B.08 Final Amendment Three 21R4003 5.6.21.pdf

PDF 779 KB Posted

Attached to
Veterans Affairs, Parking Expansion, Columbia, SC
Solicitation number
W912HP21R4003
Issued by

About this file

This document is an amendment to a solicitation for construction services for a parking expansion project at the Veterans Affairs facility in Columbia, South Carolina. The amendment revises the bid schedule, foundation load information, camera locations, finish schedules, landscape drawings, contract timelines, and adds a firestopping specification. Proposals are now due by 2pm EST on May 17, 2021. The total contract time for the base bid was increased from 390 to 450 calendar days, and from 460 to 520 calendar days if all add alternates are awarded. The precast installation period referenced in the project phases was extended from 14 to 21 days. The Department of the Army Corps of Engineers Engineering District Charleston is the issuing agency.

View the file

Other files

File Type Posted
D.03 Award Notice 21C4000 8.30.21.pdf PDF
B.08 Memorandum Amendment 0005 21R4003 5.20.21.pdf PDF
B.08 Amendment 0005 21R4003 5.20.21.pdf PDF
A.02 Amendment 0005 09 54 23 - Linear Metal Ceilings 21R4003 5.20.21.pdf PDF
B.08 Memorandum Amendment Four 21R4003 5.13.21.pdf PDF
07 24 00 - Exterior Insulation and Finish Systems.pdf PDF
00 01 10 - TOC.pdf PDF
2021-04-19 - Structural Revised Sheets.pdf PDF
2021-04-19 - General and Architectural Revised Sheets.pdf PDF
00 01 15 - List of Drawings.pdf PDF
B.08 Amendment Four 21R4003 5.13.21.pdf PDF
07_84_00_-_Firestopping..pdf PDF
AE601 Signage Schedule Stripping and Details.pdf PDF
Rev 4 SB101 - FOUNDATION PLAN.pdf PDF
Revised Bid Schedule page 5 of 79.pdf PDF
2017.1058.02 - 21.04.23-VA COLUMBIA - GARAGE ADDITION - Revision 2 (002).pdf PDF
Parking Garage Project Device and Conduit Plan.pdf PDF
B.08 Amendment Two 21R4003 4.29.21.pdf PDF
B.08 Amendment One 21R4003 4.21.21.pdf PDF
A.02 Amendment One Attachement Spec Revision 21R4003 4.21.21.pdf PDF
B.08 Site Visit Sign In Sheet 21R4003 4.21.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.xlsx XLSX spreadsheet
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL II 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL I with Div1 Rev 021021 4.1.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.txt TXT text file
B.08 VA Columbia Parking Expansion Solicitation 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA CD DRAWINGS Revised 21R4003 4.1.21.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

See SF 30, Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP21R4003

X 9B. DATED (SEE ITEM 11)

01-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-May-2021

CODE

PROGRAMS & PROJECT MGMT DIV

69-A HAGOOD AVENUE

CHARLESTON SC 29403-5107

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP21R4003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 3 CHANGES

1. Revised Bid Schedule from Solicitation DELETE the following:

Bid Schedule Page 5 of 79 from Solicitation

REPLACE with:

Revised Bid Schedule Page 5 of 79

2. Foundation load information:

Drawing SB101 dated 9/25/2020

Drawing SB101 revised 4/30/2021

3. Camera drawing: See drawing sheet “Parking Garage Project Device and Conduit Plan Drawing” showing locations of newly installed cameras in the existing parking garage. Contractor to expand off of the current system with additional equipment as necessary. Existing equipment may be relocated as necessary. Contractor to include all costs of relocation in bid to meet the Construction Documents.

Contractor to maintain cameras on Levels 1 and 2 throughout construction for VA use.

ADD the following:

Parking Garage Project Device and Conduit Plan Drawing Dated 4/17/2019

4. Delete Spec Section 03 45 00

Spec Section 03 45 00 Precast Architectural Concrete dated 9/25/2020

5. 09 06 00 Finish Schedule mods

Spec Section 09 06 00 Schedule for Finishes dated 09/25/2020, all references to Asphalt Shingles and TPO Roofing.

DELETE the following:

Drawing AE601 dated 09/25/2021

Drawing AE601 revised 4/27/2021

6. Replace revised landscape drawings;

Drawing LP101 dated 9/25/19

Drawing LP102 dated 9/25/19

Drawing LP101 revised 4/26/21 Drawing LP102 revised 4/26/21

7. Contract Drawings - Statement of Bid Items Legend, Base Bid Work

“120 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION

“THE TOTAL CONTRACT TIME FOR THE BASE BID IS 390 CALENDAR DAYS”

“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 460 CALENDAR DAYS IF ALL ADD

ALTERNATES ARE AWARDED”

REPLACE with:

“180 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION”

“THE TOTAL CONTRACT TIME FOR THE BASE BID IS 450 CALENDAR DAYS”

“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 520 CALENDAR DAYS IF ALL ADD

ALTERNATES ARE AWARDED”.

8. SECTION 01 00 00, para. 1.3, page 8

“…contractor will have 120 calendar days to construct the vertical expansion.”

“The total contract time for the base bid is 390 calendar days”

“…contractor will have 180 calendar days to construct the vertical expansion.”

“The total contract time for the base bid is 450 calendar days”

9. SECTION 01 00 00, para. 1.3, page 9

“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 460 CALENDAR DAYS IF ALL ADD

ALTERNATES ARE AWARDED.”

“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 520 CALENDAR DAYS IF ALL ADD

ALTERNATES ARE AWARDED.”

10. Sheet GI106 PROJECT PHASES- PHASE 3

“E. WOODLANDS TO REMAIN OPEN, EXCEPT FOR 14 DAY PRECAST INSTALL.”

“E. WOODLANDS TO REMAIN OPEN, EXCEPT FOR 21 DAY PRECAST INSTALL.”

11. Firestopping Spec ADD the following:

07_84_00_-_Firestopping

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 10-May-2021 02:00 PM to 17-May-2021 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .