Revised Bid Schedule page 5 of 79.pdf

PDF 562 KB Posted

Attached to
Veterans Affairs, Parking Expansion, Columbia, SC
Solicitation number
W912HP21R4003
Issued by

About this file

This document contains a bid schedule and explanation of bid items for a federal construction contract opportunity for the Veterans Affairs Parking Expansion project in Columbia, South Carolina. The bid schedule outlines six items including the base bid for general construction and alterations to construct a new parking garage structure with elevators, stairs, and other items. It also includes five option items such as additional stops to an elevator, additional landscape design, and an extended contract completion period. Bids are due by 2pm EST on May 3, 2021. The contract is available through the Department of the Army Corps of Engineers Engineering District Charleston.

View the file

Other files

File Type Posted
D.03 Award Notice 21C4000 8.30.21.pdf PDF
B.08 Memorandum Amendment 0005 21R4003 5.20.21.pdf PDF
B.08 Amendment 0005 21R4003 5.20.21.pdf PDF
A.02 Amendment 0005 09 54 23 - Linear Metal Ceilings 21R4003 5.20.21.pdf PDF
B.08 Memorandum Amendment Four 21R4003 5.13.21.pdf PDF
07 24 00 - Exterior Insulation and Finish Systems.pdf PDF
00 01 10 - TOC.pdf PDF
2021-04-19 - Structural Revised Sheets.pdf PDF
2021-04-19 - General and Architectural Revised Sheets.pdf PDF
00 01 15 - List of Drawings.pdf PDF
B.08 Amendment Four 21R4003 5.13.21.pdf PDF
07_84_00_-_Firestopping..pdf PDF
AE601 Signage Schedule Stripping and Details.pdf PDF
Rev 4 SB101 - FOUNDATION PLAN.pdf PDF
2017.1058.02 - 21.04.23-VA COLUMBIA - GARAGE ADDITION - Revision 2 (002).pdf PDF
Parking Garage Project Device and Conduit Plan.pdf PDF
B.08 Final Amendment Three 21R4003 5.6.21.pdf PDF
B.08 Amendment Two 21R4003 4.29.21.pdf PDF
B.08 Amendment One 21R4003 4.21.21.pdf PDF
A.02 Amendment One Attachement Spec Revision 21R4003 4.21.21.pdf PDF
B.08 Site Visit Sign In Sheet 21R4003 4.21.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.xlsx XLSX spreadsheet
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL II 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL I with Div1 Rev 021021 4.1.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.txt TXT text file
B.08 VA Columbia Parking Expansion Solicitation 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA CD DRAWINGS Revised 21R4003 4.1.21.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912HP21R4003

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Job OPTION Stop ElevatorFFP

ADD 4 STOP ELEVATOR IN STAIR TOWER 1 WHICH IS LOCATED

BETWEEN GRID LINES 6 AND 8. THIS INCLUDES ALL NECESSARY

APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING,

DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY

SYSTEMS, SIGNAGE AND WAYFINDING, HAND AND GUARDS RAILS)

TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE

BID PLUS ADD ALTERNATE A, B AND C GARAGE AREA IS SHOWN

ON THE SHEET FOR CONTINUITY AND CONNECTION

UNDERSTANDING ONLY. SEE ALT. AS SHOWN ON SHEETS (SF301,

AE152, MM104, PP105CD, EA104CD) AND ALL ASSOCIATED DETAILS.

CONTRACT TIME SHALL BE 28 CALENDAR DAYS FOR THIS

ALTERNATE.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Job

OPTION FFP

ADDITIONAL LANDSCAPE DESIGN AS SHOWN ON SHEET LP102 AND

ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 7

CALENDAR DAYS FOR THIS ALTERNATE

FOB: Destination

NET AMT

EXPLANATION OF BID ITEMS

BASE BID(0001) WORK INCLUDES NECESSARY REMOVAL OF EXISTING STRUCTURE AND APPURTENANCES FOR GENERAL CONSTRUCTION, ALTERATIONS, ROADS, WALKS, GRADING, DRAINAGE, LABOR, MATERIAL, AND EQUIPMENT TO CONSTRUCT THE GARAGE STRUCTURE, ELECTRICAL AND IT EXTENSIONS, ELEVATORS, STAIRS, SIGNAGE AND CERTAIN OTHER ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL HAVE 90 CALENDAR DAYS FROM THE CONSTRUCTION NOTICE TO PROCEED TO SUBMIT AND RECEIVE APPROVALS OF ALL SUBMITTALS. ONCE APPROVALS ARE OBTAINED, THE CONTRACTOR WILL HAVE 120 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION. ONCE THE VERTICAL EXPANSION IS COMPLETED, THE CONTRACTOR WILL HAVE 180 CALENDAR DAYS TO COMPLETE THE HORIZONTAL EXPANSION AND ALL REMAINING WORK. SEE GI106,