Adden0004-REVISED_Asbestos_Report.pdf

PDF 68 KB Posted

Attached to
TFI-F-22 Combat Aircraft Parking Apron (KNMD069216) and TFI-F-22 Combat Apron Addition (KNMD119001)
Solicitation number
W912J6-13-R-0004
Issued by

About this file

REVISED-Addendum 0004-Asbestos Report 09Aug13

View the file

Other files

File Type Posted
Q A_Dated_16Aug13.pdf PDF
Amend__7-W912J613R0004-0007.pdf PDF
Q A_Dated_13Aug13_1130_hrs.pdf PDF
Q A_Dated_13Aug13_1030_hrs.pdf PDF
Q A_Dated_13Aug13_0900_hrs.pdf PDF
W912J613R0004-0006.pdf PDF
BID_SCHEDULE_13AUG13.pdf PDF
Q A_Dated_09Aug13_0900_hrs.pdf PDF
W912J613R0004-0005.pdf PDF
Adden0004-REVISED_LBP_Report.pdf PDF
REVISED_EXHIBIT_F_W912J613R0004.pdf PDF
REVISED_EXHIBIT_H.pdf PDF
Q A_Dated_08Aug13_0900hrs.pdf PDF
Q A_Dated_08Aug13.pdf PDF
Vol_1_KNMD119001_Drawing_G002_ADD_002.pdf PDF
W912J6-13-R-0004-0004.pdf PDF
KNMD119001_SPECS-Add_003.pdf PDF
SPECS-Addendum0002_KNMD119001.pdf PDF
Q A_Dated_05Aug13.pdf PDF
W912J613R0004-0003.pdf PDF
Vol_1_KNMD119001_Drawing-Add_002.pdf PDF
W912J613R0004-0002.pdf PDF
KNMD069216 119001_ASBESTOS_REPORT.pdf PDF
KNMD069216 119001_SOIL_SAMPLING_REPORT.pdf PDF
KNMD069216 119001_LEAD_SCREENING_REPORT.pdf PDF
PrePropMinutes01Aug13-W912J613R0004.pdf PDF
Q A_Dated_02Aug13.pdf PDF
PreProp_Sign_In_Sheet_01Aug13.pdf PDF
Non-disclosure_certificate__contractor.docx DOCX document
Q A_Dated_01Aug13.pdf PDF
W912J613R0004-0001.pdf PDF
Vol_3_AF_DWG_8443128_Sheet_S1-Add-001.pdf PDF
Vol_1_KNMD119001_Drawing-Add_001.pdf PDF
Q A_Dated_31Jul13.pdf PDF
Q A_Dated_26Jul13.pdf PDF
Q A_Dated_16Jul13.pdf PDF
EXHIBIT_H_TEP_Calc_W912J613R0004.docx DOCX document
EXHIBIT_C_W912J613R0004.doc DOC document
EXHIBIT_F_W912J613R0004.docx DOCX document
EXHIBIT_D_and_E__W912J613R0004.doc DOC document
Exhibit_J_W912J613R0004.doc DOC document
Exhibit_I_TEP_SAMPLE_W912J613R0004.docx DOCX document
EXHIBIT_G_-SB_Participation_Plan_W912J613R0004.docx DOCX document
W912J613R0004.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Report REVISED ADDENDUM 0004 09 Aug 13 JBPHH Munitions Complex

REVISED ADDENDUM 0004 09 Aug 13

REVISED Table 2: Potential Asbestos-Containing Materials, Building 3041, 3042, and 3044, Joint Base Pearl Harbor Hickam, Hawaii

Material Color/Description Cond. Bldg. Interior/Exterior Location Est Amount of Material

Friability

2’x4’ Ceiling Tile White Fair 3044 Interior Office 1500 ft2 Friable Cove Base Brown Fair 3044 Interior Office 400 linear ft Non-friable 12”x12” Vinyl Floor Tile

Beige Fair 3044 Interior Office 1000 ft2 Non-friable

Cove Base Grey Fair 3044 Interior Office 150 linear ft Non-friable Sink Insulation Grey Fair 3044 Interior Office 4 ft2 Non-friable Gasket on Pipe Black Fair 3044 Interior Office, Bay 4 4 ft2 Non-friable Ceramic Tile Beige Fair 3044 Interior Office-Men’s and Women’s

RR

250 ft2 Non-friable

Toilet Sealant White Fair 3044 Interior Office-Men’s and Women’s

RR

10 linear ft Non-friable

Sink Sealant White Fair 3044 Interior Office-Men’s and Women’s

RR

8 linear ft Non-friable

Sheetrock Walls/Ceiling

Painted Various Fair 3044 Interior Office 1500 ft2 Friable

Door Sealant Various Fair 3044 Exterior Throughout Building

100 linear ft Non-friable

Door Sealant Various Fair 3044 Interior Throughout Building

500 linear ft Non-friable

Roll-up Door Sealant Beige Fair 3044 Exterior Bay 3, Bay 2, Bay 1

250 linear ft Non-friable

Concrete Wall Skim Coat

Beige Painted Fair 3044 Exterior Throughout Building

2500 ft2 Non-friable

Air Handling Unit Insulation

Silver Paper Fair 3044 Interior/Exterior Throughout Building

250 ft2 Non-friable

Various Roofing Material

Various Unknown 3044 Exterior Upper Roof Unknown Non-friable

Ceiling Insulation White Fair 3044 Interior Compressor Room

300 ft2 Friable

Ceiling Sealant Grey/White Poor 3042 Interior Throughout Building

1000 ft2 Non-friable

Floor Caulking Material

Black Fair 3042 Interior Throughout Building

250 linear ft Non-friable

Floor Caulking Material

White Fair 3042 Interior Throughout Building

260 linear ft Non-friable

Vibration Cloth on Fan

Black Fair 3042 Interior South Side of Building

20 ft2 Non-friable

Ceiling Sealant Grey/White Poor 3041 Interior Throughout Building

1000 ft2 Non-friable

Floor Caulking Material

Black Fair 3041 Interior Throughout Building

250 linear ft Non-friable

Floor Caulking Material

White Fair 3041 Interior Throughout Building

260 linear ft Non-friable

Vibration Cloth on Fan

Black Fair 3041 Interior South Side of Building

20 ft2 Non-friable

Floor Caulking Material on Metal Access Panel

Grey Fair 3041 Exterior North Side of Building

10 linear ft Non-friable

4 RECOMMENDATIONS

In summary, various materials with the potential to contain asbestos were observed in the areas inspected. Of the materials sampled no asbestos content was detected above the regulatory limit of 1%. Based on visual inspection of the Subject Location, the following is offered:

TABLE 1

• Per the sampling results provided, contractor is to assume all materials reported in Table 1 to not contain levels of asbestos above the regulatory limit of 1%.

TABLE 2 NON-FRIABLE

• With the exception of the three (3) materials identified as friable and the potential for ACM, all other materials identified in Table 2 as non-friable shall be removed and disposed of in such a manner by the contractor as to not make the material friable. The removal and disposal shall be IAW HAR 11501-7(c) of all non-friable material shall be included in the price proposal. Costs shall be included in the Base Bid.

• In accordance with the State of Hawaii regulation, HAR 11-501-7(c):Regulated ACM (RACM) [which includes Class I and II non-friable ACM] need not be removed before demolition if: (A) it is category I non-friable ACM that is not in poor condition and is not friable; (B) is on a facility component that is encased in concrete or other similarly hard material and is adequately wet whenever exposed during demolition; it was not accessible for testing and was, therefore, not discovered until after demolition began and, as a result of the demolition, the material cannot be safely removed (C) it is category II non-friable ACM and the probability is low that the materials will become crumbled, pulverized, or reduced to powder during demolition.

• In the event that the contractor’s means and methods cause non-friable material to become friable during demolition activities, the removal and disposal of said materials shall be by a qualified firm (if non-friable material is determined by the contractor to be ACM then removal and disposal of said materials shall be by a qualified ACM abetment firm) and at the expense of the contractor. This expense will not be considered an unforeseen condition or change by the Government.

• Per the information provided in Table 2. The Contractor will conduct sampling and analysis of the three suspected asbestos materials identified in Table 2 as friable prior to demolition activities that may disturb these materials to determine the actual presence of asbestos above the regulatory limit of 1%. Offerors shall accomplish sampling and analysis of the identified friable materials contained in this table and therefore shall include costs for sampling and analysis of these materials in their price proposal. Costs shall be included in the Base Bid.

TABLE 2 FRIABLE.

• If friable ACM is identified after sampling and analysis it must be removed and disposed of by a qualified asbestos abatement contractor. Friable ACM is defined as those materials that may be crumbled, pulverized, or otherwise damaged by hand pressure.

• Any of the friable materials confirmed by the sampling and analysis results to contain asbestos materials above the regulatory limit of 1% will be abated and disposed of according to the Forward Pricing Agreement proposed by the contractor and incorporated into the contract at time of award. See Exhibits F and H.

• In the event the friable materials are determined to not contain ACM by the contractor’s performance of required sampling and analysis, the Contractor shall accomplish removal and disposal of said materials as part of the Base Bid contract. Costs shall be included in the Base Bid.

• The services of a qualified consultant shall be obtained to monitor and inspect the removal activities to ensure compliance with applicable Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and Hawaii Occupational Safety and Health (HIOSH) regulations pertaining to the handling of asbestos containing material.

• Any abatement and demolition contractor(s) must take appropriate measures to comply with applicable EPA, OSHA, HIOSH regulations pertaining to the handling of asbestos containing materials and worker protection.

• Have air monitoring conducted for airborne asbestos fibers by a State of Hawaii certified Project Monitor during any asbestos abatement and general renovation/demolition activities of areas that were determined to contain this contaminant.