This is a Cost Breakdown form for RFP P2 # 509974 for the Apache Mission Alert Complex construction project located at AASAB, Kuwait under federal contract W912ER26RA016.
The cost breakdown template is designed for proposers to itemize construction costs across 22 work items organized into a base bid (Items 0001-0017) and five optional bid items (Items 0018-0022). Base bid items include mobilization/demobilization, site survey, and construction of four alert shelters, a logistics readiness center, maintenance supply warehouse, guard house, parking sunshade, pilot readiness center, petroleum oil lubricant shed, three substations, storage shade, wash rack sunshade, fire water pump house with water tank, bunkers, forward arming and refueling point (FARP) with rocket and missile barricade option, taxiway construction, and site development and utilities. Each item requires cost breakdown by direct labor cost, direct equipment cost, direct materials cost, subcontractor cost, job overhead (JOOH), and home office overhead (HOOH), with columns for bond and profit calculations. Optional items include an alert magazine, west side diamond rehabilitation, hardened aircraft shelter (HAS) demolition, FARP expansion with barricade option, and a paved access road to the practice runway. The template provides a summary line for total base bid price and total options price, with a final combined total.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST BREAKDOWN
RFP: P2 # 509974
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0.00
0001 Mobilization / Demobilization
0001AA Mobilization
0001AB Demobilization
Total Price (Items 0001AA - 0001AB)
0002 Site Survey
0002AA Site Survey
Total Price (Item 0002AA)
Construct Alert Shelters in accordance with the contract documents
0003AA Alert Shelter #1 Substructure
0003AB Alert Shelter #1 Shell
0003AC Alert Shelter #1 Interiors
0003AD Alert Shelter #1 Fire Protection
0003AE Alert Shelter #1 Plumbing
0003AF Alert Shelter #1 Mechanical
0003AG Alert Shelter #1 Electrical
0003AH Alert Shelter #1 Telecommunications
0003AJ
Alert Shelter #1 Furniture, Fixtures, and Equipment
0003AK Alert Shelter #2
0003AL Alert Shelter #3
0003AM Alert Shelter #4
Total Price (Items 0003AA - 0003AM)
Construct Logistics Readiness Center in accordance with the contract documents
0004AA Substructure
0004AB Shell
0004AC Interiors
W912ER26RA016
EXHIBIT 1 Page 1 of 7
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0.00
0004AD Fire Protection
0004AE Plumbing
0004AF Mechanical
0004AG Electrical
0004AH Telecommunications
Total Price (Items 0004AA - 0004AH)
Construct Maintenance Supply Warehouse in accordance with the contract documents
0005AA Substructure
0005AB Shell
0005AC Interiors
0005AD Fire Protection
0005AE Plumbing
0005AF Mechanical
0005AG Electrical
0005AH Telecommunications
0005AJ Furniture, Fixtures, and Equipment
0005AK Exterior Improvements
Total Price (Items 0005AA - 0005AK)
Construct Guard House in accordance with the contract documents
0006AA Substructure
0006AB Shell
0006AC Interiors
0006AD Plumbing
0006AE Mechanical
0006AF Electrical
0006AG Telecommunications
EXHIBIT 1 Page 2 of 7
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0006AH Furniture, Fixtures, and Equipment
Total Price (Items 0006AA - 0006AH)
Construct Parking Sunshade, Single Row in accordance with the contract documents
0007AA Substructure
0007AB Shell
0007AC Electrical
Total Price (Items 0007AA - 0007AC)
Construct Pilot Readiness Center in accordance with the contract documents
0008AA Substructure
0008AB Shell
0008AC Interiors
0008AD Fire Protection
0008AE Plumbing
0008AF Mechanical
0008AG Electrical
0008AH Telecommunications
0008AJ Furniture, Fixtures, and Equipment
Total Price (Items 0008AA - 0008AJ)
Construct Petroleum Oil Lubricant Shed in accordance with the contract documents
0009AA Substructure
0009AB Shell
0009AC Interiors
