A2Contractor_Past_Experience_Information_Sheet_Final.docx

DOCX document 39 KB Posted

Attached to
FY19 SCIF MATOC Federal contract opportunity
Solicitation number
W912GB19R0027
Issued by
Department of the Army Corps of Engineers Engineering District Europe

About this file

This solicitation is for an Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract to provide Sensitive Compartmented Information Facility construction services. The contract will be awarded to at least two U.S. firms to design-build or design-bid-build new SCIFs or renovate existing SCIFs in Germany, Belgium, Poland, Romania or Estonia. Work may include excavation, plumbing, demolition, electrical, structural, mechanical and concrete construction. Offerors must have or be able to obtain a Facility Clearance. The evaluation criteria are past performance, management approach, architect-engineering team, a seed project narrative, and seed project price. Proposals are due by July 17, 2019. The total contract value across awardees is not to exceed $49.9 million over three years. Award will be made to responsible offerors whose proposals represent the best value based on an assessment of the evaluation factors.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to FY19 SCIF MATOC, newest first.
File Type Posted
B.08.03_19R0027_Am-0001_SF30_FINAL.pdf PDF
B.08.03_A2_Contractor_Past_Experience_Information_Sheet_Am-0001.docx DOCX document
B.08.03_Pre-proposal_conference_sign_in_sheet_Am-0001.pdf PDF
B.08.03_A7_BidBond_Form_SF24.pdf PDF
B.08.03_Responses_to_RFIs_Am-0001_FINAL.pdf PDF
B.08.03_Pre-proposal_conference_slides_FINAL_Am-0001.pdf PDF
01_32_16.pdf PDF
Construction_Signs_(DE).pdf PDF
01_45_10.pdf PDF
A6_ProjNet_Instructions.pdf PDF
00_74_00.pdf PDF
ICS_705_Technical-Specifications-SCIF-Construction.pdf PDF
01_78_00.pdf PDF
00_74_02.pdf PDF
01_32_01.pdf PDF
A3USACEPastPerformanceQuestionnaire.docx DOCX document
01_33_00.pdf PDF
ICS-705-1.pdf PDF
A4AE_Experience_FINAL.docx DOCX document
01_33_16.pdf PDF
01_30_00.pdf PDF
01_45_05.pdf PDF
01_45_00.pdf PDF
ABPRICING_SCHEDULE.XLSX XLSX spreadsheet
01_45_01.pdf PDF
00_74_19.pdf PDF
A1Contractor_Past_Experience_Overview_Sheet_Final.docx DOCX document
Construction_Signs_(EN).pdf PDF
A5SAMPLE_LETTER_OF_COMMITMENT.pdf PDF
W912GB19R0027_FINAL.pdf PDF
01_30_05.pdf PDF
01_35_26.pdf PDF
01_78_23.pdf PDF
00_74_10.pdf PDF
FCL_Orientation_Handbook_10OCT18.pdf PDF
00_74_18.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

FY19 SCIF Construction MATOC

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:

Experience:

1. The location work was performed Outside the Continental United States (OCONUS). Note: project performed within the European Union will be considered more relevant, while projects in Germany, Belgium, Poland, Romania, or Estonia will be considered most relevant: ___________________________________

2. The day, month, and year work was completed; work must not be earlier than 2013: _______________

3. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for projects in at least one of the following categories:

a.Design-Build construction projects
b.New Construction or Renovations of Buildings that demonstrate experience with Sensitive Compartmented Information Facilities (SCIFs) in compliance with ICD 705 standards;
d.Replacement to include major building systems (electrical, mechanical, structural, etc) repaired or replaced;

NOTE: The prime contractor must have performed at least three (3) of the five (5) projects submitted for Factor 1 AND two (2) of the five (5) projects submitted must be SCIF construction. This aspect is a pass/fail element. In case of a Joint Venture, the work must have been performed by at least one of the JV partners. Offerors who do not meet this minimum requirement are not eligible for award.

(Continue typing if required to provide more information)

ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

6. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

File details come from the government source that posted it. Updated .