Spec section 03 30 04.00 2.1.2 (Aggregates), Spec Spection 32 13 11 2.2.1.1.a (Alkai-Silica Rectivty) & Section 00110 - Technical Proposal Requirements 3.4.2.3.2.

mailto:jcp-admin@.dla.mil

Please reconsider the testing requirement ASTM C1260 and replace with ASTM C1293 “Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction” and ASTM C227 “Standard Test Method for Potential Alkali Reactivity of Cement-Aggregate Combinations (Mortar-Bar Method)”. On several recent NavFac projects these alternate tests have been accepted.

A4. No, this replacement is not acceptable. Offeror must provide per the specifications as issued.

Q5. Section 00110 – Technical Proposal Requirements 3.4.2.3.3 – Resume for Safety Manager/Represenative. Please advise if you want a resume for the Site Safety Health Office who will be on-site or the Corporate Safety Manager who will appoint the Site Safety Health Officer.

A5. Provide resume for Safety Officer who will be on the project site.

Q6. Section 00110 – Volume 2 Part 2 Past Performance 3.4.3.10. Due to the larger number of requests that are made for Past Performance Questinnaires can we submit previously completed PPQ’s where the form is the same of similar to Exhibit C?

A6. Yes previously completed PPQ’s may be submitted as long as the PPQ is dated and completed within the previous six (6) months. If providing a previously completed PPQ, include the form directly behind the Exhibit A it applies to. Additionally, “Final” Perfromance Ealuation (Construction) (aslo referred to as CCASS Evaluation) issued for a project may be included in lieu of sending out reference package for the project. If provided include the form directly behind the Exhibit A it applies to.

Dated 01 Aug 13

Q7. According to Section 00110-2.2 it states Contractors will need to execute a disclosure agreement with pertinent language required to be included. Is this a disclosure agreement that is supplied by the Government or should the language be included in the verbiage of the standard proposal? If so where would the Government prefer the language to be seen?

A7. In accordance with Section 00110 Paragraph 2.2, offerors must contact the companies listed in Paragraph 2.1 to effect execution of a disclosure agreement. If your firm has a standard or corporate disclosure agreement that it utilizes your firm may choose to request execution of that document. A sample agreement has been posted with the Q&A document dated 01 Aug 13 for those firms that wish to execute an agreement but do not have a corporate or standard agreement. Copies of the executed agreement should be included as attachments in Volume 1 of your proposal.

Dated 05 Aug 13

Q8. There is a Gravity Oil Water Separator specification (44 42 53) but the device location is not indicated on the drawings. Please clarify.

REVISED A8. The Oil Water Separator has been eliminated. Offerors shall disregard Specification Section 44 42 53 for the Gravity Oil-Water Separator. REVISED 08 Aug 13 0900 hrs. The Oil Water Separator has been eliminated. Offerors shall disregard Specification Section 44 42 53 for the Gravity Oil-Water Separator. See Section 22 99 99.00 50 - CLEAR WATER RINSE SYSTEM - for the Oil/Water Separator requirements associated with Clearwater Rinse System.

Dated 08 Aug 13

Q9. According to drawing P-101, we can not find the spec for the 5,000 gallon capture tank or the pumps. Can you advise us where it is at?

A9. See Specification Section 22 99 99.00 50 - CLEAR WATER RINSE SYSTEM; PART 2 –

PRODUCTS.

Q10. Drawing P-101 which calls for a 2,000 gallon oil-water separator which discharges into a 5,000 gallon Capture Tank and Written specification Section 44 42 53 (dated 07/15/13) for a Gravity Oil- Water Separator for TFI-F-22 Combat Aircraft Parking Apron & TFI-F-22 Combat Apron Addition which calls for an oil-water separator designed for a maximum flow of 325 litter per second (4,300 gpm) to treat oil-in-water mixtures originating from aircraft fueling operations. Can you tell which of these oil-water separators will be required?

