AM1_UD_2.4_-_Package_1_Pkg_1_LSA__Cost_Breakdown_3-13-18.pdf
PDF 17 KB Posted
- Attached to
- Construct Critical Infrastructure Federal contract opportunity
- Solicitation number
- W912ER-18-R-0004
About this file
Cost Breakdown
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1 Page 1 of 1
RFP: W912ER18R0004 P2# 463243
PROJECT: UD 2.4 - Package 1 LSA Roads & Utilities PROPOSER:
LOCATION: Jordan DATE:
Mobilization and Demobilization in accordance with the contract documents
0002 Site Design & Survey in accordance with the contract documents
Construct LSA Roads & Utilities in accordance with the contract documents
0003AA Demolition
0003AB
Site Improvements to include Security Fencing, Asphalt Walkways, Gravel Parking Lots, Dumpster Sites,& Bus Stops
0003AC Construct LSA Road Network
0003AD Construct Entry Control Points (ECP)
0003AE Construct Combined Site Fire Water & Water Distribution Piping System
0003AF Construct Wells
0003AG Construct Pump House
0003AH Construct Water Storage Tanks
0003AJ Construct Site Sanitary Sewer Collection Piping System
0003AK Construct Waste Water Treatment & Evaporation Ponds
0003AL Construct Site Electrical Distribution System
0003AM Construct Site Communication Distribution System
0003AN Construct Site Storm Water Collection System
0003AP Provide Suitable Fill
Option #1 Contractor Provided Construction Escorts in accordance with the contract documents
$2,000,000.00
Option #2 Drill & Construct Well # 1 in accordance with the contract documents
Option #3 Drill & Construct Well # 2 in accordance with the contract documents
$2,000,000.00
OVERHEAD/
INDIRECT COST PROFIT TOTAL
PROPOSED COST
COST BREAKDOWN
ITEM DESCRIPTION
TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0006)
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-HOURS DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL BASE BID PRICE (ITEMS 0001 - 0003)
TOTAL OPTION PRICE (ITEM 0006)
Cost Breakdown Sheet