AM5_Specifications_6_Apr_18.pdf

PDF 980 KB Posted

Attached to
Construct Critical Infrastructure Federal contract opportunity
Solicitation number
W912ER-18-R-0004
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Construct Critical Infrastructure, newest first.
File Type Posted
UD_2.4_PACKAGE_1_LSA_DRAWINGS2_AM005_06_APR_18.pdf PDF
W912ER18R0004-0005.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS1_AM005_06_APR_18.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS_AM004_04_APR_18.pdf PDF
W912ER18R0004-0004.pdf PDF
AM4_Specifications_4_Apr_18.pdf PDF
W912ER18R0004-0003.pdf PDF
AM3_Specifications_29_Mar_18.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS_AM002_26_MAR_18.pdf PDF
AM2_UD_2.4_-_Pkg_1_LSA_-_Cost_Breakdown_3-26-18_-_NO_COST_-_.pdf PDF
AM2_Specifications_26_Mar_18.pdf PDF
AM2_UD_2.4_-_Pkg_1_LSA_Bid_Schedule_-_3-26-18__.pdf PDF
W912ER18R0004-0002.pdf PDF
AM1_UD_2.4_-_Package_1_Pkg_1_LSA__Cost_Breakdown_3-13-18.pdf PDF
AM1_Specifications_13_Mar_18.pdf PDF
W912ER-18-R-0004-01_Conformed_Copy.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS_AM001_15_MAR_18.pdf PDF
W912ER-18-R-0004-01_Modificaion.pdf PDF
Volume_1_Attachment_A.pdf PDF
Volume_1_Attachment_B.pdf PDF
Volume_1_Attachment_D.xls XLS spreadsheet
Volume_1_of_3_Solicitation.pdf PDF
Volume_1_Attachment_C.pdf PDF
Volume_2_of_3_Specs_Div_01-12_8_Feb_18.pdf PDF
Volume_3_of_3_Specs_Div_13-44_5_Feb_18.pdf PDF
&_1575;&_1604;&_1602;&_1610;&_1575;&_1583;&_1607;_&_1575;&_1604;&_1593;&_1575;&_1605;&_1607;_&_1604;&_1604;&_1602;&_1608;&_1575;&_1578;_&_1575;&_1604;&_1605;&_1587;&_1604;&_1581;&_1607;_&_1575;&_1604;&_1575;&_1585;&_1583;&_1578;&_1610;&_1607;_(2)RJAF_Upda PDF
Copy_of_332_AEW_Vetting_Request_Worksheet_TEMPLATE.xlsx XLSX spreadsheet
Jordanian_Information_Form.pdf PDF
U.S._Contractor_Request_Template.xlsx XLSX spreadsheet
RJAF_DMS_Application_Blank.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UD 2.4 - Package 1 LSA, Jordan 463243LSA

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK Revised by Amendment 0001 01 14 00 WORK RESTRICTIONS Revised by Amendment 0001

01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 19.05 20 POST AWARD MEETINGS REVISED BY AMENDMENT 0002

01 32 18.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) FOR

DESIGN-BUILD

01 33 00 SUBMITTAL PROCEDURES

01 33 00.12 10 SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECT Revised by

Amendment 0002

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 75 01.00 40 PLANT EQUIPMENT TESTING, FACILITY STARTUP AND

COMMISSIONING

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 80 00.12 10 TECHNICAL REQUIREMENTS Revised by Amendment 0005

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 40 00 COLD-FORMED METAL FRAMING Added by Amendment 0003

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION Revised by Amendment 0004

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 55 00 PROTECTED MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

PROJECT TABLE OF CONTENTS Page 1 W912ER18R0004 Amendment 0005

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMINUM WINDOWS Revised by Amendment 0004 08 71 00 DOOR HARDWARE Revised by Amendment 0004

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 00 PORTLAND CEMENT PLASTERING Added by Amendment 0003

09 24 23 CEMENT STUCCO

09 29 00 GYPSUM BOARD

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 51 00 FURNITURE, FURNISHINGS AND EQUIPMENT (FFE)

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS Revised by Amendment 0002

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 23 00 REFRIGERANT PIPING

23 82 43.00 40 ELECTRIC DUCT HEATERS

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 11 16 SECONDARY UNIT SUBSTATIONS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

