A.02 17.1058.02 - RTA CD DRAWINGS Revised 21R4003 4.1.21.pdf
PDF 40 MB Posted
- Solicitation number
- W912HP21R4003
About this file
This document summarizes a federal contract opportunity for parking expansion at the Veterans Affairs facility in Columbia, South Carolina. The Department of the Army Corps of Engineers Engineering District Charleston is soliciting proposals under solicitation number W912HP21R4003 for construction services to expand parking capacity at the site. Proposals are due no later than 2pm Eastern Standard Time on May 3rd, 2021. The opportunity description indicates the scope of work involves expanding parking facilities but provides no further details on requirements, pricing terms, or evaluation criteria.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 4
EL 134'-0"
LEVEL 3
EL 122'-8"
LEVEL 2
EL 111'-4"
LEVEL 1
EL 100'-0"
ISOMETRIC KEY PLAN
SHADE INDICATES EXISTING GARAGE
ADD ALT AREA 'A'
ADD ALT AREA 'B'
ADD ALT AREA 'C'
SOLID WHITE AREA INDICATES BASE BID GARAGE
GENERAL NOTES
1. REFERENCE SPECIFICATION SECTION 01 35 26 FOR ICRA REQUIRED TO BE
PERFORMED ON THIS PROJECT
2. REFERENCE SPECIFICATION SECTION 01 91 00 FOR COMMISSIONING
REQUIREMENTS FOR THIS PROJECT.
3. SOILS REPORT IS PROVIDED FOR INFORMATION ONLY. ANY
RECOMMENDATIONS IN REPORT ARE NOT CONTRACTUAL.
ADD ALTERNATE A: ADD THE PORTION OF THE GARAGE STRUCTURE BETWEEN GRID LINES 12-13 AND A-C ON LEVEL 4. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY SYSTEMS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY. SEE ALT. AS SHOWN ON SHEETS (SF104A, AE150, FX103A, PP105A, EA104A) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 7 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE B: ADD THE PORTION OF THE GARAGE STRUCTURE BETWEEN GRID LINES 13-19 AND A-B ON LEVEL 4. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, RAILINGS, DOORS, CURTAIN WALL, EMERGENCY SYSTEMS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID PLUS ADD ALTERNATE A GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY.
SEE ALT. AS SHOWN ON SHEETS (SF105, AE151, FX103B, PP105B, EA104B) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 14 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE C: ADD THE PORTION OF THE GARAGE STRUCTURE BETWEEN GRID LINES 13-19 AND B-C ON LEVEL 4. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY SYSTEMS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID PLUS ADD ALTERNATE A AND B GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY. SEE ALT. AS SHOWN ON SHEETS (SF105A, AE152, PP105CD, EA104CD) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 14 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE D: ADD 4 STOP ELEVATOR IN STAIR TOWER 1 WHICH IS LOCATED BETWEEN GRID LINES 6 AND 8. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY SYSTEMS, SIGNAGE AND WAYFINDING, HAND AND GUARDS RAILS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID PLUS ADD ALTERNATE A, B AND C GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY.
SEE ALT. AS SHOWN ON SHEETS (SF301, AE152, MM104, PP105CD, EA104CD) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 28 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE E: ADDITIONAL LANDSCAPE DESIGN AS SHOWN ON SHEET LP102 AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 7 CALENDAR DAYS FOR THIS ALTERNATE.
TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 460 CALENDAR DAYS IF ALL ADD ALTERNATES ARE AWARDED.
STATEMENT OF BID ITEMS LEGEND
A
X
B
C
D
E
SEE GI105 FOR ADDITIONAL INFORMATION
ADD ALTERNATES
BASE BID WORK INCLUDES NECESSARY REMOVAL OF EXISTING STRUCTURE AND APPURTENANCES FOR GENERAL CONSTRUCTION, ALTERATIONS, ROADS, WALKS, GRADING, DRAINAGE, LABOR, MATERIAL, AND EQUIPMENT TO CONSTRUCT THE GARAGE STRUCTURE, ELECTRICAL AND IT EXTENSIONS, ELEVATORS, STAIRS, SIGNAGE AND CERTAIN OTHER ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.
CONTRACTOR SHALL HAVE 90 CALENDAR DAYS FROM THE CONSTRUCTION NOTICE TO PROCEED TO SUBMIT AND RECEIVE APPROVALS OF ALL SUBMITTALS. ONCE APPROVALS ARE OBTAINED, THE CONTRACTOR WILL HAVE 120 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION. ONCE THE VERTICAL EXPANSION IS COMPLETED, THE CONTRACTOR WILL HAVE 180 CALENDAR DAYS TO COMPLETE THE HORIZONTAL EXPANSION AND ALL REMAINING WORK. SEE GI106, CC002, AND CC003 FOR FURTHER PHASING REQUIREMENTS FOR THIS PROJECT. THE TOTAL CONTRACT TIME FOR THE BASE BID IS 390
CALENDAR DAYS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \d v a lla n d in g h a m
\D o c u m e n ts \1
.1
.0
A
V
A C o lu m b ia v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7 /2
:1
:0
P
M
