07 24 00 - Exterior Insulation and Finish Systems.pdf

PDF 70 KB Posted

Attached to
Veterans Affairs, Parking Expansion, Columbia, SC
Solicitation number
W912HP21R4003
Issued by

About this file

This document provides specifications for an exterior insulation and finish system for a parking expansion project at the Veterans Affairs Medical Center in Columbia, South Carolina. The specifications cover required products and installation methods for the insulation, adhesive, reinforcing fabric, base coat, and finish coat. Proposals are due no later than May 3, 2021 for the project being solicited by the Department of the Army Corps of Engineers Engineering District Charleston under solicitation number W912HP21R4003. Basis of design is noted as Stotherm CI XPS Classic or equal. Performance requirements include surface burning characteristics, impact resistance, structural performance, water penetration resistance, abrasion resistance, accelerated weathering resistance, and salt spray resistance.

View the file

Other files

File Type Posted
D.03 Award Notice 21C4000 8.30.21.pdf PDF
B.08 Memorandum Amendment 0005 21R4003 5.20.21.pdf PDF
B.08 Amendment 0005 21R4003 5.20.21.pdf PDF
A.02 Amendment 0005 09 54 23 - Linear Metal Ceilings 21R4003 5.20.21.pdf PDF
B.08 Memorandum Amendment Four 21R4003 5.13.21.pdf PDF
00 01 10 - TOC.pdf PDF
2021-04-19 - Structural Revised Sheets.pdf PDF
2021-04-19 - General and Architectural Revised Sheets.pdf PDF
00 01 15 - List of Drawings.pdf PDF
B.08 Amendment Four 21R4003 5.13.21.pdf PDF
07_84_00_-_Firestopping..pdf PDF
AE601 Signage Schedule Stripping and Details.pdf PDF
Rev 4 SB101 - FOUNDATION PLAN.pdf PDF
Revised Bid Schedule page 5 of 79.pdf PDF
2017.1058.02 - 21.04.23-VA COLUMBIA - GARAGE ADDITION - Revision 2 (002).pdf PDF
Parking Garage Project Device and Conduit Plan.pdf PDF
B.08 Final Amendment Three 21R4003 5.6.21.pdf PDF
B.08 Amendment Two 21R4003 4.29.21.pdf PDF
B.08 Amendment One 21R4003 4.21.21.pdf PDF
A.02 Amendment One Attachement Spec Revision 21R4003 4.21.21.pdf PDF
B.08 Site Visit Sign In Sheet 21R4003 4.21.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.xlsx XLSX spreadsheet
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL II 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL I with Div1 Rev 021021 4.1.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.txt TXT text file
B.08 VA Columbia Parking Expansion Solicitation 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA CD DRAWINGS Revised 21R4003 4.1.21.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Columbia VAMC –Correct Parking Site Deficiencies 04-19-2021

Columbia, SC Construction Documents

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 1

SECTION 07 24 00

EXTERIOR INSULATION AND FINISH SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Exterior insulation and finish systems (EIFS).

1.2 RELATED WORK

A. Section 09 06 00, SCHEDULE FOR FINISHES Color.

B. Section 09 29 00, GYPSUM SHEATHING: Gypsum Board Sheathing.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standards Institute (ANSI):

A108/A118/A136-19 ......Installation of Ceramic Tile.

A137.1-19 ..............Ceramic Tile - Version 1.

C. ASTM International (ASTM):

B117-19 ................Operating Salt Spray (Fog) Apparatus.

C67/C67M-20 ............Sampling and Testing Brick and Structural Clay

Tile.

C177-19 ................Steady-State Heat Flux Measurements and Thermal

Transmission Properties by Means of the

Guarded-Hot-Plate Apparatus.

C297/C297M-16 ..........Flatwise Tensile Strength of Sandwich

Constructions.

C578-19 ................Rigid, Cellular Polystyrene Thermal Insulation.

C666/C666M-15 ..........Resistance of Concrete to Rapid Freezing and

Thawing.

C920-18 ................Elastomeric Joint Sealants.

D968-17 ................Abrasion Resistance of Organic Coatings by

Falling Abrasive.

D2794-93(2019) .........Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact).

E84-20 .................Surface Burning Characteristics of Building

Materials.

E96/E96M-16 ............Water Vapor Transmission of Materials.

E119-20 ................Fire Tests of Building Construction and

Materials.

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 2

E330/E330M-14 ..........Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform

Static Air Pressure Difference.

