Amend 0005_Attachment 9 - 100 Final_EDI Apron Romania_PRICE SCHEDULE.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- W912GB21R0002
- Issued by
-
Department of the Army European Command
About this file
This price schedule document outlines pricing requirements for a construction contract opportunity issued by the Department of the Army European Command. The solicitation seeks pricing for the construction of an aircraft parking apron, taxiway, supporting facilities and utilities at Campia Turzii Air Base in Romania. Offerors must provide unit pricing and extended pricing for eight base items including pavement construction, edge lighting, and support facilities. The solicitation also includes pricing for thirteen option items such as demolishing existing structures, installing blast deflectors, lighting upgrades, and HVAC work. Pricing must be provided for all line items and is subject to government verification, with the unit price taking precedence over any extended total in the event of a discrepancy.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| PRICE SCHEDULE |
| EDI AIRCRAFT PARKING APRON |
| CÂMPIA TURZII AIR BASE |
| ROMANIA |
| Offerors shall provide pricing for all base and option items. |
The following items include providing all labor, materials, equipment, and services necessary to complete the construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
| Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items. | |||||
| Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Request for Proposal for the liquidated damages for all base and option items. | |||||
| Option Items: The Government reserves the right to award the options up to 180 calendar days from contact award. | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Amount |
| BASE ITEM | |||||
| 0001 | Parking Apron - Pavement and Shoulders | 1 | Job | € - 0 | € - 0 |
| 0002 | Parking Apron - Edge Lighting | 1 | Job | € - 0 | € - 0 |
| 0003 | Taxiway H - Pavement and Shoulders | 1 | Job | € - 0 | € - 0 |
| 0004 | Taxiway H - Edge Lighting | 1 | Job | € - 0 | € - 0 |
| 0005 | Supporting Facilities, Utilities | 1 | Job | € - 0 | € - 0 |
| Total of Base Items 0001 - 0005 | € - 0 | ||||
| OPTION ITEMS | |||||
| 0006 | Option 1 - Demolish Existing Host Nation Trim Pad and Stone Blast Deflectors | 1 | Job | € - 0 | € - 0 |
| 0007 | Option 2 - Demolish USAFE Ground Data Terminal (GDT) concrete pads and anchor pads | 1 | Job | € - 0 | € - 0 |
| 0008 | Option 3 - Install Blast Deflectors and Concrete Foundations Along Northeast Side of Apron | 1 | Job | € - 0 | € - 0 |
| 0009 | Option 4 - Install Blast Deflectors and Concrete Foundations Along Southeast Side of Apron | 1 | Job | € - 0 | € - 0 |
| 0010 | Option 5 - Install Ladder Taxiway G | 1 | Job | € - 0 | € - 0 |
| 0011 | Option 6 - Install Flood Lighting for the Parking Apron | 1 | Job | € - 0 | € - 0 |
| 0012 | Option 7 - Install Split Unit AC in Airfield Lighting Vault | 1 | Job | € - 0 | € - 0 |
| 0013 | Option 8 - Individual Lamp Control and Monitoring System (ILCMS) Upgrade | 1 | Job | € - 0 | € - 0 |
| Total of Option Items 0006 - 0013 | € - 0 | ||||
| Total of all Base and Option Items | € - 0 |
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
- END OF PROPOSAL SCHEDULE -
File details come from the government source that posted it. Updated .