GI000
COVER SHEET
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 AO TS
CONSTRUCTION
DOCUMENTS
Sheet List
Sheet Number Sheet Name
GENERAL
GI000 COVER SHEET
GI101 CODE ANALYSIS
GI102 LIFE SAFETY PLANS
GI103 LIFE SAFETY PLANS
GI104 LIFE SAFETY PLANS - ADD ALTERNATES
GI105 ADD ALTERNATES
GI106 PHASING NOTES AND DIAGRAMS
CIVIL
CC001 GENERAL NOTES
CC002 PHASING PLAN - PHASE 1,2.3 AND 4
CC003 PHASING PLAN - PHASE 5
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS501 SITE DETAILS
CG101 GRADING PLAN
CU101 UTILITY PLAN
CU501 UTILITY DETAILS
CU502 UNDERGROUND STORMWATER BASIN DETAILS
CU503 UNDERGROUND STORMWATER BASIN DETAILS
CJ101 EROSION CONTROL PLAN
CJ102 SWPPP
CJ501 EROSION CONTROL DETAILS
LP101 LANDSCAPE PLAN - BASE BID
LP102 LANDSCAPE PLAN - ALT. E
LP501 LANDSCAPE DETAILS
STRUCTURE
SI001 STRUCTURAL ABBREVIATIONS AND SYMBOLS
SI002 GENERAL STRUCTURAL NOTES
SI003 LOAD MAPS
SB101 FOUNDATION PLAN
SB102 SLAB ON GRADE PLAN
SB501 FOUNDATION SECTIONS AND DETAILS
SF101 SECOND FLOOR FRAMING PLAN
SF102 LEVEL 3 WEST FRAMING PLAN
SF103 LEVEL 3 EAST FRAMING PLAN
SF104 LEVEL 4 WEST FRAMING PLAN
SF104A LEVEL 4 WEST FRAMING PLAN - ADD ALTERNATE A
SF105 LEVEL 4 EAST FRAMING PLAN-ADD ALTERNATE B
SF105A LEVEL 4 EAST FRAMING PLAN - ADD ALTERNATE C
SF301 BUILDING ELEVATIONS
SF301A BUILDING ELEVATIONS WITH ADD ALTERNATES
SF302 SHEAR WALL ELEVATIONS
SF303 PRECAST WALL ELEVATIONS
SF401 ENLARGED PLAN VIEWS
SF501 FRAMING SECTIONS AND DETAILS
SF502 FRAMING SECTIONS AND DETAILS
SF503 FRAMING SECTIONS AND DETAILS
SF901 ISOMETRIC VIEWS
ARCHITECTURAL
AE001 ARCHITECTURAL ABBREVIATIONS
AE002 ARCHITECTURAL SYMBOLS AND GENERAL CONSTRUCTION NOTES
AD101 LEVEL 1 - DEMO PLAN
AD102 LEVEL 2 - DEMO PLAN
AD103 LEVEL 3 AND ROOF- DEMO PLAN
AE101 LEVEL 1 - HORIZONTAL EXPANSION FLOOR PLAN
AE102 LEVEL 2 - HORIZONTAL EXPANSION FLOOR PLAN
AE103 LEVEL 3 - VERTICAL EXPANSION FLOOR PLAN
AE104 LEVEL 3 - HORIZONTAL EXPANSION FLOOR PLAN
AE105 LEVEL 4 -VERTICAL EXPANSION FLOOR PLAN
AE150 LEVEL 4 - ADD ALTERNATE 'A'
AE151 LEVEL 4 - ADD ALTERNATE 'B'
AE152 LEVEL 4 - ADD ALTERNATE 'C' AND 'D'
AE201 ROOF PLAN AND DETAILS
AE301 EXTERIOR ELEVATIONS
AE401 WALL SECTION & DETAILS
AE402 STAIR 3 - ENLARGED PLANS AND SECTIONS
AE403 STAIR 1- ENLARGED PLANS AND SECTIONS
AE404 STAIR 2 - ENLARGED PLANS AND SECTIONS & STAIR DETAILS
AE405 STAIR 4 & 5 - ENLARGED PLANS AND SECTIONS
AE501 STOREFRONT ELEVATIONS & DOOR SCHEDULE
AE601 SIGNAGE SCHEDULE, STRIPING & DETAILS
AE602 STRIPING, WAYFINDING & INTERIOR ELEVATION
AP601 SIGN SCHEDULE & DETAILS - ARCHITECTURAL PARKING
AW501 WATERPROOFING DETAILS - STRUCTURAL
FIRE SUPPRESSION
FX001 FIRE NOTES AND LEGENDS
FX101 FIRE SUPPRESSION PLANS
FX102 FIRE SUPPRESSION PLANS
FX103A FIRE - ADD ALTERNATE - ADD ALTERNATE 'A'
FX103B FIRE - ADD ALTERNATE - ADD ALTERNATE 'B'
FX901 FIRE SUPPRESSION RISERS
PLUMBING
PI001 PLUMBING NOTES AND LEGEND
PP101 LEVEL 1 PLUMBING PLAN
PP102 LEVEL 2 PLUMBING PLAN
PP103 LEVEL 3 PLUMBING PLAN
PP104 LEVEL 3 PLUMBING PLAN
PP105 LEVEL 4 PLUMBING PLAN
PP105A PLUMBING - ADD ALTERNATE 'A'
PP105B PLUMBING - ADD ALTERNATE 'B'
PP105CD PLUMBING - ADD ALTERNATE 'C' AND 'D'
PP501 PLUMBING DETAILS
PP901 PLUMBING RISERS
PP902 PLUMBING RISERS
MECHANICAL
MM001 HVAC NOTES AND LEGEND
MM002 HVAC SCHEDULES AND DETAILS
MM101 LEVEL 1 HORIZONTAL EXPANSION - FLOOR PLAN
MM104 LEVEL 4 HORIZONTAL EXPANSION - FLOOR PLAN
ELECTRICAL
E001 ELECTRICAL NOTES AND LEGENDS
ED101 ELECTRICAL DEMOLITION SITE PLAN
ES101 ELECTRICAL NEW SITE PLAN
EL101 LEVEL 1 HORIZONTAL EXPANSION - FLOOR PLAN - LIGHTING
EL102 LEVEL 2 HORIZONTAL EXPANSION - FLOOR PLAN - LIGHTING
EL103A LEVEL 3 VERTICAL EXPANSION - FLOOR PLAN - LIGHTING
EL103B LEVEL 3 HORIZONTAL EXPANSION - FLOOR PLAN - LIGHTING
EL104 LEVEL 4 VERTICAL EXPANSION - FLOOR PLAN - LIGHTING
ELP104 LIGHTNING PROTECTION SYSTEM
EP101 LEVEL 1 - FLOOR PLAN - POWER & SPECIAL SYSTEMS
EP102 LEVEL 2 - FLOOR PLAN - POWER & SPECIAL SYSTEMS
EP103A LEVEL 3 - VERTICAL EXPANSION - POWER & SPECIAL SYSTEMS
EP103B LEVEL 3 - HORIZONTAL EXPANSION - POWER & SPECIAL SYSTEMS
EP104 LEVEL 4 - FLOOR PLAN VERTICAL EXPANSION POWER & SPECIAL
SYSTEMS
EE401 ELECTRICAL ENLARGEMENTS
EE402 ELECTRICAL ENLARGEMENTS
EA104A LEVEL 4 - ADD ALTERNATE 'A'
EA104B ADD ALTERNATE 'B'
EA104CD ADD ALTERNATE 'C' AND 'D'
E501 DETAILS
E502 DETAILS
E503 DETAILS
E601 RISER DIAGRAM, FIRE ALARM MATRIX AND LIGHTING FIXTURE
SCHEDULE
E701 PANEL SCHEDULES
LOCATION MAP
VICINITY MAP PROJECT SITE
WILLIAM JENNINGS BRYAN DORN VA MEDICAL CENTER
COLUMBIA, SOUTH CAROLINA
CORRECT PARKING SITE DEFICIENCIES
CONSTRUCTION DOCUMENTS
Contact:Contact: Contact: Contact:
STRUCTURAL
ENGINEER
GUIDON DESIGN INC.