0009AD Fire Protection
0009AE Mechanical
0009AF Electrical
EXHIBIT 1 Page 3 of 7
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0009AG Furniture, Fixtures, and Equipment
Total Price (Items 0009AA - 0009AG)
Construct Substations in accordance with the contract documents
0010AA Substation #1
0010AB Substation #2
0010AC Substation #3
Total Price (Items 0010AA - 0010AC)
Construct Storage Shade in accordance with the contract documents
0011AA Storage Shade
0011AB Electrical
Total Price (Items 0011AA - 0011AB)
Construct Wash Rack Sunshade in accordance with the contract documents
0012AA Substructure
0012AB Shell
Total Price (Items 0012AA - 0012AB)
Construct Fire Water Pump House with Water Tank in accordance with the contract documents
0013AA Substructure
0013AB Shell
0013AC
Fire Water Pumps with Valves and Piping
0013AD Services
0013AE Water Tank
Total Price (Items 0013AA - 0013AE)
Construct Bunkers in accordance with the contract documents
EXHIBIT 1 Page 4 of 7
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0014AA Bunker
0014AB Shotcrete
0014AC T-Walls
Total Price (Items 0014AA - 0014AC)
Construct Forward Arming and Refueling Point with Rocket and Missile Barricade Option in accordance with the contract documents
0015AA
Forward Arming and Refueling Point
(FARP)
0015AB
Rocket or Missile Barricade Option
(RAMBO)
Total Price (Items 0015AA - 0015AB)
Construct Taxiway from Existing Maintenance Hangar to New Facilities in accordance with the contract documents
0016AA Demolish Existing Taxiway
0016AB Construct New Taxiway
Total Price (Items 0016AA - 0016AB)
Site Development and Utilities in accordance with the contract documents
0017AA Staging / Contractor Laydown Area
0017AB Temporary Work
0017AC Earthworks
0017AD Demolition
0017AE Site Work and Improvements
0017AF Site Electrical
0017AG Site Sanitary and Sewer
0017AH Site Telecommunications
0017AJ Site Domestic Water
0017AK Site Storm Sewer
0017AL Site Fire Protection
0017AM Asphalt Pavement
EXHIBIT 1 Page 5 of 7
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0017AN Concrete Apron Pavement
0017AP Asphalt Shoulders Pavement
0017AQ Asphalt Access
0017AR Taxiway Edge Lighting
Total Price (Items 0017AA - 0017AR)
Optional Bid Items
Option 1 - Construct Alert Magazine in accordance with the contract documents
0018AA Temporary Work
0018AB Site Development
0018AC Substructure
0018AD Shell
0018AE Interiors
0018AF Mechanical
0018AG Electrical
0018AH Telecommunications
Total Option Price (Items 0018AA -
0018AH)
Option 2- Rehab West Side of Diamond in accordance with the contract documents
0019AA Temporary Work
0019AB Site Development
0019AC Rehab West Side of Diamond
Total Option Price (Items 0019AA -
0019AC)
Option 3 - Demolish Hardened Aircraft Shelters (HAS) in accordance with the contract documents
Total Base Bid Price (ITEMS 0001 - 0017)
EXHIBIT 1 Page 6 of 7
PROJECT: Apache Mission Alert Complex
PROPOSER:
LOCATION: AASAB, Kuwait DATE:
ITEM DESCRIPTION UOM Quantity
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL DIRECT
COST
TOTAL JOOH
COST
TOTAL HOOH
COST
BOND PROFIT
TOTAL PROPOSED
COST
% Used % Used % Used % Used
0020AA Temporary Work
0020AB Site Development
0020AC Demolition
Total Option Price (Items 0020AA -
0020AC)
Option 4 - Construct Forward Arming and Refueling Point Expansion with Rocket and Missile Barricade Option in accordance with the contract documents
0021AA Temporary Work
0021AB Site Development
0021AC
Forward Arming and Refueling Point (FARP) Expansion
0021AD
Rocket or Missile Barricade Option
(RAMBO)
Total Option Price (Items 0021AA -
0021AD)
Option 5 - Construct Paved Access Road to Practice Runway in accordance with the contract documents
0022AA Design
0022AB Temporary Work
0022AC Site Development
0022AD Paved Access Road
Total Option Price (Items 0022AA -
0022AD)
TOTAL OPTIONS PRICE (ITEMS 0018 - 0022)
Total Base Bid + Options Price (ITEMS 0001 - 0022)