This document is an amendment to a solicitation for construction services for a parking expansion project at the Veterans Affairs facility in Columbia, South Carolina. The amendment revises the bid schedule, foundation load information, camera locations, finish schedules, landscape drawings, contract timelines, and adds a firestopping specification. Proposals are now due by 2pm EST on May 17, 2021. The total contract time for the base bid was increased from 390 to 450 calendar days, and from 460 to 520 calendar days if all add alternates are awarded. The precast installation period referenced in the project phases was extended from 14 to 21 days. The Department of the Army Corps of Engineers Engineering District Charleston is the issuing agency.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
See SF 30, Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP21R4003
X 9B. DATED (SEE ITEM 11)
01-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-May-2021
CODE
PROGRAMS & PROJECT MGMT DIV
69-A HAGOOD AVENUE
CHARLESTON SC 29403-5107
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP21R4003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 3 CHANGES
1. Revised Bid Schedule from Solicitation DELETE the following:
Bid Schedule Page 5 of 79 from Solicitation
REPLACE with:
Revised Bid Schedule Page 5 of 79
2. Foundation load information:
Drawing SB101 dated 9/25/2020
Drawing SB101 revised 4/30/2021
3. Camera drawing: See drawing sheet “Parking Garage Project Device and Conduit Plan Drawing” showing locations of newly installed cameras in the existing parking garage. Contractor to expand off of the current system with additional equipment as necessary. Existing equipment may be relocated as necessary. Contractor to include all costs of relocation in bid to meet the Construction Documents.
Contractor to maintain cameras on Levels 1 and 2 throughout construction for VA use.
ADD the following:
Parking Garage Project Device and Conduit Plan Drawing Dated 4/17/2019
4. Delete Spec Section 03 45 00
Spec Section 03 45 00 Precast Architectural Concrete dated 9/25/2020
5. 09 06 00 Finish Schedule mods
Spec Section 09 06 00 Schedule for Finishes dated 09/25/2020, all references to Asphalt Shingles and TPO Roofing.
DELETE the following:
Drawing AE601 dated 09/25/2021
Drawing AE601 revised 4/27/2021
6. Replace revised landscape drawings;
Drawing LP101 dated 9/25/19
Drawing LP102 dated 9/25/19
Drawing LP101 revised 4/26/21 Drawing LP102 revised 4/26/21
7. Contract Drawings - Statement of Bid Items Legend, Base Bid Work
“120 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION
“THE TOTAL CONTRACT TIME FOR THE BASE BID IS 390 CALENDAR DAYS”
“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 460 CALENDAR DAYS IF ALL ADD
ALTERNATES ARE AWARDED”
REPLACE with:
“180 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION”
“THE TOTAL CONTRACT TIME FOR THE BASE BID IS 450 CALENDAR DAYS”
“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 520 CALENDAR DAYS IF ALL ADD
ALTERNATES ARE AWARDED”.
8. SECTION 01 00 00, para. 1.3, page 8
“…contractor will have 120 calendar days to construct the vertical expansion.”
“The total contract time for the base bid is 390 calendar days”
“…contractor will have 180 calendar days to construct the vertical expansion.”
“The total contract time for the base bid is 450 calendar days”
9. SECTION 01 00 00, para. 1.3, page 9
“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 460 CALENDAR DAYS IF ALL ADD
ALTERNATES ARE AWARDED.”
“TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 520 CALENDAR DAYS IF ALL ADD
ALTERNATES ARE AWARDED.”
10. Sheet GI106 PROJECT PHASES- PHASE 3
“E. WOODLANDS TO REMAIN OPEN, EXCEPT FOR 14 DAY PRECAST INSTALL.”
“E. WOODLANDS TO REMAIN OPEN, EXCEPT FOR 21 DAY PRECAST INSTALL.”
11. Firestopping Spec ADD the following:
07_84_00_-_Firestopping
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 10-May-2021 02:00 PM to 17-May-2021 02:00 PM.
(End of Summary of Changes)