Adam Ogrzewalla
Architect, AIA NCARB p: 317.800.6388 x 103 e: aogrzewalla@guidondesign.com
ARCHITECT
WJB DORN VAMC
Robert Price
General Engineer/COR
Engineering Service (138A)
WJB DORN VAMC
6439 Garners Ferry Road Columbia, SC 29209 p: 803.776.4000 x 7261 e: robert.price5@va.gov
OWNER
GUIDON DESIGN INC.
Stacey Paul
Project Manager, P.E.
1221 N. Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 104 e: spaul@guidondesign.com
CIVIL ENGINEER
PROJECT MANAGER
MEP DESIGN TEAM
Phillip Moody
Operations Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
550 North Reo Street Suite 203 Tampa, FL 33609 p: 813.331.5085 e: philip.moody@mesgroupinc.com
Contact:
GUIDON DESIGN INC.
Lauren Lai
Structural Engineer, P.E.
p: 317.800.6388 x 117 e: llai@guidondesign.com
1221 N. Pennsylvania Street Suite 200 Indianapolis, IN 46202
1221 N. Pennsylvania Street Suite 200 Indianapolis, IN 46202
David L. Omura Director/Chief Executive Officer
Jeffery A. Soots Associate Medical Center Director
Angela Scott Assistant Medical Center Director
Christopher Zell Chief of Engineering
Steve Crosby Project Section Chief
Assistant Chief of Engineering
David Bagley Maintenance Control Manager
Billie Thompson Patient Safety Manager
Lucy Austin Infection Control Manager
Michael Schausten Chief of Police and Security
Jeff Brown Director of Safety
Bob Price Jr.
COR
Revisions: Date:
GOVERNING CODES:
ICC, International Building Code, 2018 edition (IBC) NFPA 101, Life Safety Code, 2015 edition (LSC) NFPA 10, Standard for Portable Fire Extinguishers, 2013 edition.
NFPA 13, Standard for the Installation of Sprinkler Systems, 2013 edition.
NFPA 14, Standard for the Installation of Standpipe and Hose System, 2013 edition.
NFPA 24, Standard for the Installation of Private Fire Service Mains and their Appurtenance, 2013 edition.
NFPA 72, National Fire Alarm Code, 2013 edition.
NFPA 70, National Electric Code, 2014 edition.
NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013 edition.
NFPA 88A, Standard for Parking Structures, 2015 edition.
NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating
Systems, 2015 edition.
NFPA 220, Standard Types of Building Construction, 2015 edition.
NFPA 291, Recommended Practice for Fire Flow Testing and Marking of
Hydrants, 2013 edition.
ASTM E2072-04, Specification for Photoluminescent (Phosphorescent) Safety
Markings, 2004 edition.
International Plumbing Code
ASHRAE 90.1-2012
ASHRAE 62.1 – 2012
ANSI A117.1-2009 Standard on Accessible & Usable Buildings and Facilities 2010 ADA Standards for Accessible Design
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, Design Handbook
VA Parking Design Manual & Demand Model, April 2013 VA Barrier Free Design Guide Architectural Electrical
HVAC
Plumbing Site and Landscape Auto Transport Interior Design Structural Sanitary Fire Protection, Sixth Edition Revised September 2011 Facilities Physical Security Design Manual: Life-Safety Protected
VA DESIGN MANUALS:
2. The electrical, security and IT rooms do not have a total area exceedign 3,000 SF therefore shall be separated by partitions built to resist the passage of smoke. NFPA 88A 5.2.4.
3. Fire barriers will extend from the top of the floor below to the underside of the floor or roof deck above. The openings and penetrations in required exit enclosures will be protected with self-closing or automatic-closing opening protectives. Openings in fire resistance rated walls will be protected in accordance with the following:
COMPONENT WALLS AND PARTITIONS FIRE DOOR ASSEMBLIES
(HR) NFPA 101 8.3.4.2 (HR/MIN) NFPA 101 8.3.4.2
Elevator Hoistways 0 (NFPA 101 42.8.3.1.2) 0 Elevator Machine Rooms 2 (NFPA 7.14.7.1) 1.5(90)
Vertical Shafts (including enclosed exit stairways) 0 (NFPA 101 42.8.3.1.2) 0
Fire Barriers 1 .75(45) 2 1.5(90) 3 3(180)
Piping, conduit, and wire penetrations of fire rated construction will be protected by materials or systems of the same hourly rating listed by Underwriters Laboratories (UL), Factory Mutual (FM), or a National Recognized Testing Laboratory (NRTL). Duct, air transfer openings, and other penetrations through floors, shaft enclosures and other fire rated construction will be protected in accordance with the LSC and the IBC.
G. MEANS OF EGRESS
Means of egress shall be in compliance with NFPA 101 and as modified by NFPA 88A. Egress requirements are based upon a non-sprinklered building. Exits must be so located on each story such that the maximum length of exit access travel, measured from the most remote point within a story along the natural and unobstructed path of egress travel to an exterior exit door at the level of exit discharge, an entrance to a vertical exit enclosure, an exit passageway, a horizontal exit, an exterior exit stairway or an exterior exit ramp, may not exceed the distances allowed by the Code.
Egress requirements are outlined below.
1. Maximum travel distance: open parking garage – 300 feet ( NFPA 101 Table 42.8.2.6.1 )
2. Common path of travel: 50 feet ( NFPA 101 Table 42.8.2.5.1 )
3. Dead ends: 50 feet ( NFPA 101 Table 42.8.2.5.2 )
4. Number of exits: At least two exits shall be provided from every floor/tier. In certain conditions ramps may be substituted for an egress stair. ( NFPA 101 Table 42.8.2.4 )
5. Egress Width Factor: NFPA 101 Table 7.3.3.1 requires a minimum egress width of 0.2 in per occupant for doors, ramps, and corridors and a minimum egress width of 0.3 in per occupant for stairs.
6. Occupant Load factor: NFPA 101 Table 7.3.1.2 requires an Occupant load factor of 500 s.f. per person be applied to storage use type facilities other than storage and mercantile occupancies. Parking garages are classified by chapter 42 of the NFPA 101 as storage type occupancies. IBC Table 1004.1.2 requires an occupant load factor of 200 for parking garages
7. Remoteness of exits: Where two or more exits or exit access doorways are required from any portion of the exit access, at least two of the exit doors or exit access doorways must be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the building or area to be served measured in a straight line between exit doors or exit access doorways.
8. Stairs Design ( per theNFPA 101 7.2.2):
9. Maximum Riser Height: 7 inches (NFPA 101 Table 7.2.2.2.1.1(a))
Minimum Tread Length: 11 inches (NFPA 101 Table 7.2.2.2.1.1(a)) Minimum Stair Width: 44 inches (NFPA 101 Table 7.2.2.2.1.2(B)) Guard: 42 inches( Required where elevation change exceeds 30 inches. Design shall prevent the passage of a 4 inch Sphere.) (NFPA 101 7.2.2.4.6.2) Handrail: 34-38 inches (NFPA 101 7.2.2.4.5.1) Minimum Clearance: 6 feet 8 inches (Measured vertically from nose of tread.)