E331-00(2016) ..........Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Wall by Uniform

Static Air Pressure Differences.

E2486/E2486M-13(2018) ..Impact Resistance of Class PB and PI Exterior

Insulation and Finish Systems (EIFS).

G90-17 .................Performing Accelerated Outdoor Weathering of

Nonmetallic Materials Using Concentrated

Natural Sunlight.

1.4 PREINSTALLATION MEETINGS

A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

a. Contracting Officer's Representative.

b. Architect/Engineer.

c. Inspection and Testing Agency.

d. Contractor.

e. Installer.

f. Manufacturer's field representative.

g. Other installers responsible for adjacent and intersecting work, including air barriers and sealants.

2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Installation schedule.

b. Installation sequence.

c. Preparatory work.

d. Protection before, during, and after installation.

e. Installation.

f. Terminations.

g. Transitions and connections to other work.

h. Inspecting and testing.

i. Other items affecting successful completion.

3. Document and distribute meeting minutes to participants to record decisions affecting installation.

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 3

1.5 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and fabrication and installation details.

2. Show details for corner treatment, sills, soffits, dentils, quoins, lintels, openings, penetrations, flashing, and other special applications.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

3. Warranty.

D. Samples: Two 300 mm (1 foot) square samples of EIFS finishes over cement board identical to proposed installation in thickness, color, texture and workmanship.

E. Test reports: Certify each product and complete system complies with specifications.

F. Qualifications: Substantiate qualifications comply with specifications.

1. Installer with project experience list.

1.6 QUALITY ASSURANCE

A. Installer Qualifications:

1. Regularly installs specified products.

2. Installed specified products with satisfactory service on five similar installations for minimum five years.

a. Project Experience List: Provide contact names and addresses for completed projects.

1.7 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.8 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight conditioned facility.

B. Protect products from damage during handling and construction operations.

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 4

1.9 FIELD CONDITIONS

A. Environment: Unless greater temperature is required by system manufacturer, install products only when ambient air temperature is minimum 7 degrees C (45 degrees F) and rising and predicted to persist for 24 hours after installation.

1.10 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant EIFS system materials against material and manufacturing defects.

1. Warranty Period: 10 years.

PART 2 - PRODUCTS

2.1 PRODUCTS - GENERAL

A. Basis of Design: Stotherm CI XPS Classic or equal.

B. Provide system components from one manufacturer and from one production run.

2.2 EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)

A. Description: Polymer-Based (PB) system consists of Type I molded rigid polystyrene insulation adhered to sheathing and finished with glass-fiber-mesh reinforced based-coat and textured finish coat.

B. Performance Requirements:

1. Surface Burning Characteristics: When tested according to ASTM E84.

a. Flame Spread Rating: 25 maximum.

b. Smoke Developed Rating: 450 maximum.

2. Full Scale Wall Fire Test: No significant surface flaming or propagation of vertical or lateral flames when tested according to

ASTM E119.

3. Impact Resistance (Sample to be cured. Finish, base coat and fabric over 25 mm (1 inch) insulation typical of project application), ASTM E2486/E2486M:

a. High Impact Resistance - 10.2 to 17J (90-150 inch-lbs.).

4. Structural Performance: (Test panels 1200 mm x 1200 mm (4 feet by

4 feet) typical of project application): ASTM E330/E330M, no permanent deformation, delamination or deterioration for positive and negative pressures as required.

a. Wind Loads: Uniform pressure as indicated on Drawings.

5. Water Penetration: ASTM E331, no water penetration minimum 720Pa (15 psf) for windows and 300 Pa (6.24 psf) for curtain wall assembly.

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 5

6. Abrasion Resistance: ASTM D968, 500 liters of sand with slight smoothing and no loss of film integrity.

7. Accelerated Weathering: ASTM G90; 2000 hours with no deterioration.

8. Salt Spray Resistance: ASTM B117; Withstand 300 hours with no deleterious effects.

9. Water Vapor: ASTM E96/E96M; Maximum 12 grains/hour/square meter (18 grains/hour/square foot.).

10. Absorption-Freeze-Thaw (Pre-weighed 100 mm x 200 mm (4 inch by

8 inch) specimens; 25 mm (1 inch) insulation, faced with finish coat cured and stored in air; tested with edges and back open), ASTM C67.

a. 50 Cycles: 20 hours at 9 degrees C (4 degrees F); 4-hour thaw in water.

b. After 50 cycles; total weight gain of maximum 6.2 grams. No checking splitting, or cracking.