A10. An oil-water separator is required as part of the clear water rinse equipment as shown on Drawing Sheet No. P-101; this oil-water separator is addressed under Technical Specification Section 22 99 99.00

50. See also the answer to Q8.

Q11. "Written specification Section 44 42 53 (dated 07/15/13) for a Gravity Oil-Water Separator for the above project for an oil-water separator, designed for a maximum flow of 325 litter per second (or 4,300 gpm) to treat oil-in-water mixtures originating from aircraft fueling operations. But the spec lists a PSC-3000-DW-J which is a 3000 gallon size. But the spec also says to meet the 325 liter per second per, which is a 30,000 gallon size. Is the written spec a typo? And should it be a PSC- 30000-DW-J and not a PSC-3000-DW-J?" And it is a part of this project bidding and NOT the Hush House project?

A11. See the answer for Q8.

Q12. ELEVATION of AGGREGATE LAYER AT LOW WALL STRUCTURE : Attempting to determine the elevation of the 1’-0” thick Aggregate layer depicted in sections 1,2,3 & 4 on drawing S-202 and again in detail 2 on S-203, we learn that the aggregate layer is at 0’-0” T/ Finish Floor and from Note 13 on S-102 that the Finish Floor = 7.44 ‘ MSL, which is consistent with the elevation shown on drawing CG-101. Using the T/WALL elevations called out in details 1 on S-202 we learn that the top of wall at the high walls at the rear of the “tunnel” is at 21’-9 ¼” and based on the T/WALL elevation for the LOW WALLS in detail 2 on S-203 we determine the elevation of the top of the low wall is 9’-1 ¼”. Details 2 on S-202 and 2 on S-203 depict low wall backfill to exceed the low wall height by several feet. The Grading Plans CG-402 and CG-101 both show the final grades at the low wall to be at approximately elevation 5.0 ft. Backfill Notes on detail 2 S-202 say the backfill at the low wall should be 5’-0” typical. Please clarify the requirements for the Final Grades at the LOW WALL section of the HUSH HOUSE Tunnel

A12. PENDING

Q13. Section 22 99 99.0 50 (Clear Water Rinse System), Part 1.2A states "The clear water rinse system shall be provided as part of the Base Bid." Is to be part of the Base Bid or is include in Option 1?

A13. The Clear Water Rinse System is to be provided as part of Option 1 and not part of the Base Bid.

Q14. TRENCH OVEREXCAVATION : Please clarify Typical Waterline Trench Detail 4 CU-502 and Concrete Jacket Detail 3 CU-502. Both details call for 18” to 24” of over-excavation below the pipe bedding or duct bank and require a gravel layer wrapped in geo-textile fabric. The soils report states the gravel stabilization layer under the pipe bedding would only be necessary in areas of “soft or loose soils “ ( see 3.8 on page 23).

A14. PENDING

Q15. IW Piping at HUSH HOUSE : Please clarify the requirements to install the Industrial Waste piping under the Hush House Slab as shown on drawing C1 in Volume 3.

A15. PENDING

Q16. SG RECEPTACLES at HUSH HOUSE : Please clarify the requirements to install static ground receptacles . Drawing E-101( Volume 1) is in general accordance with Drawing C-1 ( Volume 3) but C-1 shows an additional receptacle in the PCC next to the Fuel Trailer Pad.

A16. PENDING

Q17. DOOR HEATER Rough IN at HUSH HOUSE :Volume Three drawings show a door heater requirement in detail A on C-2. Please clarify if the door heater is required for this contract.

A17. PENDING

Q18. CU Pipe under HUSH HOUSE SLAB :Volume Three drawings show a copper piping arrangement in detail 4 on drawing C-2. This water piping is not depicted on the Hush House plan C-1 in volume 3 or in the volume 1 drawings. Is this copper water piping ?

A18. PENDING

Q19. OPTION 8 GRADING PLAN : If the detention basin option # 8 is accepted , grading plans CG- 101 and CG-102 will be incorrect as they depict the base bid condition without the detention basin.

Drawing CG-403-O and CG-404-O are also incorrect as the detention basin option 8 (see drawing CG-407 ) is not incorporated. According to drawing CG-407 a mound would be built up above the detention basin.

A19. PENDING