Signage: Required at each floor level (NFPA 101 7.2.2.5.4)
10. Ramp Design: per the NFPA 101 7.2.5):
Maximum Slope: 1/12 (NFPA 101 Table 7.2.5.3(a)) Guard: 42 inches(Required where elevation change exceeds 30 inches. Design shall prevent the passage of a 4 inch Sphere.) (NFPA 101 7.2.2.4.6.2) 4 inch curbs required for drop off edge of ramp
Handrail: 34-38 inches (required for ramps with more than a 6 inch rise) (NFPA 101 7.2.2.4.5.1)
11. Areas Of Refuge: Not required in open parking garages (NFPA 101 42.8.2.2.9.2)
H. EMERGENCY ELEVATOR OPERATION
Elevator will have a Smoke detector, located in its respective lobby, on each floor level where the lobby is enclosed. A heat detector is permitted where the lobby is open to the environment. Upon activation of a lobby heat detector or machine room smoke detector, the elevators served by that lobby or machine room will be recalled to the main level of the building, one at a time. In the event that the alarm is on this designated level, the elevators will be recalled one at a time to an alternate level. It is proposed to recall only the elevator or group of elevators served by the affected lobby or elevator machine room.
After returning to the appropriate level, the elevators will stop, the doors will open, and the elevators will be rendered inoperable without the use of the fireman's key or until such time that they are manually reset to the normal operating mode. This mode of operation is provided for fire department use to allow for access to all levels served by the elevators.
I. Automatic Sprinkler System
Not required in open parking garages (NFPA 101 42.8.3.5 and NFPA 88A 6.4.4)
J. Standpipes
Class I Standpipes are required in open parking garages exceeding 50 feet in height PER NFPA 88A 6.5.1
K. PORTABLE FIRE EXTINGUISHERS
1. Portable fire extinguishers will be provided throughout the garages as required by IFC section 906.1 and spaced in accordance with NFPA 10, 2013 edition. 75' Spacing Reference specifications for additional fire extinguisher requirements at this location, including a monitoring system.
L. Fire alarm system
Per VA guidelines, a fire alarm system is provided in this project.
A. OCCUPANCY CLASSIFICATION
1. The parking garage is classified as low-hazard storage facilities, a Group S-2 Occupancy, and as an ordinary hazard by NFPA 101 42.8.15
2. The parking garage is considered an OPEN PARKING STRUCTURE openings shall comply with the following:
a. Open Parking Structure: A parking structure that meets the requirements of NFPA 88A Section 5.5
i. Each parking level shall have wall openings to the atmosphere for an area of not less than 1.4 square feet for each linear foot of the exterior perimeter.
ii. Opening shall be distributed over a minimum of 40% of the building perimeter or uniformly over two opposing sides.
iii. Interior wall lines and columns shall be at least 20% open, with openings distributed to provide ventilation.
3. This parking garage is classified as a Ramp Type Parking Structure: A parking Structure that utilizes sloped ramps for vertical vehicle circulation per NFPA 88A 4.1.3
B. CONSTRUCTION CLASSIFICATION
1. The parking garage is to be constructed in accordance with the provisions of NFPA 88A as defined in NFPA 220.
Construction type for a building exceeding 25 feet in height shall be Type I, Type II(222) or Type II(111). An open parking garage of these construction types may be unlimited in height and area. In addition, per NFPA 88 5.1.4, Type II(000) is permitted to be of unlimited area where both the height does not exceed 75 feet and the horizontal distance from any point on any parking level to an exterior wall opening on a street, an alley, a courtyard or other similar permanent open space does not exceed 200 feet.
2. The Parking Garage has four levels above grade and is classified as an open parking structure. The construction classification is Type II(000) based upon the occupancy and area of the building.
3. Primary structural elements of Type II(000) buildings are not required to be rated. Primary structural elements supporting a roof are not required to be rated, and all floor construction are not required to be rated.
NFPA 220 Table 4.1.1
4. Primary structural members are considered to be bearing walls, columns, and the girders, beams, trusses and spandrels having direct connections to columns and bracing members designed to carry gravity loads. The members of floor or roof panels which have no connection to the columns and do not carry a gravity load are considered secondary members and are not part of the structural frame of a building
CODE ANALYSIS
C. FIRE RESISTANCE RATED SEPARATIONS
The Garages will be designed as nonseparated mixed uses. Incidental uses are not anticipated, so no fire rated separation is required between occupancies. Interior building elements that require fire resistance ratings are listed below:
BUILDING ELEMENT FIRE RESISTANCE RATING CODE REFERENCE
Non-enclosed Exit Stairs (Provided) 0 NFPA 88A, 4.1.5
Enclosed Exit Stairs (NOT PROVIDED) 1,2 NFPA 101 7.1.3.2.1
Ramps 0 NFPA 101 42.8.3.1.2
Other shafts which connect 2 or more stories 2 NFPA 101 42.8.3.1.2
Elevator machine rooms 2 NFPA 101 7.14.7.1
Emergency generator (if provided) 2 NFPA 70
(1) Supporting structural members (located within one structural bay) must have the same fire resistance rating. The fire resistance rating must be carried through all structural members; extending to the foundation. In addition, the shaft construction must maintain the same fire rating as the floor construction (1 Hr rated).
(2) Where nonrated walls or unprotected openings enclose the exterior of the stairway and the walls or openings are exposed by other parts of the building at an angle of less than 180 degrees, the building exterior walls within
3.048 m (10 ft) horizontally of a nonrated wall or unprotected opening must have a fire resistance rating of not less than 1-hour. Openings within such exterior walls must be protected by opening protectives having a fire protection rating of not less than ¾-hour. This construction must extend vertically from the ground to a point 3.048 m (10 ft) above the top most landing of the stairway or to the roof line, whichever is lower.
1. Mechanical equipment rooms incidental to the use of the building are not required to be separated by an occupancy separation. Special hazard rooms such as general storage and furnace/boiler rooms and electrical switchgear rooms shall be separated per NFPA 70 and potentially IBC Table 508.2.
D. BUILDING PLACEMENT
The code requires the exterior walls of buildings to be protected from one another based on the fire separation distance between buildings, or to a lot line. Fire separation distance is defined as the distance measured from the face of a building to one of the following three points:
1. The closest interior lot line;
2. To the centerline of a street, an alley or public way, or;
3. To an imaginary line between two buildings on the property.
No fire rated separation is required where the parking structure is separated by 10 feet. NFPA 88A 5.2.2
E. INTERIOR FINISH
Interior wall and ceiling finish to be designed in accordance with the NFPA 101, 42.8.3.3.3.