PROJECT TABLE OF CONTENTS Page 2

26 41 00 LIGHTNING PROTECTION SYSTEM

DIVISION 27 - COMMUNICATIONS

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76.11 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM FOR

INFORMATION TRANSFER NODE (ITN) BUILDING

28 31 76.12 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM FOR FIRE

PUMP BUILDING

28 31 76.13 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM FOR PUMP

BUILDING

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 00 05 LAGOON CONSTRUCTION

31 32 12 SOIL STABILIZATION SYSTEM

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 20 SUBBASE COURSE

32 11 23 AGGREGATE BASE COURSE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 15 00 AGGREGATE SURFACE COURSE

32 17 23 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 16 15 WATER STORAGE STEEL TANKS

33 30 00 SANITARY SEWERS

33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS

33 40 00 STORM DRAINAGE UTILITIES

33 47 13 POND AND RESERVOIR LINERS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION Revised by Amendment

33 72 02 UNDERGROUND COMMUNICATION SYSTEM

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 34 - TRANSPORTATION

34 71 13.19 ACTIVE VEHICLE BARRIERS

DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT

44 42 14 LAGOON AERATION EQUIPMENT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 61 PAGES

UD 2.4 - Package 1 LSA, Jordan

01 14 00 SD-01 Preconstruction Submittals

1.4.9 G M/RPersonnel and Vehicular Access

Plan

1.4.1.1 G M/RList of Contact Personnel

01 15 00.12 10 SD-01 Preconstruction Submittals

1.3 G M/RForeign Objects Damage (FOD)

Control Plan

1.2 G M/RProof of Degrees and Licensing

1.4.1 G M/RSite Security Plan

1.5.2 G M/RRequests for Digging Permits

1.7 G M/RProposed Means of Providing

Project Security

1.19.2 G M/RRequests for Hot Work Permits

SD-07 Certificates

1.8Certificates Of Compliance

SD-11 Closeout Submittals

G M/RReports and Records

01 31 19.05 20 SD-01 Preconstruction Submittals

1.3.6 G M/RProject Schedule

01 32 18.12 10 SD-01 Preconstruction Submittals

1.5 G M/RQualifications

1.3 G M/RDesign Baseline Network

Analysis Schedule

1.3 G M/RConstruction Baseline Network

Analysis Schedule

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 61 PAGES

01 32 18.12 10 1.7.4 G MMonthly Network Analysis

SD-11 Closeout Submittals

1.7.5 G M/RAs-Built Schedule

01 33 00 SD-01 Preconstruction Submittals

1.9 G M/RSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 G M/RAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G MAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G M/RContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3Construction Site Plan

G; M/R

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 61 PAGES

01 50 00 Traffic Control Plan

01 58 00 SD-02 Shop Drawings

1.4.1Sign Legend Orders

G; M/R

01 75 01.00 40 SD-03 Product Data

G MPreliminary Facility Startup and

Performance Demonstration Plan

G MFinal Facility Startup and

Performance Demonstration Plan

G MFunctional and Performance Test

Results

Completed Unit Process Startup

Forms for each unit process

Completed Facility Performance

Demonstration/Certification Form

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.4Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROperation and Maintenance

