Instructions Attachment 2 - ExperienceInfoSheet.docx
DOCX document 39 KB Posted
- Attached to
- Improve Runway and Support Infrastructure Federal contract opportunity
- Solicitation number
- W912GB-17-R-0036
About this file
Instructions Attachment 2
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
Improve Airfield Support Infrastructure, Lask Airbase, Poland
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed, work in Poland will be considered more relevant: ___________________________________
2. The day, month, and year work was completed; work should not be earlier than ten years from the date of the solicitation: _______________
3. The final cost of this project, should be between €5,000,000 and €50,000,000: €_________________________
4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
5. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:
| a. | New concrete airfield paving, including subbase, (greater than 2000 m2) and drainage (grading, large area storm drainage, etc.); |
| b. | New asphalt airfield paving, including subbase, (greater than 2000 m2 ) and drainage (grading, large area storm drainage, etc.); |
| c. | Heavy construction of civil work systems to include but not limited to (hardstand paving, large area storm drainage, site work, electrical, utilities, mechanical, site investigations, demolition, deforestation, etc.); |
| d. | Other airfield runway work: resurfacing existing airfield pavement, grooving, pavement markings, navigation aids, approach lighting, arresting gear installation, etc. |
(Continue typing if required to provide more information)
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.
6. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
File details come from the government source that posted it. Updated .