UD 2.4 - Package 1 LSA, Jordan 463243LSA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK Revised by Amendment 0001 01 14 00 WORK RESTRICTIONS Revised by Amendment 0001
01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 19.05 20 POST AWARD MEETINGS REVISED BY AMENDMENT 0002
01 32 18.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) FOR
DESIGN-BUILD
01 33 00 SUBMITTAL PROCEDURES
01 33 00.12 10 SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECT Revised by
Amendment 0002
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 75 01.00 40 PLANT EQUIPMENT TESTING, FACILITY STARTUP AND
COMMISSIONING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 80 00.12 10 TECHNICAL REQUIREMENTS Revised by Amendment 0005
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 40 00 COLD-FORMED METAL FRAMING Added by Amendment 0003
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION Revised by Amendment 0004
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 55 00 PROTECTED MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
PROJECT TABLE OF CONTENTS Page 1 W912ER18R0004 Amendment 0005
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS Revised by Amendment 0004 08 71 00 DOOR HARDWARE Revised by Amendment 0004
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 00 PORTLAND CEMENT PLASTERING Added by Amendment 0003
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 51 00 FURNITURE, FURNISHINGS AND EQUIPMENT (FFE)
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS Revised by Amendment 0002
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 23 00 REFRIGERANT PIPING
23 82 43.00 40 ELECTRIC DUCT HEATERS
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 11 16 SECONDARY UNIT SUBSTATIONS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
PROJECT TABLE OF CONTENTS Page 2
26 41 00 LIGHTNING PROTECTION SYSTEM
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76.11 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM FOR
INFORMATION TRANSFER NODE (ITN) BUILDING
28 31 76.12 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM FOR FIRE
PUMP BUILDING
28 31 76.13 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM FOR PUMP
BUILDING
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 00 05 LAGOON CONSTRUCTION
31 32 12 SOIL STABILIZATION SYSTEM
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 SUBBASE COURSE
32 11 23 AGGREGATE BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 15 00 AGGREGATE SURFACE COURSE
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERS
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORM DRAINAGE UTILITIES
33 47 13 POND AND RESERVOIR LINERS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION Revised by Amendment
33 72 02 UNDERGROUND COMMUNICATION SYSTEM
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.19 ACTIVE VEHICLE BARRIERS
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 14 LAGOON AERATION EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 61 PAGES
UD 2.4 - Package 1 LSA, Jordan
01 14 00 SD-01 Preconstruction Submittals
1.4.9 G M/RPersonnel and Vehicular Access
Plan
1.4.1.1 G M/RList of Contact Personnel
01 15 00.12 10 SD-01 Preconstruction Submittals
1.3 G M/RForeign Objects Damage (FOD)
Control Plan
1.2 G M/RProof of Degrees and Licensing
1.4.1 G M/RSite Security Plan
1.5.2 G M/RRequests for Digging Permits
1.7 G M/RProposed Means of Providing
Project Security
1.19.2 G M/RRequests for Hot Work Permits
SD-07 Certificates
1.8Certificates Of Compliance
SD-11 Closeout Submittals
G M/RReports and Records
01 31 19.05 20 SD-01 Preconstruction Submittals
1.3.6 G M/RProject Schedule
01 32 18.12 10 SD-01 Preconstruction Submittals
1.5 G M/RQualifications
1.3 G M/RDesign Baseline Network
Analysis Schedule
1.3 G M/RConstruction Baseline Network
Analysis Schedule
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 61 PAGES