Manuals

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 61 PAGES

01 78 00 3.1As-Built Drawings

G; M/R

3.2.1Record Drawings

3.3Record Drawings

3.6 G M/RAs-Built Record of Equipment

and Materials

3.4 G M/RFinal Approved Shop Drawings

3.5 G M/RConstruction Contract

Specifications

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G M/RO&M Database

3.1.1 G M/RTraining Plan

3.1.3 G M/RTraining Outline

3.1.2 G M/RTraining Content

SD-11 Closeout Submittals

3.1.4 G M/RTraining Video Recording

3.1.6 G M/RValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G M/RCommissioning Firm

1.7.1 G M/RLead Commissioning Specialist

1.7.2 G M/RTechnical Commissioning

Specialists

G M/RCommissioning Firm's Contract

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 61 PAGES

01 91 00.15 3.1.2 G MDesign Phase Commissioning

Plan

SD-06 Test Reports

3.2.3 G MDesign Review Report

3.2.2.1 G MInterim Construction Phase

Commissioning Plan

3.2.2.2 G MFinal Construction Phase

Commissioning Plan

3.2.2.1.3 G MTemplate Building Envelope

Inspection Checklists

G MBuilding Envelope Inspection

Checklists

3.2.4.2 G MPre-Functional Checklists

1.8Issues Log

3.3 G MCommissioning Report

3.4.1 G MPost-Construction Trend Log

Report

SD-07 Certificates

1.9 G MCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2.5 G RTraining Plan

3.2.5 G RTraining Attendance Rosters

3.2.6 G MSystems Manual

3.2.7 G RMaintenance and Service Life

Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 61 PAGES

01 91 00.15 SD-11 Closeout Submittals

3.2.2.1Construction Phase

Commissioning Plan

M/R

3.3 G M/RFinal Commissioning Report

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G MFormwork

3.1.1 G MFormwork

2.2.1 G MForm Removal Schedule

SD-03 Product Data

2.2Form Materials

SD-05 Design Data

Calculations; G, M

SD-06 Test Reports

3.2Inspection

03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

03 20 00.00 10 SD-02 Shop Drawings

3.1 G MReinforcement

SD-07 Certificates

2.3Reinforcing Steel

03 30 00.00 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 61 PAGES

03 30 00.00 10 1.5.2 G M/RQuality Control Plan

1.5.1Laboratory Accreditation

3.7.5.4 G M/RSampling Plan

SD-03 Product Data

Part 2Recycled Content Products

2.2Cementitious Materials

2.10Vapor Retarder

2.11Vapor Barrier

2.1.5Floor Finish

Floor Hardener

2.4Chemical Admixtures

SD-04 Samples

2.4.5Surface Retarder

SD-05 Design Data

2.1.1 G MMixture Proportions

SD-06 Test Reports

2.1.1 G MMixture Proportions

3.7 G MTesting and Inspection for CQC

2.2.4Fly Ash

2.2.7Ground Granulated Blast-Furnace

(GGBF) Slag

2.3Aggregates

3.7.5.1Air Content

3.7.5.2Slump

3.7.5.4Compressive Strength

2.5Water

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 61 PAGES

03 30 00.00 10 SD-07 Certificates

1.5Contractor Quality Control personnel

3.2.1Ready-Mix Plant

03 35 00.00 10 SD-03 Product Data

Recycled Content Products

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.1.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 G MStandard Precast Units

2.1.2 G MCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

2.1.1Standard Precast Units

2.1.3Proprietary Precast Units

3.1.3Embedded Items

2.2.4Accessories

SD-05 Design Data

2.1.2 G MDesign Calculations

2.1.5.1Concrete Mix Proportions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 61 PAGES

03 42 13.00 10 SD-06 Test Reports

1.3.1.4Test Reports

SD-07 Certificates

1.3.1.2Quality Control Procedures

04 20 00 SD-02 Shop Drawings

3.3.2.1 G MCut CMU

3.4.1.1 G MDetail Drawings

SD-03 Product Data

1.5.1 G MHot Weather Procedures

1.5.2 G MCold Weather Procedures

2.2.2.2.1 G MCement

2.4.1.1 G MCementitious Materials

SD-04 Samples

1.3.1.1 G RMock-Up Panel

2.2.2.2 G RConcrete Masonry Units (CMU)

2.4.1.4 G RAdmixtures for Masonry Mortar

2.6.2 G RAnchors, Ties, and Bar

Positioners

2.6.3 G RJoint Reinforcement

SD-05 Design Data

2.1.2 G MMasonry Compressive Strength

3.2.4 G MBracing Calculations

SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.3Prism Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 61 PAGES

04 20 00 SD-07 Certificates

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8 G RTake-Back Program

05 05 23.16 SD-01 Preconstruction Submittals

3.2 G MWelding Quality Assurance Plan

SD-03 Product Data

1.3Welding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification

1.3.6Inspector Qualification

1.3.2Previous Qualifications

1.3.3Pre-qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3 G MNondestructive Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 61 PAGES

05 05 23.16 SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.1Certified Brazer Performance

Qualifications (BPQ)

