AM1_UD_2.4_-_Package_1_Pkg_1_LSA__Cost_Breakdown_3-13-18.pdf

PDF 17 KB Posted

Attached to
Construct Critical Infrastructure
Solicitation number
W912ER-18-R-0004
Issued by

About this file

Cost Breakdown

View the file

Other files

File Type Posted
AM5_Specifications_6_Apr_18.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS1_AM005_06_APR_18.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS2_AM005_06_APR_18.pdf PDF
W912ER18R0004-0005.pdf PDF
W912ER18R0004-0004.pdf PDF
AM4_Specifications_4_Apr_18.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS_AM004_04_APR_18.pdf PDF
W912ER18R0004-0003.pdf PDF
AM3_Specifications_29_Mar_18.pdf PDF
AM2_UD_2.4_-_Pkg_1_LSA_-_Cost_Breakdown_3-26-18_-_NO_COST_-_.pdf PDF
AM2_Specifications_26_Mar_18.pdf PDF
AM2_UD_2.4_-_Pkg_1_LSA_Bid_Schedule_-_3-26-18__.pdf PDF
W912ER18R0004-0002.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS_AM002_26_MAR_18.pdf PDF
W912ER-18-R-0004-01_Conformed_Copy.pdf PDF
UD_2.4_PACKAGE_1_LSA_DRAWINGS_AM001_15_MAR_18.pdf PDF
W912ER-18-R-0004-01_Modificaion.pdf PDF
AM1_Specifications_13_Mar_18.pdf PDF
Volume_1_Attachment_A.pdf PDF
Volume_2_of_3_Specs_Div_01-12_8_Feb_18.pdf PDF
Volume_3_of_3_Specs_Div_13-44_5_Feb_18.pdf PDF
Volume_1_Attachment_B.pdf PDF
Volume_1_of_3_Solicitation.pdf PDF
Volume_1_Attachment_C.pdf PDF
Volume_1_Attachment_D.xls XLS spreadsheet
Copy_of_332_AEW_Vetting_Request_Worksheet_TEMPLATE.xlsx XLSX spreadsheet
&_1575;&_1604;&_1602;&_1610;&_1575;&_1583;&_1607;_&_1575;&_1604;&_1593;&_1575;&_1605;&_1607;_&_1604;&_1604;&_1602;&_1608;&_1575;&_1578;_&_1575;&_1604;&_1605;&_1587;&_1604;&_1581;&_1607;_&_1575;&_1604;&_1575;&_1585;&_1583;&_1578;&_1610;&_1607;_(2)RJAF_Upda PDF
U.S._Contractor_Request_Template.xlsx XLSX spreadsheet
Jordanian_Information_Form.pdf PDF
RJAF_DMS_Application_Blank.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 1 Page 1 of 1

RFP: W912ER18R0004 P2# 463243

PROJECT: UD 2.4 - Package 1 LSA Roads & Utilities PROPOSER:

LOCATION: Jordan DATE:

Mobilization and Demobilization in accordance with the contract documents

0002 Site Design & Survey in accordance with the contract documents

Construct LSA Roads & Utilities in accordance with the contract documents

0003AA Demolition

0003AB

Site Improvements to include Security Fencing, Asphalt Walkways, Gravel Parking Lots, Dumpster Sites,& Bus Stops

0003AC Construct LSA Road Network

0003AD Construct Entry Control Points (ECP)

0003AE Construct Combined Site Fire Water & Water Distribution Piping System

0003AF Construct Wells

0003AG Construct Pump House

0003AH Construct Water Storage Tanks

0003AJ Construct Site Sanitary Sewer Collection Piping System

0003AK Construct Waste Water Treatment & Evaporation Ponds

0003AL Construct Site Electrical Distribution System

0003AM Construct Site Communication Distribution System

0003AN Construct Site Storm Water Collection System

0003AP Provide Suitable Fill

Option #1 Contractor Provided Construction Escorts in accordance with the contract documents

$2,000,000.00

Option #2 Drill & Construct Well # 1 in accordance with the contract documents

Option #3 Drill & Construct Well # 2 in accordance with the contract documents

$2,000,000.00

OVERHEAD/

INDIRECT COST PROFIT TOTAL

PROPOSED COST

COST BREAKDOWN

ITEM DESCRIPTION

TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0006)

DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

LABOR MAN-HOURS DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL BASE BID PRICE (ITEMS 0001 - 0003)

TOTAL OPTION PRICE (ITEM 0006)

Cost Breakdown Sheet