This document contains a foundation plan and structural details for a parking expansion project at the Veterans Affairs facility in Columbia, South Carolina. The plan provides specifications for cast-in-place concrete foundations including spread footings ranging from 8 to 14 feet wide, pile caps, grade beams, and slabs-on-grade. It also includes schedules for reinforced concrete and masonry walls, columns, and concrete reinforcing. The related federal contract opportunity is a solicitation issued by the U.S. Army Corps of Engineers Charleston District for construction services for the parking expansion. Proposals are due no later than May 3, 2021. The opportunity is available to all offerors and no specific industry categories or socioeconomic set-asides apply.

View the file

Other files

File Type Posted
D.03 Award Notice 21C4000 8.30.21.pdf PDF
B.08 Memorandum Amendment 0005 21R4003 5.20.21.pdf PDF
B.08 Amendment 0005 21R4003 5.20.21.pdf PDF
A.02 Amendment 0005 09 54 23 - Linear Metal Ceilings 21R4003 5.20.21.pdf PDF
B.08 Memorandum Amendment Four 21R4003 5.13.21.pdf PDF
07 24 00 - Exterior Insulation and Finish Systems.pdf PDF
00 01 10 - TOC.pdf PDF
2021-04-19 - Structural Revised Sheets.pdf PDF
2021-04-19 - General and Architectural Revised Sheets.pdf PDF
00 01 15 - List of Drawings.pdf PDF
B.08 Amendment Four 21R4003 5.13.21.pdf PDF
07_84_00_-_Firestopping..pdf PDF
AE601 Signage Schedule Stripping and Details.pdf PDF
Revised Bid Schedule page 5 of 79.pdf PDF
2017.1058.02 - 21.04.23-VA COLUMBIA - GARAGE ADDITION - Revision 2 (002).pdf PDF
Parking Garage Project Device and Conduit Plan.pdf PDF
B.08 Final Amendment Three 21R4003 5.6.21.pdf PDF
B.08 Amendment Two 21R4003 4.29.21.pdf PDF
B.08 Amendment One 21R4003 4.21.21.pdf PDF
A.02 Amendment One Attachement Spec Revision 21R4003 4.21.21.pdf PDF
B.08 Site Visit Sign In Sheet 21R4003 4.21.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.xlsx XLSX spreadsheet
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL II 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA SPECIFICATIONS - VOL I with Div1 Rev 021021 4.1.21.pdf PDF
A.02 UFGS4288 21R4003 4.1.21.txt TXT text file
B.08 VA Columbia Parking Expansion Solicitation 21R4003 4.1.21.pdf PDF
A.02 17.1058.02 - RTA CD DRAWINGS Revised 21R4003 4.1.21.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 15 16 17 18 19

A

B

C

SF301

4'

178' - 0"

3' - 0" 36' - 0" 24' - 0" 12' - 0" 36' - 0" 36' - 0" 34' - 0"

EXISTING SPREAD FOOTING

EXISTING SPREAD FOOTING

EXISTING SPREAD FOOTING

EXISTING COLUMN

GARAGE EXPANSIONEXISTING GARAGE

1 \ SF302

SF

SF

15.5

RAMMED AGGREGATE

PIERS PER 3RD PARTY

DESIGN, TYP. REFER TO

GEOTECHNICAL REPORT

F8.0 F11.0

F8.0

F13.0 F13.0 F10.0

F14.0

F10.0

F13.0F13.0F13.0F13.0

SF401

SB501

SB501

0"

3'

WF24

CW10

C W

C

W

W F

C W

W F

C W

W F

W

F

T/FTG = 97' - 0" (FV)

T/FTG = 96' - 0" T/FTG = 95' - 6" T/FTG = 95' - 0"

94' - 0"

T/FTG = 94' - 0"

CW10CW10

WF24

CW10

WF24

CW10

WF24 WF24

PCSW01

P C

S W

P C

S W

C1 C1 C1 C1 C1

C1C1

T/FTG = 94' - 6"

T/FTG = 94' - 0"

93' - 3"

T/FTG = 95' - 0"

95' - 6" (FV)

98' - 0" (FV)

T/FTG = 94' - 6"

C1

C2C1C1C1C1

C2

C1

M A

T C

H L

IN

E

SF301A

T/FTG = 94' - 0"T/FTG = 94' - 6"

T/FTG = 95' - 0"T/FTG = 95' - 6"

T/FTG = 96' - 0"

WF12X4 WF12X4

WF12X4

SB501

T/FTG = 94' - 6"

T/FTG = 94' - 0"

T/FTG = 93' - 6"

T/FTG = 93' - 6"

T/FTG = 94' - 6"

T/WALL 99' - 6"

T/WALL 99' - 6"

T/WALL 99' - 6"

T/WALL 99' - 6"

T/WALL = 103'-8" T/WALL = 103'-2"

T/WALL = 102'-8"

T/WALL = 102'-2" T/WALL = 101'-8"

5' - 7" 6' - 5"

6' - 5" 5' - 7"

6'

6'

" 28

SF503

SIM.