01 32 18.12 10 1.7.4 G MMonthly Network Analysis
SD-11 Closeout Submittals
1.7.5 G M/RAs-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
1.9 G M/RSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G M/RAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G MAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
License Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G M/RContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3Construction Site Plan
G; M/R
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 61 PAGES
01 50 00 Traffic Control Plan
01 58 00 SD-02 Shop Drawings
1.4.1Sign Legend Orders
G; M/R
01 75 01.00 40 SD-03 Product Data
G MPreliminary Facility Startup and
Performance Demonstration Plan
G MFinal Facility Startup and
Performance Demonstration Plan
G MFunctional and Performance Test
Results
Completed Unit Process Startup
Forms for each unit process
Completed Facility Performance
Demonstration/Certification Form
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 G ROperation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 61 PAGES
01 78 00 3.1As-Built Drawings
G; M/R
3.2.1Record Drawings
3.3Record Drawings
3.6 G M/RAs-Built Record of Equipment
and Materials
3.4 G M/RFinal Approved Shop Drawings
3.5 G M/RConstruction Contract
Specifications
01 78 23 SD-10 Operation and Maintenance
Data
1.4 G M/RO&M Database
3.1.1 G M/RTraining Plan
3.1.3 G M/RTraining Outline
3.1.2 G M/RTraining Content
SD-11 Closeout Submittals
3.1.4 G M/RTraining Video Recording
3.1.6 G M/RValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G M/RCommissioning Firm
1.7.1 G M/RLead Commissioning Specialist
1.7.2 G M/RTechnical Commissioning
Specialists
G M/RCommissioning Firm's Contract
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 61 PAGES
01 91 00.15 3.1.2 G MDesign Phase Commissioning
Plan
SD-06 Test Reports
3.2.3 G MDesign Review Report
3.2.2.1 G MInterim Construction Phase
Commissioning Plan
3.2.2.2 G MFinal Construction Phase
Commissioning Plan
3.2.2.1.3 G MTemplate Building Envelope
Inspection Checklists
G MBuilding Envelope Inspection
Checklists
3.2.4.2 G MPre-Functional Checklists
1.8Issues Log
3.3 G MCommissioning Report
3.4.1 G MPost-Construction Trend Log
Report
SD-07 Certificates
1.9 G MCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2.5 G RTraining Plan
3.2.5 G RTraining Attendance Rosters
3.2.6 G MSystems Manual
3.2.7 G RMaintenance and Service Life
Plans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 61 PAGES
01 91 00.15 SD-11 Closeout Submittals
3.2.2.1Construction Phase
Commissioning Plan
M/R
3.3 G M/RFinal Commissioning Report
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G MFormwork
3.1.1 G MFormwork
2.2.1 G MForm Removal Schedule
SD-03 Product Data
2.2Form Materials
SD-05 Design Data
Calculations; G, M
SD-06 Test Reports
3.2Inspection
03 15 00.00 10 SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
03 20 00.00 10 SD-02 Shop Drawings
3.1 G MReinforcement
SD-07 Certificates
2.3Reinforcing Steel
03 30 00.00 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 61 PAGES
03 30 00.00 10 1.5.2 G M/RQuality Control Plan
1.5.1Laboratory Accreditation
3.7.5.4 G M/RSampling Plan
SD-03 Product Data
Part 2Recycled Content Products
2.2Cementitious Materials
2.10Vapor Retarder
2.11Vapor Barrier
2.1.5Floor Finish
Floor Hardener
2.4Chemical Admixtures
SD-04 Samples
2.4.5Surface Retarder
SD-05 Design Data
2.1.1 G MMixture Proportions
SD-06 Test Reports
2.1.1 G MMixture Proportions
3.7 G MTesting and Inspection for CQC
2.2.4Fly Ash
2.2.7Ground Granulated Blast-Furnace
(GGBF) Slag
2.3Aggregates
3.7.5.1Air Content
3.7.5.2Slump
3.7.5.4Compressive Strength
2.5Water
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 61 PAGES
03 30 00.00 10 SD-07 Certificates
1.5Contractor Quality Control personnel
3.2.1Ready-Mix Plant
