Table of Contents R0003.pdf
PDF 30 KB Posted
- Solicitation number
- W912DW24R0019
About this file
This document is the Table of Contents for the solicitation W912DW24R0019 for the Albeni Falls Dam (AFD) Powerhouse Bridge Crane Rehabilitation project in Oldtown, ID. The project involves the removal of existing crane trolleys and accessories, asbestos abatement, concrete demolition and repair, structural steel welding and fabrication, door and hardware installation, painting, and various electrical work related to the bridge crane rehabilitation.
The solicitation includes specifications, drawings, and attachments such as past performance forms and a proposal data sheet. The project is being procured by the US Army Corps of Engineers, Seattle District. Key divisions covered include General Requirements, Existing Conditions, Concrete, Metals, Openings, Finishes, Electrical, and Material Handling Equipment. This summary focuses on the high-level scope and key content areas covered in the Table of Contents, excluding legal clauses and other non-essential information.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFD Powerhouse Bridge Crane Rehab 23011 Oldtown, ID W912DW24R0019
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 26 12/22 SUMMARY OF WORK
01 11 00.01 28 02/24 CONCEPTUAL DESIGN INFORMATION
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 22 00.00 26 12/22 MEASUREMENT AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 16.00 28 05/16 DESIGN DATA (DESIGN AFTER AWARD)
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 11/16, CHG 2: 11/21 QUALITY CONTROL
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 16.00 26 REMOVAL OF EXISTING CRANE TROLLEYS AND
ACCESSORIES
02 82 13.00 26 ASBESTOS ABATEMENT WORK
02 83 00 11/18 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF
CONCRETE SURFACES, AND MINOR EQUIPMENT
FOUNDATIONS
DIVISION 05 - METALS
05 05 23.17 26 07/18 STRUCTURAL STEEL WELDING AND
FABRICATION
05 05 33.20 26 NON-DESTRUCTIVE TESTING
05 50 04.00 26 METALS: MATERIALS, PRODUCTS, AND
MISCELLANEOUS ITEMS
DIVISION 08 - OPENINGS
08 11 13.00 26 08/20 STEEL DOORS AND FRAMES
08 71 00.00 26 02/16, CHG 4: 02/22 DOOR HARDWARE
DIVISION 09 - FINISHES
09 90 00.01 26 PAINTS AND COATINGS
DIVISION 26 - ELECTRICAL
26 05 00.01 26 03/22 BASIC ELECTRICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 1 R0003
AFD Powerhouse Bridge Crane Rehab 23011 Oldtown, ID W912DW24R0019
FOR CRANES
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13.71 26 21 November 2022 BRIDGE CRANE DATA, TESTING AND TRAINING
41 22 13.72 26 BRIDGE CRANE MECHANICAL AND STRUCTURAL
REHABILITATION
41 22 13.73 26 BRIDGE CRANE APPURTENANCES
41 22 13.74 26 BRIDGE CRANE REHABILITATION ELECTRICAL
WORK
41 22 13.75 26 LIFTING DEVICE LOAD TESTING
41 22 13.76 26 August 2023 OPTIONAL BELOW-THE-HOOK LIFTING
DEVICES
-- End of Project Table of Contents --