This document is an amendment to a solicitation for expansion of parking facilities at the Veterans Affairs Medical Center in Columbia, South Carolina. The amendment extends the response due date from May 17, 2021 to May 21, 2021 at 2:00 PM EST. It also replaces certain architectural and structural drawings to address structural issues in the parking garage design. The amendment further modifies the solicitation language regarding the provision of utilities, requiring the contractor to obtain electricity from the local public utility rather than the Government. Potable water will be the only utility provided without charge from existing on-site sources.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Closing Date has been Extended.
Please see SF 30, Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP21R4003
X 9B. DATED (SEE ITEM 11)
01-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2021
CODE
PROGRAMS & PROJECT MGMT DIV
69-A HAGOOD AVENUE
CHARLESTON SC 29403-5107
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP21R4003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 4 CHANGES
The purpose of this amendment is to incorporate the following attachments to this solicitation:
00 01 10 TOC
00 01 15 List of Drawings 07 24 00 Exterior Insulation and Finish Systems 2021-04-19 General and Revised Architectural Sheets 2021-04-19 Structural Revised Sheets
1. The original drawings issued indicated a column and other precast elements at the 4th level of the parking garage stair and elevator lobby which cannot be constructed as shown, as there is not adequate bearing capacity in the double tees. The SW column will be removed, and walls which must bear on the slab will be changed from precast to CMU. Other lightweight materials e.g. steel and CMU will be used to enclose the lobby.
DELETE the following:
Drawing AE105 dated 3/26/2021 Drawing GI000 dated 3/26/2021 Drawing AE301 dated 3/26/2021 Drawing AE401 dated 3/26/2021 Drawing AE403 dated 3/26/2021 Drawing SF104 dated 12/09/2020 Drawing SF104A dated 12/09/2020 Drawing SF303 dated 12/09/2020 Drawing SF401 dated 12/09/2020 Drawing SF504 dated 12/09/2020
REPLACE with:
Drawing AE105 Rev 1 dated 4/19/2021 Drawing GI000 Rev 1 dated 4/19/2021 Drawing AE301 Rev 1 dated 4/19/2021 Drawing AE401 Rev 1 dated 4/19/2021 Drawing AE403 Rev 1 dated 4/19/2021 Drawing SF104 Rev 1 dated 4/19/2021 Drawing SF104A Rev 1 dated 4/19/2021 Drawing SF303 Rev 1 dated 4/19/2021 Drawing SF401 Rev 1 dated 4/19/2021 Drawing SF504 Rev 1 dated 4/19/2021
2. Change to Spec’s concerning Government provision of Utilities:
SUMMARY OF CHANGES
1) SECTION 01 00 00 GENERAL REQUIREMENTS, Paragraph 1.20
“1.20 AVAILALIBITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold.
Useof open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
D. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system.
E. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR’s discretion) of use of water from Medical Center's system.
F. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the Contractor at Contractor's expense.”
REPLACE with:
“1.20 NOT USED”
2) SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITES AND CONTROLS, Paragraph 3.2.2
“3.2.2 Payment for Utility Services
a. The Government will make all reasonably required utilities available from existing outlets and supplies, as specified in the Contract. Unless otherwise provided in the Contract, the amount of each utility service consumed will be charged to or paid at prevailing rates charged to the
Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. Carefully conserve utilities furnished without charge.
b. Reasonable amounts of the following utilities will be made available without charge.
- Electricity
- Potable Water
- Sanitary Sewer
c. The point at which the Government will deliver such utilities or services and the quantity available is must be coordinated with the Contracting Officer. Pay all costs incurred in connecting, converting, and transferring the utilities to the work. Make connections, including providing backflow-preventing devices on connections to domestic water lines; and providing transformers; and make disconnections.”
REPLACE with:
“3.2.2 Payment for Utility Services
a. The Government will make all reasonably required utilities available from existing outlets and supplies, as specified in the Contract. Carefully conserve utilities furnished without charge.
b. Reasonable amounts of the following utilities will be made available without charge:
- Potable Water
c. The point at which the Government will allow the contractor to access such utilities or services and the quantity available must be coordinated with the Contracting Officer. Pay all costs incurred in connecting, converting, and transferring the utilities to the work. Make connections, including providing backflow-preventing devices on connections to domestic water lines; providing meters;
providing transformers; and make disconnections.
d. The Contractor must obtain Electricity from the Public Utility as required for construction.
Temporary power is not available from existing sources on site. Sewer may be used where available.
Where not available, holding tanks must be used with overflow protections and regular dumping schedules.”
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 17-May-2021 02:00 PM to 21-May-2021 02:00 PM.
(End of Summary of Changes)