Rev 4 SB101 - FOUNDATION PLAN.pdf
PDF 329 KB Posted
- Solicitation number
- W912HP21R4003
About this file
This document contains a foundation plan and structural details for a parking expansion project at the Veterans Affairs facility in Columbia, South Carolina. The plan provides specifications for cast-in-place concrete foundations including spread footings ranging from 8 to 14 feet wide, pile caps, grade beams, and slabs-on-grade. It also includes schedules for reinforced concrete and masonry walls, columns, and concrete reinforcing. The related federal contract opportunity is a solicitation issued by the U.S. Army Corps of Engineers Charleston District for construction services for the parking expansion. Proposals are due no later than May 3, 2021. The opportunity is available to all offerors and no specific industry categories or socioeconomic set-asides apply.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14 15 16 17 18 19
A
B
C
SF301
4'
178' - 0"
3' - 0" 36' - 0" 24' - 0" 12' - 0" 36' - 0" 36' - 0" 34' - 0"
EXISTING SPREAD FOOTING
EXISTING SPREAD FOOTING
EXISTING SPREAD FOOTING
EXISTING COLUMN
GARAGE EXPANSIONEXISTING GARAGE
1 \ SF302
SF
SF
15.5
RAMMED AGGREGATE
PIERS PER 3RD PARTY
DESIGN, TYP. REFER TO
GEOTECHNICAL REPORT
F8.0 F11.0
F8.0
F13.0 F13.0 F10.0
F14.0
F10.0
F13.0F13.0F13.0F13.0
SF401
SB501
SB501
0"
3'
WF24
CW10
C W
C
W
W F
C W
W F
C W
W F
W
F
T/FTG = 97' - 0" (FV)
T/FTG = 96' - 0" T/FTG = 95' - 6" T/FTG = 95' - 0"
94' - 0"
T/FTG = 94' - 0"
CW10CW10
WF24
CW10
WF24
CW10
WF24 WF24
PCSW01
P C
S W
P C
S W
C1 C1 C1 C1 C1
C1C1
T/FTG = 94' - 6"
T/FTG = 94' - 0"
93' - 3"
T/FTG = 95' - 0"
95' - 6" (FV)
98' - 0" (FV)
T/FTG = 94' - 6"
C1
C2C1C1C1C1
C2
C1
M A
T C
H L
IN
E
SF301A
T/FTG = 94' - 0"T/FTG = 94' - 6"
T/FTG = 95' - 0"T/FTG = 95' - 6"
T/FTG = 96' - 0"
WF12X4 WF12X4
WF12X4
SB501
T/FTG = 94' - 6"
T/FTG = 94' - 0"
T/FTG = 93' - 6"
T/FTG = 93' - 6"
T/FTG = 94' - 6"
T/WALL 99' - 6"
T/WALL 99' - 6"
T/WALL 99' - 6"
T/WALL 99' - 6"
T/WALL = 103'-8" T/WALL = 103'-2"
T/WALL = 102'-8"
T/WALL = 102'-2" T/WALL = 101'-8"
5' - 7" 6' - 5"
6' - 5" 5' - 7"
6'
6'
" 28
SF503
SIM.
SB501
BOLLARD, TYPICAL
15.6C.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
09/25/20
P
.1
V A
C o lu m b ia
A
E I
D
IQ
\1 .1
.0
G a ra g e
E x p a n s io n \2
D ra w in g s \2
-3
S tr u c tu ra l\
-1
R e v it \1
.1
.0
S
V
A C o lu m b ia v
.r v t
/3
/2
:4
:2
A
M
SB101
FOUNDATION PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA AVE
INDIANAPOLIS, IN 46202
317-800-6388
STACEY PAUL
MES GROUP
550 NORTH REO STREET STE. 203
TAMPA, FLORIDA 33609
813-289-4700
LEE HILL
CORRECT PARKING SITE
DEFICIENCIES
COLUMBIA, SC
544-330
12/09/2020 LAI WJT
CONSTRUCTION
DOCUMENTS
SCALE: 3/32" = 1'-0"SB101
1 FOUNDATION PLAN N
NOTES:
1. REFERENCE FINISH FLOOR ELEVATION = 100'-0". ELEVATION 100'-0" = USGS 249.67' (SEE CIVIL)
2. SEE SI001 FOR ABBREVIATIONS, SYMBOLS AND LEGENDS
3. SEE SI002 FOR STRUCTURAL GENERAL NOTES
4. SEE SI003 FOR STRUCTURAL DESIGN LOAD INFORMATION
5. REFERENCE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND SIZES OF DOOR OPENINGS, STAIRS, DOWNSPOUTS, ETC...
6. T/FTG EL. 98'-0" U.N.O.
7. "FV" = FIELD VERIFY
COLUMN FOOTING SCHEDULE
MARK
FOOTING SIZE
REINFORCEMENT REMARKS
WIDTH LENGTH DEPTH
F8.0 8' - 0" 8' - 0" 1' - 6" #5 BARS @ 9" O.C. BOTH WAYS, BOTT
F10.0 10' - 0" 10' - 0" 2' - 0" #6 BARS @ 10" O.C. BOTH WAYS, BOTT
F11.0 11' - 0" 11' - 0" 1' - 6" #7 BARS @ 12" O.C. BOTH WAYS, BOTT
F13.0 13' - 0" 13' - 0" 2' - 6" #7 BARS @ 10" O.C. BOTH WAYS, BOTT
F14.0 14' - 0" 14' - 0" 2' - 6" #7 BARS @ 9" O.C. BOTH WAYS, BOTT
WALL FOOTING SCHEDULE
MARK WIDTH THICKNESS REINFORCEMENT REMARKS
WF12X4 12' - 0" 4' - 0" #8 BARS @ 12" LONG AND @18" TRANSV. TOP & BOTT
WF24 2' - 0" 1' - 6" 3 - #5 BARS CONT., #5 BARS @ 12" O.C. TRANSVERSE
CONCRETE WALL SCHEDULE
MARK WIDTH REINFORCEMENT REMARKS
CW10 10" #5 @ 12" O.C. HORIZONTAL, #5 @ 12" O.C. VERTICAL BOTH FACES.
MASONRY WALL SCHEDULE
MARK WIDTH REINFORCEMENT REMARKS
MW8 7 5/8"
COLUMN SCHEDULE
MARK SIZE
C1 24x30
C2 30x30
C3 24x24 MAT SLAB SCHEDULE
TYPE THICKNESS REINFORCEMENT
24" MAT FDN #6 @ 12" EACH WAY TOP AND BOTT
Revisions: Date:
REVISION 4- ADD FOUNDATION LOADS 2021/04/30
UNFACTORED FOUNDATION LOADS
14A 15A 15.5A 16A 17A 18A 19A 14B 15B 15-18B 18B 19B 14C 15C 16C 17C 18C 19C
15K/FT
19C
8K/FT
DEAD (K)COLUMN LIVE (K)
| Sheets |
| SB101 - FOUNDATION PLAN |
File details come from the government source that posted it. Updated .