1. Class A, B and C finish is permitted for interior walls and ceilings in rooms, and corridors. Class A or B finish is permitted for exits.
2. Per the IBC Section 406.2.6 all floor surfaces shall be of concrete or other similar non-combustible and non-absorbent materials. Floor Finish shall not be less than Class II.
F. EGRESS LIGHTING AND EXIT SIGNAGE
Emergency egress lighting will be provided throughout the common portions of the means of egress in accordance with The Life Safety Code Code section 42.8.2.8, 42.8.2.9 and 42.8.2.10.
1. These areas include drive lanes, corridors, exit access spaces within areas requiring two (2) or more means of egress, the lobby/entrance areas, exit stairs, and the exit discharge areas (including exterior locations until the public way).
2. Each required exit will be identified with an exit sign, including exit access, and within areas requiring multiple exits. Directional exit signs will also be provided to direct occupants toward the closest exit so that no occupant is more than 100 feet from an exit sign.
3. The egress lighting and exit signs will be provided with a secondary source of power in the event that the primary power source is disrupted. The secondary power source will consist of either internal batteries or a connection to an emergency power system.
FIRE EXTINGUISHER IN CABINET WITH EN GAUGE MONITORING TETHER. EXISTING
TETHER WAS LOCATED IN CENTER OF CABINET. OFFSET THIS LOCATION IN NEW
CONSTRUCTION SUCH THAT FIRE EXTINGUISHER MAY BE MOUNTED IN CENTER OF
CABINET.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\t s a n d e rs \D o c u m e n ts
\1
.1
.0
A
V
A C o lu m b ia v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/2
/2
:5
:5
A
M
GI101
CODE ANALYSIS
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
09/25/2020 AO TS
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
Phase
CONSTRUCTION
DOCUMENTS
UP
DN
UP
MAX TRAVEL DISTANCE = 251-6"
MAX TRAVEL DISTANCE = 258'-0"
DIAGONAL DISTANCE = 521'-4"
DISTANCE BETWEEN EXITS = 375'-9"
MAX TRAVEL DISTANCE = 202'-0"
MAX TRAVEL DISTANCE = 188'-3"
M
A T
C H
L
IN
E M
A T
C H
L
IN
E
FEC
FEC
FEC
FECFEC
FEC
FEC
FEC
MAX TRAVEL DISTANCE = 251-6"
MAX TRAVEL DISTANCE = 256'-0"
MAX TRAVEL DISTANCE = 202'-0"
MAX TRAVEL DISTANCE = 188'-3"
M A
T C
H L
IN
E
M A
T C
H L
IN
E
DIAGONAL DISTANCE = 521'-4"
DISTANCE BETWEEN EXITS = 375'-9"
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
NOTE: MATCHLINE IS PROVIDED FOR
CLARITY ON OTHER SHEETS.
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
EXISTING CONSTRUCTION
NEW CONSTRUCTION WALL
LEVEL 4
EL 134'-0"
LEVEL 3
EL 122'-8"
LEVEL 2
EL 111'-4"
LEVEL 1
EL 100'-0"
ISOMETRIC KEY PLAN
SHADE INDICATES EXISTING GARAGE
ADD ALT AREA 'A'
ADD ALT AREA 'B'
ADD ALT AREA 'C'
SOLID WHITE AREA INDICATES BASE BID GARAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \d v a lla n d in g h a m
\D o c u m e n ts \1
.1
.0
A
V
A C o lu m b ia v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7 /2
:1
:1
P
M
GI102
LIFE SAFETY PLANS
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 AO TS
CONSTRUCTION
DOCUMENTS
SCALE: 1/16" = 1'-0"GI102
1 LIFE SAFETY - FIRST FLOOR PLAN
SCALE: 1/16" = 1'-0"GI102
2 LIFE SAFETY - SECOND FLOOR PLAN
UP
DN
UP
DN
DN
MAX TRAVEL DISTANCE = 251-6"
MAX TRAVEL DISTANCE = 256'-0"
MAX TRAVEL DISTANCE = 202'-0"
MAX TRAVEL DISTANCE = 188'-3"
M A
T C
H L
IN
E
M A
T C
H L
IN
E
DIAGONAL DISTANCE = 521'-4"
DISTANCE BETWEEN EXITS = 375'-9"
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
MAX TRAVEL DISTANCE = 168'
DIAGONAL DISTANCE = 306'
DIS
TANCE B
ETW
EEN E
XIT
S = 16
1'
FEC
FEC
FEC
FEC
NOTE: MATCHLINE IS PROVIDED FOR
CLARITY ON OTHER SHEETS.
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
EXISTING CONSTRUCTION
NEW CONSTRUCTION WALL
LEVEL 4
EL 134'-0"
LEVEL 3
EL 122'-8"
LEVEL 2
EL 111'-4"
LEVEL 1
EL 100'-0"
ISOMETRIC KEY PLAN
SHADE INDICATES EXISTING GARAGE
ADD ALT AREA 'A'
ADD ALT AREA 'B'
ADD ALT AREA 'C'
SOLID WHITE AREA INDICATES BASE BID GARAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \d v a lla n d in g h a m
\D o c u m e n ts \1
.1
.0
A
V
A C o lu m b ia v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7 /2
:1
:1
P
M
GI103
LIFE SAFETY PLANS
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 AO TS
CONSTRUCTION
DOCUMENTS
SCALE: 1/16" = 1'-0"GI103
1 LIFE SAFETY - THIRD FLOOR PLAN
SCALE: 1/16" = 1'-0"GI103
2 LIFE SAFETY - FOURTH FLOOR PLAN
DN
DN
DN
DN
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
EXISTING CONSTRUCTION
NEW CONSTRUCTION WALL
LEVEL 4
EL 134'-0"
LEVEL 3
EL 122'-8"
LEVEL 2
EL 111'-4"
LEVEL 1
EL 100'-0"
ISOMETRIC KEY PLAN
SHADE INDICATES EXISTING GARAGE
ADD ALT AREA 'A'
ADD ALT AREA 'B'
ADD ALT AREA 'C'
SOLID WHITE AREA INDICATES BASE BID GARAGE
MAX TRAVEL DISTANCE = 198'
DIAGONAL DISTANCE = 347'
DIS
TANCE B
ETW
EEN E
XIT
S = 16
1'
FEC
FEC
FEC
FEC
NOTE: MATCHLINE IS PROVIDED FOR
CLARITY ON OTHER SHEETS.