03 35 00.00 10 SD-03 Product Data
Recycled Content Products
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.1.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 G MStandard Precast Units
2.1.2 G MCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 G MDesign Calculations
2.1.5.1Concrete Mix Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 61 PAGES
03 42 13.00 10 SD-06 Test Reports
1.3.1.4Test Reports
SD-07 Certificates
1.3.1.2Quality Control Procedures
04 20 00 SD-02 Shop Drawings
3.3.2.1 G MCut CMU
3.4.1.1 G MDetail Drawings
SD-03 Product Data
1.5.1 G MHot Weather Procedures
1.5.2 G MCold Weather Procedures
2.2.2.2.1 G MCement
2.4.1.1 G MCementitious Materials
SD-04 Samples
1.3.1.1 G RMock-Up Panel
2.2.2.2 G RConcrete Masonry Units (CMU)
2.4.1.4 G RAdmixtures for Masonry Mortar
2.6.2 G RAnchors, Ties, and Bar
Positioners
2.6.3 G RJoint Reinforcement
SD-05 Design Data
2.1.2 G MMasonry Compressive Strength
3.2.4 G MBracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 61 PAGES
04 20 00 SD-07 Certificates
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8 G RTake-Back Program
05 05 23.16 SD-01 Preconstruction Submittals
3.2 G MWelding Quality Assurance Plan
SD-03 Product Data
1.3Welding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification
1.3.6Inspector Qualification
1.3.2Previous Qualifications
1.3.3Pre-qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3 G MNondestructive Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 61 PAGES
05 05 23.16 SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
05 40 00 SD-02 Shop Drawings
1.6.1 G M/RFraming Components
SD-03 Product Data
2.1Studs, Joists
05 50 13 SD-02 Shop Drawings
2.4Angles and Plates
G. M
07 21 13 SD-03 Product Data
1.3Manufacturer's Standard Details
2.1Block or Board Insulation
2.2Pressure Sensitive Tape
1.4Protection Board or Coatings
2.4Accessories
SD-07 Certificates
2.1Block or Board Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 61 PAGES
07 21 13 Vapor Retarder
2.3Protection Board or Coating
3.4.4Protection Board or Coating
1.7Special Warranties
1.7Special Warranties
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.4.1Adhesive
07 52 00 SD-02 Shop Drawings
1.4.6 G MRoof plan
SD-03 Product Data
2.1 G MModified Bitumen Sheets
Asphalt
2.1 G MFiberglass Felt
2.4 G MPrimer
2.5 G MModified Bitumen Roof Cement
Pre-Manufactured Accessories
2.7 G MFasteners And Plates
1.9 G MWarranty
SD-05 Design Data
1.4.5 G MWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3Qualification of Engineer of
Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 61 PAGES
07 52 00 1.5.1Bill of Lading
1.4.5 G MWind Uplift Resistance
1.4.4 G MFire Resistance
SD-08 Manufacturer’s Instructions
3.3.6 G MModified Bitumen Membrane
Application
3.3.7 G MFlashing
Temperature Limitations for
Asphalt
Torches
G MCold Adhesive Applied Modified
Bitumen Membrane
2.4Primer
2.7.1Fasteners
3.3.4Ventilating Base Sheets
SD-11 Closeout Submittals
1.9Warranty
3.8Information Card
3.7Instructions To Government
Personnel
07 55 00 SD-02 Shop Drawings
1.2.1 G MRoof Assembly
SD-07 Certificates
1.4.1Material and Equipment
Energy Efficiency
1.4.2Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 61 PAGES
07 60 00 SD-02 Shop Drawings
3.1.15 G MGutters
3.1.16 G MDownspouts
3.1.13 G MGravel stops and fascias
3.1.20 G MSplash pans
3.1.17 G MFlashing for roof drains
3.1.10 G MBase flashing
3.1.11 G MCounterflashing
3.1.23 G MFlashing at roof penetrations
3.1.12 G MReglets
3.1.18 G MScuppers
G MCopings
3.1.14 G MDrip edge
3.1.19Conductor heads
3.1.21 G MOpen valley flashing
3.1.22 G MEave flashing
SD-11 Closeout Submittals
3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 G MFirestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3 G MInspection
SD-07 Certificates
1.5.2Inspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 61 PAGES
07 84 00 2.2Firestopping Materials
1.5.1 G MInstaller Qualifications
07 92 00 SD-03 Product Data
2.2Sealants
2.3Primers
2.4Bond Breakers
2.5Backstops
3.1 G MField Adhesion
SD-07 Certificates
Indoor Air Quality
SD-11 Closeout Submittals
2.2.1 G MIndoor Air Quality For Interior
Sealants
2.2.3 G MIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 G MIndoor Air Quality For Interior
Acoustical Sealants
G MIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 G MDoors
2.1 G MDoors
2.5 G MFrames
2.5 G MFrames
2.3 G MAccessories
2.7 G MWeatherstripping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 61 PAGES
08 11 13 SD-03 Product Data
2.1 G MDoors
2.5 G MFrames
2.3Accessories
2.7Weatherstripping
08 14 00 SD-02 Shop Drawings
2.2 G MDoors
SD-03 Product Data
2.2 G MDoors
2.3Accessories
2.4.7Water-resistant Sealer
1.4Warranty
G MSound Transmission Class
Rating
G MFire Resistance Rating
SD-04 Samples
2.2 G RDoors
G RDoor Finish Colors
SD-06 Test Reports
2.5Cycle-Slam
Hinge Loading Resistance
SD-11 Closeout Submittals
1.4Warranty
08 51 13 SD-02 Shop Drawings
2.2 G MWindows
1.10 G MFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 61 PAGES
08 51 13 SD-03 Product Data
2.2Windows
2.3.8.1Hardware
2.3.3Fasteners
1.11Window Performance
2.5Thermal-Barrier Windows
2.6Mullions
2.3.10Screens
2.3.2Weatherstripping
2.3.8Accessories
2.3.4Adhesives
1.11.5Thermal Performance
SD-04 Samples
1.4.2.1 G RFinish Sample
1.4.2.2 G RWindow Sample
SD-05 Design Data
2.2 G MStructural Calculations for
Deflection
1.4.3 G MDesign Analysis
SD-06 Test Reports
1.4.4 G MMinimum Condensation
Resistance Factor
1.4.4 G MResistance to Forced Entry
SD-10 Operation and Maintenance
Data
2.2 G RWindows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 61 PAGES
08 51 13 1.7Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 G MManufacturer's Detail Drawings
1.3 G MVerification of Existing Conditions
1.5 G MHardware Schedule
2.3.7 G MKeying System
SD-03 Product Data
2.3 G MHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 G RHardware Schedule
SD-11 Closeout Submittals
1.6.1 G M/RKey Bitting
08 81 00 SD-02 Shop Drawings
G MInstallation
SD-03 Product Data
1.6.1Insulating Glass
Plastic Glazing
1.3Glazing Accessories
SD-04 Samples
1.6.1 G RInsulating Glass
G RGlazing Compound
2.3.3 G RTape
2.3.1.1 G RSealant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 61 PAGES
08 81 00 SD-07 Certificates
1.6.1Insulating Glass
Tempered Glass
Laminated Glass
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
09 22 00 SD-02 Shop Drawings
2.1 G MMetal support systems
09 24 00 SD-03 Product Data
1.8Accessories
Metal plastering bases
Fasteners
Bonding compounds
Admixtures
SD-04 Samples
1.8Accessories
SD-07 Certificates
Installers qualifications
09 24 23 SD-02 Shop Drawings
3.3Lath
SD-03 Product Data
3.6Proportions and Mixing
SD-04 Samples
2.2Colored Stucco Finish Coat
1.3Sample Panel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 61 PAGES
09 29 00 SD-03 Product Data
Cementitious Backer Units
Glass Mat Water-Resistant
Gypsum Tile Backing Board
Water-Resistant Gypsum Backing
Board
2.1.2Abuse Resistant Gypsum Board
Accessories
1.3Certifications
2.1.1Gypsum Board
SD-04 Samples
G RPredecorated Gypsum Board
SD-08 Manufacturer’s Instructions
2.1Material Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 65 00 SD-02 Shop Drawings
2.7 G MResilient Flooring and
Accessories
SD-03 Product Data
2.1Wall Base
SD-04 Samples
2.7 G RResilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 61 PAGES
09 65 00 SD-06 Test Reports
3.3 G MMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.7 G RResilient Flooring and
Accessories
09 90 00 SD-02 Shop Drawings
3.8 G MPiping identification
3.8 G Mstencil
SD-03 Product Data
Certification
2.1 G MCoating
2.1Manufacturer's Technical Data
Sheets
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 G MQualification Testing
SD-08 Manufacturer’s Instructions
Application instructions
3.5.2Mixing
1.7.2Manufacturer's Material Safety
Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 61 PAGES
09 90 00 SD-10 Operation and Maintenance
Data
2.1 G RCoatings:
10 44 16 SD-01 Preconstruction Submittals
2.1.1 G M/RManufacturer's Data
SD-03 Product Data
2.1.1 G MFire Extinguishers
G MAccessories
Part 2 G MCabinets
G MWall Brackets
SD-07 Certificates
2.1.1 G MFire Extinguishers
2.1.1 G MManufacturer's Warranty with
Inspection Tag
12 51 00 SD-02 Shop Drawings
G MEquipment Systems
G MOverall Reference Drawings
G MInstallation drawings
SD-03 Product Data
G MEquipment Systems
G MSeating, Tables, Equipment
G MMiscellaneous Freestanding
Furniture
G MCertification
G MWarranty
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 61 PAGES
12 51 00 G MSeating Fabrics and Finishes
G MTable Laminates, Trim, Edges, Paints
G MEquipment Color, Finishes, Fabric
G MMiscellaneous Freestanding
Furniture Fabric, Paints and
Finishes
SD-08 Manufacturer’s Instructions
G RMaterial Safety Data Sheets
SD-10 Operation and Maintenance
Data
G RAssembly Manuals
G RMaintenance Manuals
G RCleaning
G RElectrical System
13 48 00 SD-02 Shop Drawings
3.1 G MBracing
3.4 G MResilient Vibration Isolation
Devices
2.1 G MEquipment Requirements
SD-03 Product Data
3.1 G MBracing
2.1 G MEquipment Requirements
SD-06 Test Reports
3.3 G MAnchor Bolts
13 48 00.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 61 PAGES
13 48 00.00 10 3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.1Equipment Requirements
1.2.4 G MContractor Designed Bracing
SD-03 Product Data
3.1 G MCoupling and Bracing
2.1 G MEquipment Requirements
1.2.4 G MContractor Designed Bracing
SD-07 Certificates
2.3Flexible Ball Joints
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 G MShop Drawings
3.9As-Built Drawings
SD-03 Product Data
1.4.1Fire Protection Related
Submittals
2.3 G MMaterials and Equipment
1.6Spare Parts
3.8 G MPreliminary Tests
3.9 G MFinal Acceptance Test
3.10 G MOnsite Training
1.4.1 G MFire Protection Specialist
1.4.2 G MSprinkler System Installer
SD-05 Design Data
1.4.3 G MSway Bracing
1.2.1.3 G MHydraulic Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 61 PAGES
21 13 13.00 10 SD-06 Test Reports
3.8Preliminary Test Report
3.9Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10 G ROperating and Maintenance
Manuals
21 30 00 SD-01 Preconstruction Submittals
1.3Fire Pump Installation Related
Submittals
1.7.1 G M/RFire Protection Specialist
SD-02 Shop Drawings
3.3.1 G MInstallation Drawings
3.10.2 G M/RAs-Built Drawings
3.3.2 G MPiping Layout
3.3.2 G MPump Room
SD-03 Product Data
2.1 G MCatalog Data
1.6Spare Parts
3.7.2Preliminary Tests
3.7 G MField Tests
1.7.6 G MManufacturer's Representative
3.10.1 G MField Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 61 PAGES
21 30 00 3.7.3Army Final Acceptance Test
SD-06 Test Reports
3.7.2Preliminary Tests
3.7.3Army Final Acceptance Test
SD-07 Certificates
1.7.1Fire Protection Specialist
1.7.2Qualifications of Welders
1.7.3Qualifications of Installer
1.7.4Preliminary Test Certification
1.7.5Final Test Certification
SD-10 Operation and Maintenance
Data
3.10.1 G ROperating and Maintenance
Instructions
2.13Flow Meter
22 00 00 SD-02 Shop Drawings
3.8.1 G MPlumbing System
SD-03 Product Data
2.4Fixtures
2.4.1Wall Hung Lavatories
2.8 G MWater Heaters
3.8.1.1 G MBackflow Prevention Assemblies
1.5.1Welding
3.4 G MVibration-Absorbing Features
3.8.1Plumbing System
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 61 PAGES
22 00 00 3.8Tests, Flushing and Disinfection
3.8.1.1 G MTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.8.1 G RPlumbing System
23 00 00 SD-02 Shop Drawings
1.3.5 G MDetail Drawings
SD-03 Product Data
2.9.1.1Metallic Flexible Duct
2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.9.1.2Duct Connectors
2.9.2 G MDuct Access Doors
2.9.3Fire Dampers
2.9.4 G MManual Balancing Dampers
2.9.5 G MManual Balancing Dampers
2.9.7Automatic Smoke-Fire Dampers
Sound Attenuation Equipment
2.9.10Acoustical Duct Liner
2.9.11.1Diffusers
Registers and Grilles
2.9.12Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 61 PAGES
23 00 00 2.10.1.1Centrifugal Fans
2.10.1.2In-Line Centrifugal Fans
2.10.1.4Ceiling Exhaust Fans
2.11 G MAir Handling Units
2.12.1 G MRoom Fan-Coil Units
1.3.6Test Procedures
G MDiagrams
SD-06 Test Reports
3.12 G MPerformance Tests
G MDamper Acceptance Test
SD-07 Certificates
Bolts
Certification
1.3.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.14.1 G ROperation and Maintenance
Manuals
2.9.3 G RFire Dampers
2.9.4 G RManual Balancing Dampers
2.9.5 G RManual Balancing Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 61 PAGES
23 00 00 2.9.7 G RAutomatic Smoke-Fire Dampers
G RAutomatic Smoke Dampers
2.10.1.1 G RCentrifugal Fans
2.10.1.2 G RIn-Line Centrifugal Fans
2.10.1.3 G RAir-Curtain Fans
2.10.1.4 G RCeiling Exhaust Fans
2.11 G RAir Handling Units
2.12.1 G RRoom Fan-Coil Units
23 05 93 SD-01 Preconstruction Submittals
1.3.2 G RRecords of Existing Conditions
1.3.2 G RRecords of Existing Conditions
1.5.1 G MIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 G MTAB Design Review Report
1.6.1.1 G MTAB Design Review Report
1.5.8.1 G MTAB Firm
1.2 G MTAB Team Assistants
1.2 G MTAB Team Engineer
1.5.8.2 G MTAB Specialist
1.2 G MTAB Team Field Leader
SD-02 Shop Drawings
1.3.2 G MTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 G MEquipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 61 PAGES
23 05 93 1.5.1.3 G MTAB Related HVAC Submittals
1.5.8.4 G MTAB Related HVAC Submittals
1.5.6 G MTAB Procedures
1.5.6 G MCalibration
1.3.2 G RSystems Readiness Check
1.5.9 G MTAB Execution
1.5.9.3 G RTAB Verification
SD-06 Test Reports
3.3.5 G RCompleted Pre-Final DALT
Report
3.3.8 G RCertified Final DALT Report
1.5.3.2 G RPrerequisite HVAC Work
Checkout List
1.5.3.2 G RPrerequisite HVAC Work
Checkout List
1.6.1 G RPrerequisite HVAC Work
Checkout List
1.6.1 G RPrerequisite HVAC Work
Checkout List
3.7 G MProportional Balancing
3.7 G MSeason 1
1.5.3.1 G MTAB Design Review Report
1.6.1.1 G MTAB Design Review Report
G MTAB Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 61 PAGES
23 05 93 1.5.1 G MIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 G RDALT and TAB Submittal and
Work Schedule
1.6.1 G RDALT and TAB Submittal and
Work Schedule
1.5.3.2 G RTAB Pre-Field Engineering
Report
1.6.1.3 G RTAB Pre-Field Engineering
Report
1.5.5 G MInstrument Calibration
Certificates
3.7 G MDALT and TAB Procedures
Summary
3.7 G RCompleted Pre-Final DALT Work
Checklist
3.3.2 G RAdvance Notice of Pre-Final
DALT Field Work
3.7 G RProportional Balancing
1.5.8.1 G MTAB Firm
1.3.2 G RDesign Review Report
1.6.1.2 G RPre-field DALT Preliminary
Notification
1.6.1 G RAdvanced Notice for TAB Field
Work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 61 PAGES
23 05 93 1.5.3.2 G RPrerequisite HVAC Work Check
Out List
1.6.1 G RPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
3.2.2.2 G MMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SD-03 Product Data
2.3 G MPipe Insulation Systems
3.2 G MPipe Insulation Systems
3.3 G MDuct Insulation Systems
3.4 G MEquipment Insulation Systems
SD-04 Samples
2.2.1.3 G RThermal Insulation
3.1.1 G RDisplay Samples
SD-08 Manufacturer’s Instructions
2.3 G MPipe Insulation Systems
3.2 G MPipe Insulation Systems
3.3 G MDuct Insulation Systems
3.4 G MEquipment Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 G MCommissioning Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 61 PAGES
23 08 00.00 10 3.2.1Pre-Functional Performance Test
Checklists
3.2.2Functional Performance Tests
SD-06 Test Reports
