Attach 9 Seed Project Aircraft Parking Apron Price Schedule (Euros revised 12NOV2020).xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- W912GB21R0002
- Issued by
-
Department of the Army European Command
About this file
This document contains a price schedule for construction services for an aircraft parking apron at Campia Turzii Air Base in Romania. The schedule includes line items for the base work of constructing the aircraft parking apron pavement and shoulders, edge lighting, taxiway H pavement and shoulders, and supporting facilities. It also contains optional line items for demolition of existing facilities and installation of blast deflectors, taxiway, flood lighting, and airfield lighting vault air conditioning. Pricing is in Euros. The period of performance for all items is according to the clause in the solicitation. Liquidated damages also correspond to the solicitation clause. The government reserves the right to award optional items within 180 days of contract award.
The related federal contract opportunity is a revised one-step Design-Bid-Build solicitation for multiple award task order contracts for construction of new facilities and repair and maintenance in Romania. The Army is the contracting agency.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| PRICE SCHEDULE |
| EDI AIRCRAFT PARKING APRON |
| CÂMPIA TURZII AIR BASE |
| ROMANIA |
| Offerors shall provide pricing for all base and option items. |
The following items include providing all labor, materials, equipment, and services necessary to complete construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
| Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items | ||||
| Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Request for Proposal for the liquidated damages for all base and option items. | ||||
| Option Items: The Government reserves the right to award the options up to 180 calendar days from contact award. | ||||
| Item No. | Description | Quantity | Unit | Amount |
| BASE ITEM | ||||
| 0001 | Parking Apron - Pavement, Shoulders, and Utilities | 1 | Job | € |
| 0002 | Parking Apron - Edge Lighting | 1 | Job | € |
| 0003 | Taxiway H - Pavement, Shoulders, and Utilities | 1 | Job | € |
| 0004 | Taxiway H - Edge Lighting | 1 | Job | € |
| 0005 | Supporting Facilities | 1 | Job | € |
| Sum of CLIN Base Items 0001 - 0005 | € - | |||
| OPTION ITEMS | ||||
| 0006 | Option 1 - Demolish Existing Host Nation Trim Pad and Stone Blast Deflectors | 1 | Job | € |
| 0007 | Option 2 - Demolish USAFE Ground Data Terminal (GDT) concrete pads and anchor pads | 1 | Job | € |
| 0008 | Option 3 - Install Blast Deflectors Along Northeast Side of Apron | 1 | Job | € |
| 0009 | Option 4 - Install Blast Deflectors Along Southeast Side of Apron | 1 | Job | € |
| 0010 | Option 5 - Install Ladder Taxiway G | 1 | Job | € |
| 0011 | Option 6 - Install Flood Lighting for the Parking Apron | 1 | Job | € |
| 0012 | Option 7 - Install Split Unit AC in Airfield Lighting Vault | 1 | Job | € |
| 0013 | Option 8 - ILCMS Controller | 1 | Job | € |
| Sum of CLIN Option Items 0006 thru 0013 | € - | |||
| Total of all Base and Option Items | € - |
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
- END OF PROPOSAL SCHEDULE -