NOTE: WITH ADD ALTERNATE 'A',
STRIPING AT BASE OF STAIR WILL NEED
TO BE MODIFEID
MAX TRAVEL DISTANCE = 198'
DIAGONAL DISTANCE = 522'
DISTANCE BETWEEN EXITS = 374'
FEC
FEC
FEC
FEC
NOTE: MATCHLINE IS PROVIDED FOR
CLARITY ON OTHER SHEETS.
FEC FEC
M
AX T
RAVEL
DIS
TANCE =
NOTE: WITH ADD ALTERNATE 'B',
STRIPING AT BASE OF STAIR WILL NEED
TO BE MODIFEID
MAX TRAVEL DISTANCE = 198'
DIAGONAL DISTANCE = 522'
DISTANCE BETWEEN EXITS = 374'
FEC
FEC
FEC
FEC
NOTE: MATCHLINE IS PROVIDED FOR
CLARITY ON OTHER SHEETS.
FEC
FEC
MAX TRAVEL DISTANCE = 111'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \d v a lla n d in g h a m
\D o c u m e n ts \1
.1
.0
A
V
A C o lu m b ia v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7 /2
:1
:1
P
M
GI104
LIFE SAFETY PLANS - ADD
ALTERNATESGUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 AO TS
CONSTRUCTION
DOCUMENTS
SCALE: 1" = 20'-0"GI104
2 LIFE SAFETY - FOURTH FLOOR PLAN ADD ALT A
SCALE: 1" = 20'-0"GI104
3 LIFE SAFETY - FOURTH FLOOR PLAN ADD ALT B
SCALE: 1" = 20'-0"GI104
4 LIFE SAFETY - FOURTH FLOOR PLAN ADD ALT C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
A
B
C
15.5
B.6
D A B
C
ADD ALTERNATE A: ADD THE PORTION OF THE GARAGE STRUCTURE BETWEEN GRID LINES 12-13 AND A-C ON LEVEL 4. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY SYSTEMS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY. SEE ALT. AS SHOWN ON SHEETS (SF104A, AE150, FX103A, PP105A, EA104A) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 7 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE B: ADD THE PORTION OF THE GARAGE STRUCTURE BETWEEN GRID LINES 13-19 AND A-B ON LEVEL 4. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, RAILINGS, DOORS, CURTAIN WALL, EMERGENCY SYSTEMS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID PLUS ADD ALTERNATE A GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY.
SEE ALT. AS SHOWN ON SHEETS (SF105, AE151, FX103B, PP105B, EA104B) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 14 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE C: ADD THE PORTION OF THE GARAGE STRUCTURE BETWEEN GRID LINES 13-19 AND B-C ON LEVEL 4. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY SYSTEMS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID PLUS ADD ALTERNATE A AND B GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY. SEE ALT. AS SHOWN ON SHEETS (SF105A, AE152, PP105CD, EA104CD) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 14 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE D: ADD 4 STOP ELEVATOR IN STAIR TOWER 1 WHICH IS LOCATED BETWEEN GRID LINES 6 AND 8. THIS INCLUDES ALL NECESSARY APPURTENANCES (INCLUDING BUT NOT LIMITED TO: LIGHTING, DRAINAGE, SECURITY CAMERAS, FALL DETERRENT, EMERGENCY SYSTEMS, SIGNAGE AND WAYFINDING, HAND AND GUARDS RAILS) TO MAKE THE GARAGE COMPLETE WITHIN THIS AREA. THE BASE BID PLUS ADD ALTERNATE A, B AND C GARAGE AREA IS SHOWN ON THE SHEET FOR CONTINUITY AND CONNECTION UNDERSTANDING ONLY.
SEE ALT. AS SHOWN ON SHEETS (SF301, AE152, MM104, PP105CD, EA104CD) AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 28 CALENDAR DAYS FOR THIS ALTERNATE.
ADD ALTERNATE E: ADDITIONAL LANDSCAPE DESIGN AS SHOWN ON SHEET LP102 AND ALL ASSOCIATED DETAILS. CONTRACT TIME SHALL BE 7 CALENDAR DAYS FOR THIS ALTERNATE.
TOTAL CONSTRUCTION TIME SHALL BE EXTENDED TO A TOTAL OF 460 CALENDAR DAYS IF ALL ADD ALTERNATES ARE AWARDED.
STATEMENT OF BID ITEMS LEGEND
A
X
B
C
D
E
SEE GI105 FOR ADDITIONAL INFORMATION
ADD ALTERNATES
BASE BID WORK INCLUDES NECESSARY REMOVAL OF EXISTING STRUCTURE AND APPURTENANCES FOR GENERAL CONSTRUCTION, ALTERATIONS, ROADS, WALKS, GRADING, DRAINAGE, LABOR, MATERIAL, AND EQUIPMENT TO CONSTRUCT THE GARAGE STRUCTURE, ELECTRICAL AND IT EXTENSIONS, ELEVATORS, STAIRS, SIGNAGE AND CERTAIN OTHER ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.
CONTRACTOR SHALL HAVE 90 CALENDAR DAYS FROM THE CONSTRUCTION NOTICE TO PROCEED TO SUBMIT AND RECEIVE APPROVALS OF ALL SUBMITTALS. ONCE APPROVALS ARE OBTAINED, THE CONTRACTOR WILL HAVE 120 CALENDAR DAYS TO CONSTRUCT THE VERTICAL EXPANSION. ONCE THE VERTICAL EXPANSION IS COMPLETED, THE CONTRACTOR WILL HAVE 180 CALENDAR DAYS TO COMPLETE THE HORIZONTAL EXPANSION AND ALL REMAINING WORK. SEE GI106, CC002, AND CC003 FOR FURTHER PHASING REQUIREMENTS FOR THIS PROJECT. THE TOTAL CONTRACT TIME FOR THE BASE BID IS 390
CALENDAR DAYS.
LEVEL 4
EL 134'-0"
LEVEL 3
EL 122'-8"
LEVEL 2
EL 111'-4"
LEVEL 1
EL 100'-0"
ISOMETRIC KEY PLAN
SHADE INDICATES EXISTING GARAGE
ADD ALT AREA 'A'
ADD ALT AREA 'B'
ADD ALT AREA 'C'
SOLID WHITE AREA INDICATES BASE BID GARAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \d v a lla n d in g h a m
\D o c u m e n ts \1
.1
.0
A
V
A C o lu m b ia v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7 /2
:1
:1
P
M
GI105
ADD ALTERNATES
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 AO TS
CONSTRUCTION
DOCUMENTS
SCALE: 1/16" = 1'-0"GI105
1 ADD ALTERNATES - LEVEL 4
PROJECT PHASES
PHASE 1 (NOT SHOWN ON THIS SHEET.)
• REFER TO CIVIL SHEET CC002 FOR THE EXTENT OF WORK TO BE
COMPLETED. EXISTING GARAGE TO REMAIN OPEN FOR PUBLIC ACCESS.