SB501

BOLLARD, TYPICAL

15.6C.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

09/25/20

P

.1

V A

C o lu m b ia

A

E I

D

IQ

\1 .1

.0

G a ra g e

E x p a n s io n \2

D ra w in g s \2

-3

S tr u c tu ra l\

-1

R e v it \1

.1

.0

S

V

A C o lu m b ia v

.r v t

/3

/2

:4

:2

A

M

SB101

FOUNDATION PLAN

GUIDON DESIGN

1221 N. PENNSYLVANIA AVE

INDIANAPOLIS, IN 46202

317-800-6388

STACEY PAUL

MES GROUP

550 NORTH REO STREET STE. 203

TAMPA, FLORIDA 33609

813-289-4700

LEE HILL

CORRECT PARKING SITE

DEFICIENCIES

COLUMBIA, SC

544-330

12/09/2020 LAI WJT

CONSTRUCTION

DOCUMENTS

SCALE: 3/32" = 1'-0"SB101

1 FOUNDATION PLAN N

NOTES:

1. REFERENCE FINISH FLOOR ELEVATION = 100'-0". ELEVATION 100'-0" = USGS 249.67' (SEE CIVIL)

2. SEE SI001 FOR ABBREVIATIONS, SYMBOLS AND LEGENDS

3. SEE SI002 FOR STRUCTURAL GENERAL NOTES

4. SEE SI003 FOR STRUCTURAL DESIGN LOAD INFORMATION

5. REFERENCE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND SIZES OF DOOR OPENINGS, STAIRS, DOWNSPOUTS, ETC...

6. T/FTG EL. 98'-0" U.N.O.

7. "FV" = FIELD VERIFY

COLUMN FOOTING SCHEDULE

MARK

FOOTING SIZE

REINFORCEMENT REMARKS

WIDTH LENGTH DEPTH

F8.0 8' - 0" 8' - 0" 1' - 6" #5 BARS @ 9" O.C. BOTH WAYS, BOTT

F10.0 10' - 0" 10' - 0" 2' - 0" #6 BARS @ 10" O.C. BOTH WAYS, BOTT

F11.0 11' - 0" 11' - 0" 1' - 6" #7 BARS @ 12" O.C. BOTH WAYS, BOTT

F13.0 13' - 0" 13' - 0" 2' - 6" #7 BARS @ 10" O.C. BOTH WAYS, BOTT

F14.0 14' - 0" 14' - 0" 2' - 6" #7 BARS @ 9" O.C. BOTH WAYS, BOTT

WALL FOOTING SCHEDULE

MARK WIDTH THICKNESS REINFORCEMENT REMARKS

WF12X4 12' - 0" 4' - 0" #8 BARS @ 12" LONG AND @18" TRANSV. TOP & BOTT

WF24 2' - 0" 1' - 6" 3 - #5 BARS CONT., #5 BARS @ 12" O.C. TRANSVERSE

CONCRETE WALL SCHEDULE

MARK WIDTH REINFORCEMENT REMARKS

CW10 10" #5 @ 12" O.C. HORIZONTAL, #5 @ 12" O.C. VERTICAL BOTH FACES.

MASONRY WALL SCHEDULE

MARK WIDTH REINFORCEMENT REMARKS

MW8 7 5/8"

COLUMN SCHEDULE

MARK SIZE

C1 24x30

C2 30x30

C3 24x24 MAT SLAB SCHEDULE

TYPE THICKNESS REINFORCEMENT

24" MAT FDN #6 @ 12" EACH WAY TOP AND BOTT

Revisions: Date:

REVISION 4- ADD FOUNDATION LOADS 2021/04/30

UNFACTORED FOUNDATION LOADS

14A 15A 15.5A 16A 17A 18A 19A 14B 15B 15-18B 18B 19B 14C 15C 16C 17C 18C 19C

15K/FT

19C

8K/FT

DEAD (K)COLUMN LIVE (K)

Sheets
SB101 - FOUNDATION PLAN

File details come from the government source that posted it. Updated .