05 40 00 SD-02 Shop Drawings

1.6.1 G M/RFraming Components

SD-03 Product Data

2.1Studs, Joists

05 50 13 SD-02 Shop Drawings

2.4Angles and Plates

G. M

07 21 13 SD-03 Product Data

1.3Manufacturer's Standard Details

2.1Block or Board Insulation

2.2Pressure Sensitive Tape

1.4Protection Board or Coatings

2.4Accessories

SD-07 Certificates

2.1Block or Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 61 PAGES

07 21 13 Vapor Retarder

2.3Protection Board or Coating

3.4.4Protection Board or Coating

1.7Special Warranties

1.7Special Warranties

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.4.1Adhesive

07 52 00 SD-02 Shop Drawings

1.4.6 G MRoof plan

SD-03 Product Data

2.1 G MModified Bitumen Sheets

Asphalt

2.1 G MFiberglass Felt

2.4 G MPrimer

2.5 G MModified Bitumen Roof Cement

Pre-Manufactured Accessories

2.7 G MFasteners And Plates

1.9 G MWarranty

SD-05 Design Data

1.4.5 G MWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.3Qualification of Engineer of

Record

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 61 PAGES

07 52 00 1.5.1Bill of Lading

1.4.5 G MWind Uplift Resistance

1.4.4 G MFire Resistance

SD-08 Manufacturer’s Instructions

3.3.6 G MModified Bitumen Membrane

Application

3.3.7 G MFlashing

Temperature Limitations for

Asphalt

Torches

G MCold Adhesive Applied Modified

Bitumen Membrane

2.4Primer

2.7.1Fasteners

3.3.4Ventilating Base Sheets

SD-11 Closeout Submittals

1.9Warranty

3.8Information Card

3.7Instructions To Government

Personnel

07 55 00 SD-02 Shop Drawings

1.2.1 G MRoof Assembly

SD-07 Certificates

1.4.1Material and Equipment

Energy Efficiency

1.4.2Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 61 PAGES

07 60 00 SD-02 Shop Drawings

3.1.15 G MGutters

3.1.16 G MDownspouts

3.1.13 G MGravel stops and fascias

3.1.20 G MSplash pans

3.1.17 G MFlashing for roof drains

3.1.10 G MBase flashing

3.1.11 G MCounterflashing

3.1.23 G MFlashing at roof penetrations

3.1.12 G MReglets

3.1.18 G MScuppers

G MCopings

3.1.14 G MDrip edge

3.1.19Conductor heads

3.1.21 G MOpen valley flashing

3.1.22 G MEave flashing

SD-11 Closeout Submittals

3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 G MFirestopping System

SD-03 Product Data

2.2Firestopping Materials

SD-06 Test Reports

3.3 G MInspection

SD-07 Certificates

1.5.2Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 61 PAGES

07 84 00 2.2Firestopping Materials

1.5.1 G MInstaller Qualifications

07 92 00 SD-03 Product Data

2.2Sealants

2.3Primers

2.4Bond Breakers

2.5Backstops

3.1 G MField Adhesion

SD-07 Certificates

Indoor Air Quality

SD-11 Closeout Submittals

2.2.1 G MIndoor Air Quality For Interior

Sealants

2.2.3 G MIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 G MIndoor Air Quality For Interior

Acoustical Sealants

G MIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 G MDoors

2.1 G MDoors

2.5 G MFrames

2.5 G MFrames

2.3 G MAccessories

2.7 G MWeatherstripping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 61 PAGES

08 11 13 SD-03 Product Data

2.1 G MDoors

2.5 G MFrames

2.3Accessories

2.7Weatherstripping

08 14 00 SD-02 Shop Drawings

2.2 G MDoors

SD-03 Product Data

2.2 G MDoors

2.3Accessories

2.4.7Water-resistant Sealer

1.4Warranty

G MSound Transmission Class

Rating

G MFire Resistance Rating

SD-04 Samples

2.2 G RDoors

G RDoor Finish Colors

SD-06 Test Reports

2.5Cycle-Slam

Hinge Loading Resistance

SD-11 Closeout Submittals

1.4Warranty

08 51 13 SD-02 Shop Drawings

2.2 G MWindows

1.10 G MFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 61 PAGES

08 51 13 SD-03 Product Data

2.2Windows

2.3.8.1Hardware

2.3.3Fasteners

1.11Window Performance

2.5Thermal-Barrier Windows

2.6Mullions

2.3.10Screens

2.3.2Weatherstripping

2.3.8Accessories

2.3.4Adhesives

1.11.5Thermal Performance

SD-04 Samples

1.4.2.1 G RFinish Sample

1.4.2.2 G RWindow Sample

SD-05 Design Data

2.2 G MStructural Calculations for

Deflection

1.4.3 G MDesign Analysis

SD-06 Test Reports

1.4.4 G MMinimum Condensation

Resistance Factor

1.4.4 G MResistance to Forced Entry

SD-10 Operation and Maintenance

Data

2.2 G RWindows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 61 PAGES

08 51 13 1.7Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 G MManufacturer's Detail Drawings

1.3 G MVerification of Existing Conditions

1.5 G MHardware Schedule

2.3.7 G MKeying System

SD-03 Product Data

2.3 G MHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G RHardware Schedule

SD-11 Closeout Submittals

1.6.1 G M/RKey Bitting

08 81 00 SD-02 Shop Drawings

G MInstallation

SD-03 Product Data

1.6.1Insulating Glass

Plastic Glazing

1.3Glazing Accessories

SD-04 Samples

1.6.1 G RInsulating Glass

G RGlazing Compound

2.3.3 G RTape

2.3.1.1 G RSealant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 61 PAGES

08 81 00 SD-07 Certificates

1.6.1Insulating Glass

Tempered Glass

Laminated Glass

SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

09 22 00 SD-02 Shop Drawings

2.1 G MMetal support systems

09 24 00 SD-03 Product Data

1.8Accessories

Metal plastering bases

Fasteners

Bonding compounds

Admixtures

SD-04 Samples

1.8Accessories

SD-07 Certificates

Installers qualifications

09 24 23 SD-02 Shop Drawings

3.3Lath

SD-03 Product Data

3.6Proportions and Mixing

SD-04 Samples

2.2Colored Stucco Finish Coat

1.3Sample Panel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 61 PAGES

09 29 00 SD-03 Product Data

Cementitious Backer Units

Glass Mat Water-Resistant

Gypsum Tile Backing Board

Water-Resistant Gypsum Backing

Board

2.1.2Abuse Resistant Gypsum Board

Accessories

1.3Certifications

2.1.1Gypsum Board

SD-04 Samples

G RPredecorated Gypsum Board

SD-08 Manufacturer’s Instructions

2.1Material Safety Data Sheets

SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 65 00 SD-02 Shop Drawings

2.7 G MResilient Flooring and

Accessories

SD-03 Product Data

2.1Wall Base

SD-04 Samples

2.7 G RResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 61 PAGES

09 65 00 SD-06 Test Reports

3.3 G MMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.7 G RResilient Flooring and

Accessories

09 90 00 SD-02 Shop Drawings

3.8 G MPiping identification

3.8 G Mstencil

SD-03 Product Data

Certification

2.1 G MCoating

2.1Manufacturer's Technical Data

Sheets

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 G MQualification Testing

SD-08 Manufacturer’s Instructions

Application instructions

3.5.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 61 PAGES

09 90 00 SD-10 Operation and Maintenance

Data

2.1 G RCoatings:

10 44 16 SD-01 Preconstruction Submittals

2.1.1 G M/RManufacturer's Data

SD-03 Product Data

2.1.1 G MFire Extinguishers

G MAccessories

Part 2 G MCabinets

G MWall Brackets

SD-07 Certificates

2.1.1 G MFire Extinguishers

2.1.1 G MManufacturer's Warranty with

Inspection Tag

12 51 00 SD-02 Shop Drawings

G MEquipment Systems

G MOverall Reference Drawings

G MInstallation drawings

SD-03 Product Data

G MEquipment Systems

G MSeating, Tables, Equipment

G MMiscellaneous Freestanding

Furniture

G MCertification

G MWarranty

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 61 PAGES

12 51 00 G MSeating Fabrics and Finishes

G MTable Laminates, Trim, Edges, Paints

G MEquipment Color, Finishes, Fabric

G MMiscellaneous Freestanding

Furniture Fabric, Paints and

Finishes

SD-08 Manufacturer’s Instructions

G RMaterial Safety Data Sheets

SD-10 Operation and Maintenance

Data

G RAssembly Manuals

G RMaintenance Manuals

G RCleaning

G RElectrical System

13 48 00 SD-02 Shop Drawings

3.1 G MBracing

3.4 G MResilient Vibration Isolation

Devices

2.1 G MEquipment Requirements

SD-03 Product Data

3.1 G MBracing

2.1 G MEquipment Requirements

SD-06 Test Reports

3.3 G MAnchor Bolts

13 48 00.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 61 PAGES

13 48 00.00 10 3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.1Equipment Requirements

1.2.4 G MContractor Designed Bracing

SD-03 Product Data

3.1 G MCoupling and Bracing

2.1 G MEquipment Requirements

1.2.4 G MContractor Designed Bracing

SD-07 Certificates

2.3Flexible Ball Joints

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 G MShop Drawings

3.9As-Built Drawings

SD-03 Product Data

1.4.1Fire Protection Related

Submittals

2.3 G MMaterials and Equipment

1.6Spare Parts

3.8 G MPreliminary Tests

3.9 G MFinal Acceptance Test

3.10 G MOnsite Training

1.4.1 G MFire Protection Specialist

1.4.2 G MSprinkler System Installer

SD-05 Design Data

1.4.3 G MSway Bracing

1.2.1.3 G MHydraulic Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 61 PAGES

21 13 13.00 10 SD-06 Test Reports

3.8Preliminary Test Report

3.9Final Acceptance Test Report

SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.10 G ROperating and Maintenance

Manuals

21 30 00 SD-01 Preconstruction Submittals

1.3Fire Pump Installation Related

Submittals

1.7.1 G M/RFire Protection Specialist

SD-02 Shop Drawings

3.3.1 G MInstallation Drawings

3.10.2 G M/RAs-Built Drawings

3.3.2 G MPiping Layout

3.3.2 G MPump Room

SD-03 Product Data

2.1 G MCatalog Data

1.6Spare Parts

3.7.2Preliminary Tests

3.7 G MField Tests

1.7.6 G MManufacturer's Representative

3.10.1 G MField Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 61 PAGES

21 30 00 3.7.3Army Final Acceptance Test

SD-06 Test Reports

3.7.2Preliminary Tests

3.7.3Army Final Acceptance Test

SD-07 Certificates

1.7.1Fire Protection Specialist

1.7.2Qualifications of Welders

1.7.3Qualifications of Installer

1.7.4Preliminary Test Certification

1.7.5Final Test Certification

SD-10 Operation and Maintenance

Data

3.10.1 G ROperating and Maintenance

Instructions

2.13Flow Meter

22 00 00 SD-02 Shop Drawings

3.8.1 G MPlumbing System

SD-03 Product Data

2.4Fixtures

2.4.1Wall Hung Lavatories

2.8 G MWater Heaters

3.8.1.1 G MBackflow Prevention Assemblies

1.5.1Welding

3.4 G MVibration-Absorbing Features

3.8.1Plumbing System

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 61 PAGES

22 00 00 3.8Tests, Flushing and Disinfection

3.8.1.1 G MTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.8.1 G RPlumbing System

23 00 00 SD-02 Shop Drawings

1.3.5 G MDetail Drawings

SD-03 Product Data

2.9.1.1Metallic Flexible Duct

2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.9.1.2Duct Connectors

2.9.2 G MDuct Access Doors

2.9.3Fire Dampers

2.9.4 G MManual Balancing Dampers

2.9.5 G MManual Balancing Dampers

2.9.7Automatic Smoke-Fire Dampers

Sound Attenuation Equipment

2.9.10Acoustical Duct Liner

2.9.11.1Diffusers

Registers and Grilles

2.9.12Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 61 PAGES

23 00 00 2.10.1.1Centrifugal Fans

2.10.1.2In-Line Centrifugal Fans

2.10.1.4Ceiling Exhaust Fans

2.11 G MAir Handling Units

2.12.1 G MRoom Fan-Coil Units

1.3.6Test Procedures

G MDiagrams

SD-06 Test Reports

3.12 G MPerformance Tests

G MDamper Acceptance Test

SD-07 Certificates

Bolts

Certification

1.3.3Ozone Depleting Substances

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Installation

Instructions

3.14.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.14.1 G ROperation and Maintenance

Manuals

2.9.3 G RFire Dampers

2.9.4 G RManual Balancing Dampers

2.9.5 G RManual Balancing Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 61 PAGES

23 00 00 2.9.7 G RAutomatic Smoke-Fire Dampers

G RAutomatic Smoke Dampers

2.10.1.1 G RCentrifugal Fans

2.10.1.2 G RIn-Line Centrifugal Fans

2.10.1.3 G RAir-Curtain Fans

2.10.1.4 G RCeiling Exhaust Fans

2.11 G RAir Handling Units

2.12.1 G RRoom Fan-Coil Units

23 05 93 SD-01 Preconstruction Submittals

1.3.2 G RRecords of Existing Conditions

1.3.2 G RRecords of Existing Conditions

1.5.1 G MIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 G MTAB Design Review Report

1.6.1.1 G MTAB Design Review Report

1.5.8.1 G MTAB Firm

1.2 G MTAB Team Assistants

1.2 G MTAB Team Engineer

1.5.8.2 G MTAB Specialist

1.2 G MTAB Team Field Leader

SD-02 Shop Drawings

1.3.2 G MTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 G MEquipment and Performance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 61 PAGES

23 05 93 1.5.1.3 G MTAB Related HVAC Submittals

1.5.8.4 G MTAB Related HVAC Submittals

1.5.6 G MTAB Procedures

1.5.6 G MCalibration

1.3.2 G RSystems Readiness Check

1.5.9 G MTAB Execution

1.5.9.3 G RTAB Verification

SD-06 Test Reports

3.3.5 G RCompleted Pre-Final DALT

Report

3.3.8 G RCertified Final DALT Report

1.5.3.2 G RPrerequisite HVAC Work

Checkout List

1.5.3.2 G RPrerequisite HVAC Work

Checkout List

1.6.1 G RPrerequisite HVAC Work

Checkout List

1.6.1 G RPrerequisite HVAC Work

Checkout List

3.7 G MProportional Balancing

3.7 G MSeason 1

1.5.3.1 G MTAB Design Review Report

1.6.1.1 G MTAB Design Review Report

G MTAB Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 61 PAGES

23 05 93 1.5.1 G MIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 G RDALT and TAB Submittal and

Work Schedule

1.6.1 G RDALT and TAB Submittal and

Work Schedule

1.5.3.2 G RTAB Pre-Field Engineering

Report

1.6.1.3 G RTAB Pre-Field Engineering

Report

1.5.5 G MInstrument Calibration

Certificates

3.7 G MDALT and TAB Procedures

Summary

3.7 G RCompleted Pre-Final DALT Work

Checklist

3.3.2 G RAdvance Notice of Pre-Final

DALT Field Work

3.7 G RProportional Balancing

1.5.8.1 G MTAB Firm

1.3.2 G RDesign Review Report

1.6.1.2 G RPre-field DALT Preliminary

Notification

1.6.1 G RAdvanced Notice for TAB Field

Work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 61 PAGES

23 05 93 1.5.3.2 G RPrerequisite HVAC Work Check

Out List

1.6.1 G RPrerequisite HVAC Work Check

Out List

23 07 00 SD-02 Shop Drawings

3.2.2.2 G MMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SD-03 Product Data

2.3 G MPipe Insulation Systems

3.2 G MPipe Insulation Systems

3.3 G MDuct Insulation Systems

3.4 G MEquipment Insulation Systems

SD-04 Samples

2.2.1.3 G RThermal Insulation

3.1.1 G RDisplay Samples

SD-08 Manufacturer’s Instructions

2.3 G MPipe Insulation Systems

3.2 G MPipe Insulation Systems

3.3 G MDuct Insulation Systems

3.4 G MEquipment Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 G MCommissioning Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 61 PAGES

23 08 00.00 10 3.2.1Pre-Functional Performance Test

Checklists

3.2.2Functional Performance Tests

SD-06 Test Reports

3.3 G MCommissioning Report

SD-07 Certificates

1.5.1Commissioning Firm

1.5.2Commissioning Specialist

23 23 00 SD-02 Shop Drawings

2.3 G MRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.5.2Spare Parts

1.3.1Qualifications

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SD-10 Operation and Maintenance