• ALL SUBMITTALS, REVIEWS, AND APPROVALS SHALL BE COMPLETED
DURING PHASE 1 AND PRIOR TO BEGINNING OF PHASE 2, INCLUDING
ELEVATOR AND PRECAST SUBMITTALS.
PHASE 2
• CONTRACTOR SHALL BEGIN THIS PHASE BY SECURING THE SITE WITH A
CONSTRUCTION FENCE AND SCREENING AS INDICATED ON SHEET CC002
FOR EXTERIOR FENCING AND INSTALLING THE SITE CONSTRUCTION SIGN.
• CONTRACTOR SHALL MOBILIZE AND RESEARCH / INVESTIGATE EXISTING
CONDITIONS AND ALL UTILITIES (NEW AND ONES TO BE RELOCATED) AT THE
SITE.
• PROTECT FALL DETERRENT, REMOVE AND REINSTALL LIGHT POLES, CALL
BOXES, AND ANY OTHER APPURTENANCES AS NECESSARY TO READY THE
GARAGE FOR VERTICAL EXPANSION. THE CONTRACTOR IS RESPONSIBLE
FOR THE PROTECTION OF ALL REMOVED ITEMS UNTIL IT IS TO BE
REINSTALLED. CONTRACTOR HAS THE OPTION TO REMOVE, STORE, AND
REINSTALL THESE ITEMS DURING PHASE 4, BEFORE MOVING TO PHASE 5.
• INCLUDE SIGNAGE AT ENTRANCES AND ELEVATOR TO INDICATE LEVEL 2 IS
NOT ADA ACCESSIBLE DUE TO NON-FUNCTIONING ELEVATOR.
• DURING THIS PHASE, THE CONTRACTOR SHALL REMOVE THE EXISTING ROOF
AS REQUIRED FOR THE VERTICAL EXPANSION. THE CONTRACTOR SHALL
PROVIDE A TEMPORARY ROOF TO PROTECT ALL ELEMENTS OF STAIR
TOWER, ELEVATOR SHAFT AND MACHINE ROOM AS INDICATED IN DETAIL 11
THIS SHEET. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES TO ALL
ITEMS COVERED UNDER THE DURATION OF THE TEMPORARY ROOF.
• THE END RESULT OF PHASE 2 IS FOR THE ROOF TO BE REMOVED AND
PREPPED FOR PHASE 4 VERTICAL EXPANSION. THE CONTRACTOR TO
ENSURE AREAS INDICATED ON PLAN FOR PARKING ON LEVEL 2 IS
ACCESSIBLE TO THE PUBLIC IN A SAFE MANNER.
• COR SHALL VISUALLY INSPECT PRECAST PIECES AT THE PLANT FOR
COMPLIANCE BEFORE CONTRACTOR CAN MOVE TO PHASE 3. CONTRACTOR
SHALL SUBMIT DOCUMENTATION THAT ALL PRECAST FOR THE VERTICAL
EXPANSION IS READY FOR SHIPMENT TO THE PROJECT BEFORE THE COR
PERFORMS THE PLANT INSPECTION.
PHASE 3 (NOT SHOWN ON THIS SHEET.)
• CONTRACTOR TO SHUT DOWN PUBLIC ACCESS TO GARAGE FOR THIS
PHASE. COR SHALL INSPECT PANELS PRIOR TO ROAD CLOSURE PERMIT AND
GARAGE CLOSURE.
• DURING THIS PHASE, THE CONTRACTOR SHALL CONSTRUCT AND ERECT
PRECAST PANELS FOR THE VERTICAL EXPANSION ON LEVEL 4.
• THE CONTRACTOR SHALL REINSTALL THE SALVAGED LIGHT POLES AND ANY
OTHER APPERTANCES AT THE NEW TOP LEVEL OF THE GARAGE.
• INTERIOR FINISH WORK (I.E. - ELECTRICAL, IT, ELEVATORS, STRIPING,
SIGNAGE, ETC.) TO BE COMPLETED IN PHASE 4.
• CONSTRUCTION DURATION SHALL BE ACCORDING TO GENERAL
REQUIREMENTS SPECIFICATION.
• E. WOODLANDS TO REMAIN OPEN, EXCEPT FOR 14 DAY PRECAST INSTALL
PHASE 4
• GARAGE TO BE OPENED FOR PUBLIC PARKING UP TO LEVEL 2 AS INDICATED
ON THIS SHEET.
• CONTRACTOR TO FINISH INTERIOR OF GARAGE IN ORDER TO COMPLETE
THIS PHASE.
• THE END STATE OF THIS PHASE IS A FULLY FUNCTIONING 4-STORY PARKING
GARAGE; INCLUSIVE OF SIGNAGE, STRIPING, LIGHTING, FALL DETERRENT,
ELECTRICAL, IT AND ALL FINISH ITEMS. ELEVATOR WILL BE FULLY
FUNCTIONAL AT THE COMPLETION OF THIS PHASE.
• CONSTRUCTION DURATION SHALL BE ACCORDING TO GENERAL
REQUIREMENTS SPECIFICATION.
• COMPLETE ELEVATORS.
• ONLY THE VERTICAL EXPANSION PORTION OF THE GARAGE IS TO BE
OPENED FOR PUBLIC USE AT THE END OF THIS PHASE.
• COR SHALL VISUALLY INSPECT PRECAST PIECES AT THE PLANT FOR
COMPLIANCE BEFORE CONTRACTOR CAN MOVE TO PHASE 5. CONTRACTOR
SHALL SUBMIT DOCUMENTATION THAT ALL REMAINING PRECAST IS READY
FOR SHIPMENT TO THE PROJECT BEFORE THE COR PERFORMS THE PLANT
INSPECTION.
PHASE 5
• SEE SHEET CC003 FOR NEW CONSTRUCTION FENCING LIMITS.
• THE CONTRACTOR TO ENSURE THAT THE PARKING AREAS ON ALL LEVELS
NEXT TO THE PHASE 5 HORIZONTAL EXPANSION TO BE INACCESSIBLE TO
THE PUBLIC. ALL OTHER PARKING AS NOTED ON ALL LEVEL SHALL BE
ACCESSIBLE TO THE PUBLIC IN A SAFE MANNER.
• CONTRACTOR SHALL PROVIDE VEHICULAR AND PEDESTRIAN BARRICADES
FOR DURATION OF THIS PHASE BETWEEN THE BUILT GARAGE AND
HORIZONTAL EXPANSION
• THE CONTRACTOR SHALL CONTINUE CIVIL WORK AS NOTED ON CIVIL
SHEETS.