3.3 G MCommissioning Report
SD-07 Certificates
1.5.1Commissioning Firm
1.5.2Commissioning Specialist
23 23 00 SD-02 Shop Drawings
2.3 G MRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5 G RMaintenance
3.4 G ROperation and Maintenance
Manuals
3.4 G RDemonstrations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 61 PAGES
23 82 43.00 40 SD-02 Shop Drawings
1.2.1Fabrication Drawings
1.2.1 G MInstallation Drawings
SD-03 Product Data
2.1.1 G MPerformance Data
2.1 G MDuct Heaters
2.2.1 G MHeating Elements
2.2.1 G MEnclosures
2.2.2 G MControls
SD-08 Manufacturer’s Instructions
1.2.1Manufacturer's Instructions
23 82 46.00 40 SD-02 Shop Drawings
1.2.1Fabrication Drawings
SD-03 Product Data
2.1 G MPerformance Data
2.1 G MElectric Unit Heaters
2.2.1 G MHeating Element
2.2.2 G MControls
3.1.1 G MCasings
2.2.3 G MPropellers and Motors
SD-08 Manufacturer’s Instructions
1.2.1Manufacturer's Instructions
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 61 PAGES
26 05 48.00 10 3.2Lighting Fixtures in Buildings
GM
1.3 G MEquipment Requirements
1.2.4 G MContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 G MAcceptance tests and inspections
SD-07 Certificates
1.4.1 G MQualifications
1.4.3 G MAcceptance test and inspections
procedure
26 11 16 SD-02 Shop Drawings
1.5.1.1 G MUnit Substation Drawings
1.5.1.2 G MTransformer drawings
SD-03 Product Data
G MFuse curves
2.2 G MSecondary unit substation
2.2.2 G Mtransformer (liquid-filled)
SD-06 Test Reports
3.6.1 G MAcceptance checks and tests
SD-07 Certificates
1.5.2 G MPaint coating system
1.5.3 G MTransformer Losses
SD-09 Manufacturer’s Field
Reports
2.6.2 G MLoad Interrupter Switch
production tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 61 PAGES
26 11 16 2.6.3 G Mtransformer design tests
(liquid-filled)
2.6.4 G Mtransformer routine and other
tests (liquid-filled)
26 20 00 SD-02 Shop Drawings
2.13 G MPanelboards
2.17 G MTransformers
G MBusway
2.4 G MCable trays
G MMotor control centers
G MCommunication system conduit installation/routing
2.26 G MWireways
2.15 G MLoad centers for housing units
3.1.9.1 G MMarking strips
SD-03 Product Data
2.12Receptacles
2.13.3Circuit breakers
2.14.2Circuit breakers
2.15.2Circuit breakers
2.10Switches
2.17Transformers
Enclosed circuit breakers
2.19Motor controllers
Combination motor controllers
2.15Load centers for housing units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 61 PAGES
26 20 00 2.20Manual motor starters
2.14Residential load centers
2.27Metering
2.29Surge protective devices
G MCommunication system conduit
G MCommunication metal boxes
G MCommunication system ground bars
SD-06 Test Reports
3.5.2 G M600-volt wiring test
3.5.5 G MGrounding system test
3.5.3 G MTransformer tests
3.5.4 G MGround-fault receptacle test
SD-07 Certificates
2.11Fuses
SD-09 Manufacturer’s Field
Reports
2.31.1Transformer factory tests
26 28 01.00 10 SD-03 Product Data
2.10Fault Current Analysis
2.10Protective Device Coordination
Study
2.1Equipment
1.4.1System Coordinator
3.3.4Protective Relays
3.2Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 61 PAGES
26 28 01.00 10 SD-06 Test Reports
3.3Field Testing
SD-07 Certificates
Devices and Equipment
26 32 14.00 10 SD-02 Shop Drawings
1.4.6 G M/RDetailed Drawings
3.11 G M/RAcceptance
SD-03 Product Data
2.4Manufacturer's Catalog
3.10 G M/RInstructions
1.4.3Experience
1.4.4Field Engineer
1.4.2Site Welding
3.2General Installation
3.1Site Visit
SD-05 Design Data
2.8 G M/RSound Limitations
2.14Generator
2.5.4Integral Main Fuel Storage Tank
Day Tank
3.6.2.2Power Factor
2.7.2Heat Exchanger
2.18.5Time-Delay on Alarms
2.7Cooling System
1.2.5Vibration Isolation
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 61 PAGES
26 32 14.00 10 3.6.6Performance Tests
3.6 G M/ROnsite Inspection and Tests
SD-07 Certificates
1.2.5Vibration Isolation
3.4Prototype Tests
1.2.6Reliability…