Instructions Attachment 2 - ExperienceInfoSheet.docx

DOCX document 39 KB Posted

Attached to
Improve Runway and Support Infrastructure Federal contract opportunity
Solicitation number
W912GB-17-R-0036
Issued by
Department of the Army Corps of Engineers Engineering District Europe

About this file

Instructions Attachment 2

View the file

Other files for this federal contract opportunity

Other files attached to Improve Runway and Support Infrastructure, newest first.
File Type Posted
Amendment_03.pdf PDF
Revised Sheet E-103_RFI.PDF PDF
Revised Lask Spec 01 50 00.pdf PDF
Soil Boring Logs.pdf PDF
VAT_SOP_ FINAL.pdf PDF
New Lask Spec 26 56 23.pdf PDF
VAT Poland Tax bilingual form.pdf PDF
Amendment 02.pdf PDF
Revised Lask Spec 03 30 53.pdf PDF
GEOTECHNICAL - ENGLISH_100%_REV01.pdf PDF
Revised Lask Spec 01 45 01.01 Additional Quality Control Personnel.pdf PDF
PreProposal_Slides_Runway_Improvement,_Lask_AB,_Poland_11_May_2017.ppt PPT presentation
Site_Visit_Sign_In_Roster.pdf PDF
Amendment_01_-_Clause_Update.pdf PDF
Instructions Attachment 4 - Price Schedule Lask AB Poland_01 May17.pdf PDF
Solicitation_W912GB-17-R-0036_Airfield,_Lask_AB_Poland.pdf PDF
Instructions Attachment 5 - Site Visit Information - Lask Directions.pdf PDF
Attachment B1 - Section B-000_100%_REV01_DRAWINGS.pdf PDF
Instructions Attachment 1- ExperienceOverviewSheet.docx DOCX document
Attachment B4 - Section G-000_100%_REV01_DRAWINGS.pdf PDF
Attachment B5 - Section V-000_100%_REV01_DRAWINGS.pdf PDF
Attachment B2 - Section C-000_100%_REV01_DRAWINGS.pdf PDF
Instructions Attachment 3 - PastPerformanceClientForm.docx DOCX document
Attachment A - SOW Lask AB Poland_ 01010.pdf PDF
Attachment B3 - Section CU-000_100%_REV01_DRAWINGS.pdf PDF
Attachment_B6_-_Section_E-000_100__REV01_DRAWINGS.pdf PDF
Instructions Attachment 6 - Site Visit Poland Base Access Information.xlsx XLSX spreadsheet
Instructions Attachment 7 - VAT_Procedures.pdf PDF
SPECIFICATIONS_100_Lask AB_REV01A.pdf PDF
Site_Visit_Poland_Base_Access_Information.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

Improve Airfield Support Infrastructure, Lask Airbase, Poland

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:

Experience:

1. The location work was performed, work in Poland will be considered more relevant: ___________________________________

2. The day, month, and year work was completed; work should not be earlier than ten years from the date of the solicitation: _______________

3. The final cost of this project, should be between €5,000,000 and €50,000,000: €_________________________

4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower

5. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:

a.New concrete airfield paving, including subbase, (greater than 2000 m2) and drainage (grading, large area storm drainage, etc.);
b.New asphalt airfield paving, including subbase, (greater than 2000 m2 ) and drainage (grading, large area storm drainage, etc.);
c.Heavy construction of civil work systems to include but not limited to (hardstand paving, large area storm drainage, site work, electrical, utilities, mechanical, site investigations, demolition, deforestation, etc.);
d.Other airfield runway work: resurfacing existing airfield pavement, grooving, pavement markings, navigation aids, approach lighting, arresting gear installation, etc.

(Continue typing if required to provide more information)

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

6. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

File details come from the government source that posted it. Updated .