• DURING THIS PHASE, THE CONTRACTOR WILL COMPLETE ALL WORK TO
CONSTRUCT ALL LEVELS OF THE HORIZONTAL EXPANSION AS NOTED.
• CONTRACTOR TO FINISH ALL INTERIOR WORK FOR THE HORIZONTAL
EXPANSION.
• COMPLETE EXTERIOR SITE WORK.
• END STATE OF THIS PHASE IS A FULLY FUNCTIONING PARKING GARAGE.
PHASING LEGEND
PROJECT GENERAL NOTES
1. WHEN PUBLIC ACCESS IS ADJACENT, ABOVE OR BELOW CONSTRUCTION
ACTIVITIES, PROVIDE TEMPORARY SEPARATION; I.E. FENCING AND
SCREENING WITHIN LEVELS AND AT STAIRWELLS TO ISOLATE CONSTRUCTION
ACTIVITES.
2. WHEN SPACES ARE OPEN FOR PUBLIC ACCESS AND PARKING, AREAS TO BE
LIT WITH PERMANENT LIGHTING AND ALL CONSTRUCTION MATERIALS, TOOLS,
ETC. SHALL BE CLEAR OF ALL PUBLIC ACCESS.
3. TEMPORARY ROOF ENCLOSURES SHALL BE PROVIDED OF TREATED 2X AND
PLYWOOD MEMBERS, AND 60 MIL. THICK MEMBRANES MIN. RE: 11/GI106
CONSTRUCTION ZONE. NO PUBLIC ACCESS
NO PUBLIC ACCESS
OPEN FOR PUBLIC ACCESS AND PARKING
BARRICADE (RE: 9/GI106)
TEMPORARY PEDESTRIAN GATE (RE: 10/GI106)
2 12
A
C
2 12
A
C
2 12 13 14 19
A
C
JERSEY BARRIER
2 12 13 14 19
A
C
JERSEY BARRIER
2 12 13 14 19
A
C
JERSEY BARRIER
2 12 13 14
A
C
JERSEY BARRIER AT LEVEL 3 BELOW - BASE BID
JERSEY BARRIER AT LEVEL 4 - ADD ALT B AND C
** NOTE: DOWEL, LINK AND PIN AS REQUIRED
CHAINLINK GATE AND LATCH
CHAINLINK FENCE
2 12
A
C
2 12
A
C
TEMPORARY MEMBRANE.
SECURE OVER ALL
EXPOSED PORTIONS OF
OPEN ROOF PER
SPECIFICATIONS
3/4" PLYWOOD
2X TREATED ROOF
STRUCTURE
EXISTING STRUCTURE
MIN. SLOPE 1/4" PER FT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \d v a lla n d in g h a m
\D o c u m e n ts \1
.1
.0
A
V
A C o lu m b ia v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/1 /2
:4
:0
P
M
GI106
PHASING NOTES AND DIAGRAMS
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 AO TS
CONSTRUCTION
DOCUMENTS
SCALE: 1" = 50'-0"GI106
1 LEVEL 1 PHASE 2 AND 4
SCALE: 1" = 50'-0"GI106
2 LEVEL 2 PHASE 2 AND 4
SCALE: 1" = 50'-0"GI106
5 LEVEL 1 PHASE 5
SCALE: 1" = 50'-0"GI106
6 LEVEL 2 PHASE 5
SCALE: 1" = 50'-0"GI106
7 LEVEL 3 PHASE 5
SCALE: 1" = 50'-0"GI106
8 LEVEL 4 PHASE 5
NOT TO SCALEGI106
9 JERSEY BARRIER
NOT TO SCALEGI106
10 PEDESTRIAN GATE
NOTE PHASE 1 IS NOT PICURED THIS SHEET
PHASE 2 AND 4 DIAGRAMS
PHASE 5 DIAGRAMS
PHASE 3 DIAGRAM
SCALE: 1" = 50'-0"GI106
3 LEVEL 3 PHASE 2 AND 4
SCALE: 1" = 50'-0"GI106
4 LEVEL 1 PHASE 3
SCALE: 1/2" = 1'-0"GI106
11 TEMPORARY ROOF STRUCTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
N ot es a nd
D et ai ls
.d w g 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
CC001
GENERAL NOTES
FUTURE CLINIC
BUILDING
THIS AREA WILL BE UNDER CONSTRUCTION
CONCURRENTLY WITH THE GARAGE
CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
P ha si ng P la n.
dw g
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
0 6030
N
CC002
PHASING PLAN - PHASES 1, 2, 3,
AND 4
DETOUR DETOUR
CONSTRUCTION
ROAD
AHEAD
CONSTRUCTION
END
FLAGGER
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
P ha si ng P la n.
dw g
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
N
0 4020
CC003
PHASING PLAN - PHASE 5
M
M
M
THIS AREA WILL BE UNDER CONSTRUCTION
CONCURRENTLY WITH THE GARAGE
CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
D em ol iti on
P la n.
dw g 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
0 4020
N
CD101
DEMOLITION PLAN
THIS AREA WILL BE UNDER CONSTRUCTION
CONCURRENTLY WITH THE GARAGE
CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
S ite P la n.
dw g
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
0 4020
N
CS101
SITE PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
N ot es a nd
D et ai ls
.d w g 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
CS501
SITE DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
G ra di ng P la n.
dw g
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
0 4020
N
CG101
GRADING PLAN
M
M
M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
U til ity
P la n.
dw g 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
0 4020
N
CU101
UTILITY PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
P:
\1
7.
VA
C ol um bi a
- A E
ID
IQ
\1 7.
.0
- G ar ag e
Ex pa ns io n\ 2.
D ra w in gs \2
-2 _C iv il\
.1
8.
N ot es a nd
D et ai ls
.d w g 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GUIDON DESIGN
1221 N. PENNSYLVANIA ST. STE. 200
INDIANAPOLIS, INDIANA 46202
317-800-6388
STACEY PAUL
Consultant:
MES GROUP
550 N. REO STREET STE.203
TAMPA, FLORIDA, 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
Columbia, SC
544-330
Project Director
09/25/2019 SLP DWCRevisions: Date:
CU501
UTILITY DETAILS
Phone (888) 344-9044 Fax (423) 826-2112 2705 Kanasita Drive, Chattanooga, TN 37343
STORMWATER TREATMENT SOLUTIONS
www.aquashieldinc.com Aqua-Swirl Concentrator Model AS-4 CFD PCS Standard Detail
AS-4 PCS STD
01/20/11 Scale:
Drawn By:
Document:
Date:
JCW
1:20
U.S. Patent No. 6524473 and other Patent Pending
* Please see accompanied Aqua-Swirl specification notes.
* See Site Plan for actual system orientation.
A
Outlet
Pipe coupling by Contractor.
12" [305 mm] long Stub-out by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .