AM2_UD_2.4_-_Pkg_1_LSA_-_Cost_Breakdown_3-26-18_-_NO_COST_-_.pdf
PDF 546 KB Posted
- Attached to
- Construct Critical Infrastructure Federal contract opportunity
- Solicitation number
- W912ER-18-R-0004
About this file
Cost Breakdown
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER18R0004 P2# 463243
PROJECT: UD 2.4 - Package 1 LSA Roads & Utilities PROPOSER:
LOCATION: Jordan DATE:
Mobilization and Demobilization in accordance with the contract documents
0002 Site Design & Survey in accordance with the contract documents
Construct LSA Roads & Utilities in accordance with the contract documents
0003AA Demolition
0003AB
Site Improvements to include Security Fencing, Asphalt Walkways, Gravel Parking Lots, Dumpster Sites,& Bus Stops
0003AC Construct LSA Road Network
0003AD Construct Entry Control Points (ECP)
0003AE Construct Combined Site Fire Water & Water Distribution Piping System
0003AF Construct Well Houses
0003AG Construct Fire Pump Houses
0003AH Construct Water Storage Tanks
0003AJ Construct Site Sanitary Sewer Collection Piping System
0003AK Construct Waste Water Treatment & Evaporation Ponds
0003AL Construct Site Electrical Distribution System
0003AM Construct Site Communication Distribution System
0003AN Construct Site Storm Water Collection System
Option #1 Contractor Provided Construction Escorts in accordance with the contract documents
$2,000,000.00
Option #2 Drill & Construct Well # 1 in accordance with the contract documents
Option #3 Drill & Construct Well # 2 in accordance with the contract documents
$2,000,000.00
OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN
ITEM DESCRIPTION
TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0006)
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-HOURS DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL BASE BID PRICE (ITEMS 0001 - 0003)
TOTAL OPTION PRICE (ITEM 0006)
W912ER18R0004 Amendment 0002
Cost Breakdown Sheet