C. Adhesive: Manufacturers standard product including primer compatible with sheathing.

D. Insulation:

1. Thermal Resistance: Thermal resistance (R-value), as indicated, measured by ASTM C177.

2. Insulating Material: ASTM C578, as recommended by EIFS manufacturer and treated to be compatible with EIFS components. Age insulation minimum of 6 weeks before installation.

3. Provide Type I Molded Expanded Polystyrene (MEPS) insulation board for Type PB systems, in sizes as required except maximum 600 mm X

1200 mm (24 X 48 inches) boards, and maximum 100 mm (4 inches) thick.

E. Mechanical Anchors: As recommended by EIFS manufacturer.

F. Accessories:

1. Trim, control joints, weep screed, edging, anchors, expansion joints, and other items required for proper installation as recommended by EIFS manufacturer.

2. Metal Items and Fasteners: Corrosion resistant.

G. Reinforcing Fabric: Balanced, open weave, glass fiber fabric made from twisted multi-end strands specifically treated for compatibility with the other materials of system.

1. Minimum weight 100 grams/square meter (4.3 ounces/square yard).

H. Base Coat: Manufacturer's standard.

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 6

I. Finish Coat: Manufacturer's standard. Minimum thickness 1.5 mm

(1/16 inch), complying with performance requirements.

J. Sealant: ASTM C920; Class 50 with 100 percent recovery. Type, grade and use as recommended by sealant manufacturer.

1. When required, provide non-staining primer, bond breaker, and backer rods as recommended by sealant manufacturer.

2. Do not use absorptive materials as backer rods.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

C. Notify Contracting Officer's Representative in writing of conditions detrimental to proper completion of work.

D. Do not proceed with work until unsatisfactory conditions are corrected.

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

3.3 CONTROL JOINT INSTALLATION

A. See drawings for location of building control joints and surface control joints.

B. Install surface control joints as follows:

1. Exterior Insulation and Finish System. Install at 15 meters

(50 feet) maximum in both directions and at building expansion joints, floor lines and where EIFS intersects other materials per manufacturer's recommendations.

3.4 SEALANT INSTALLATION

A. Exterior Insulation and Finish System: Apply sealant according to EIFS manufacturer's recommendation.

B. Do not apply sealant in locations intended for water drainage.

3.5 EXTERIOR INSULATION AND FINISH SYSTEM INSTALLATION

A. Insulation Board Layout: Place horizontally from level base line.

Stagger vertical joints and interlock at corners. Butt joints tightly.

Provide flush surfaces at joints. Offset insulation board joints from joints in sheathing minimum 200 mm (8 inches). Do not align joints with

VA Project No. 544-330 01-01-21

07 24 00 - Exterior Insulation and Finish Systems - 7 corners of doors, windows and other openings. Do not leave insulation board exposed longer than recommended by insulation manufacturer.

B. Adhesive: Apply directly to entire back surface of the insulation board as recommended by the system manufacturer and immediately apply to gypsum board substrate. Apply firm pressure over entire board to ensure uniform contact and level surface. Allow adhesive to cure for 24 hours minimum before sanding.

C. Create means of drainage between insulation board and gypsum board sheathing.

D. Flash penetrations and terminations to discharge water to exterior.

E. Mechanical Fasteners: Fasten with manufacturer's standard anchors, spaced as recommended by manufacturer, maximum 600 mm (24 inches) on center horizontally and vertically.

F. Sanding: Sand entire surface of insulation before applying base coat, level high joints and remove dirt and weathering damage. Do not pre-fill low areas with basecoat.

G. Base Coat: Trowel apply uniform thickness of base coat to insulation with minimum thickness of 1-1/2 times reinforcing fabric thickness and minimum 2.4 mm (3/32 inches) wet thickness.

H. Install reinforcing fabric embedded in base coat. Provide diagonal reinforcement at opening corners, back wrapping, and other reinforcement recommended by EIFS manufacturer. Ensure fabric pattern is not visible beneath the surface of the basecoat after installation.

Cure basecoat 24 hours minimum before applying finish coat.

I. Finish Coat:

1. Inspect basecoat for damage or defects and repair before applying finish coat.

2. Trowel apply finish coat minimum 1.6 mm (1/16 inch) thick.

3. Texture finish as required.

4. Surface Tolerance: Maximum 1/500 (1/4 inch in 10 feet) deviation from plumb and plane.

- - E N D - -

PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION

File details come from the government source that posted it. Updated .