Data

1.5 G RMaintenance

3.4 G ROperation and Maintenance

Manuals

3.4 G RDemonstrations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 61 PAGES

23 82 43.00 40 SD-02 Shop Drawings

1.2.1Fabrication Drawings

1.2.1 G MInstallation Drawings

SD-03 Product Data

2.1.1 G MPerformance Data

2.1 G MDuct Heaters

2.2.1 G MHeating Elements

2.2.1 G MEnclosures

2.2.2 G MControls

SD-08 Manufacturer’s Instructions

1.2.1Manufacturer's Instructions

23 82 46.00 40 SD-02 Shop Drawings

1.2.1Fabrication Drawings

SD-03 Product Data

2.1 G MPerformance Data

2.1 G MElectric Unit Heaters

2.2.1 G MHeating Element

2.2.2 G MControls

3.1.1 G MCasings

2.2.3 G MPropellers and Motors

SD-08 Manufacturer’s Instructions

1.2.1Manufacturer's Instructions

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 61 PAGES

26 05 48.00 10 3.2Lighting Fixtures in Buildings

GM

1.3 G MEquipment Requirements

1.2.4 G MContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1 G MAcceptance tests and inspections

SD-07 Certificates

1.4.1 G MQualifications

1.4.3 G MAcceptance test and inspections

procedure

26 11 16 SD-02 Shop Drawings

1.5.1.1 G MUnit Substation Drawings

1.5.1.2 G MTransformer drawings

SD-03 Product Data

G MFuse curves

2.2 G MSecondary unit substation

2.2.2 G Mtransformer (liquid-filled)

SD-06 Test Reports

3.6.1 G MAcceptance checks and tests

SD-07 Certificates

1.5.2 G MPaint coating system

1.5.3 G MTransformer Losses

SD-09 Manufacturer’s Field

Reports

2.6.2 G MLoad Interrupter Switch

production tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 61 PAGES

26 11 16 2.6.3 G Mtransformer design tests

(liquid-filled)

2.6.4 G Mtransformer routine and other

tests (liquid-filled)

26 20 00 SD-02 Shop Drawings

2.13 G MPanelboards

2.17 G MTransformers

G MBusway

2.4 G MCable trays

G MMotor control centers

G MCommunication system conduit installation/routing

2.26 G MWireways

2.15 G MLoad centers for housing units

3.1.9.1 G MMarking strips

SD-03 Product Data

2.12Receptacles

2.13.3Circuit breakers

2.14.2Circuit breakers

2.15.2Circuit breakers

2.10Switches

2.17Transformers

Enclosed circuit breakers

2.19Motor controllers

Combination motor controllers

2.15Load centers for housing units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 61 PAGES

26 20 00 2.20Manual motor starters

2.14Residential load centers

2.27Metering

2.29Surge protective devices

G MCommunication system conduit

G MCommunication metal boxes

G MCommunication system ground bars

SD-06 Test Reports

3.5.2 G M600-volt wiring test

3.5.5 G MGrounding system test

3.5.3 G MTransformer tests

3.5.4 G MGround-fault receptacle test

SD-07 Certificates

2.11Fuses

SD-09 Manufacturer’s Field

Reports

2.31.1Transformer factory tests

26 28 01.00 10 SD-03 Product Data

2.10Fault Current Analysis

2.10Protective Device Coordination

Study

2.1Equipment

1.4.1System Coordinator

3.3.4Protective Relays

3.2Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 61 PAGES

26 28 01.00 10 SD-06 Test Reports

3.3Field Testing

SD-07 Certificates

Devices and Equipment

26 32 14.00 10 SD-02 Shop Drawings

1.4.6 G M/RDetailed Drawings

3.11 G M/RAcceptance

SD-03 Product Data

2.4Manufacturer's Catalog

3.10 G M/RInstructions

1.4.3Experience

1.4.4Field Engineer

1.4.2Site Welding

3.2General Installation

3.1Site Visit

SD-05 Design Data

2.8 G M/RSound Limitations

2.14Generator

2.5.4Integral Main Fuel Storage Tank

Day Tank

3.6.2.2Power Factor

2.7.2Heat Exchanger

2.18.5Time-Delay on Alarms

2.7Cooling System

1.2.5Vibration Isolation

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 61 PAGES

26 32 14.00 10 3.6.6Performance Tests

3.6 G M/ROnsite Inspection and Tests

SD-07 Certificates

1.2.5Vibration Isolation

3.4Prototype Tests

1.2.6Reliability…