CENWS ODA HECP Appendix D R0003.pdf

PDF 228 KB Posted

Attached to
W912DW24R0019 - Albeni Falls Dam (AFD), Powerhouse Bridge Crane (PHBC), Oldtown, ID
Solicitation number
W912DW24R0019
Issued by

About this file

This document is Appendix D - Hazardous Energy Control Program (HECP) Personnel Authorizations for the Albeni Falls Dam project. It outlines the personnel authorized to receive safe clearances and personal lockouts for electrical, mechanical, and construction-related work on the project. It designates Amanda Smith, the Operating Project Manager, as the Responsible Official for the HECP. The document lists the Authorized Individuals by name and the specific types of clearances each individual is authorized to receive. It also identifies the Issuing Individuals, typically the Shift Operators, who are responsible for issuing the clearances. The document was last revised on 9/26/23 and outlines the procedures for managing hazardous energy control for the Albeni Falls Dam project.

View the file

Other files

File Type Posted
Amendment 0005 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
Specs Section 41 22 13.74 26 R0004.pdf PDF
Amendment 0004 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
Reference Drawing E-52-18-4-88 R0004.pdf PDF
G-202 R0003.pdf PDF
M-101 R0003.pdf PDF
Photo I R0003.pdf PDF
E-52-18-4-102 R0003.PDF PDF
Submittal Register R0003.pdf PDF
G-002 R0003.pdf PDF
01 33 16.00 28 R0003.pdf PDF
Photo D R0003.pdf PDF
South Bridge Crane Trolley Rail HLL R0003.pdf PDF
01 35 26 R0003.pdf PDF
AFD Fall Protection Submittal R0003.pdf PDF
E-52-18-1-101 R0003.PDF PDF
e-52-18-3-66 R0003.PDF PDF
E-52-18-7-4 R0003.PDF PDF
Photo E R0003.pdf PDF
41 22 13.76 26 R0003.pdf PDF
Photo G R0003.pdf PDF
E-52-18-7-1 R0003.PDF PDF
01 11 00.01 28 R0003.pdf PDF
01 22 00.00 26 R0003.pdf PDF
E-52-18-4-101 R0003.PDF PDF
E-52-18-4-100 R0003.PDF PDF
Photo C R0003.pdf PDF
41 22 13.72 26 R0003.pdf PDF
North Bridge Crane Trolley Rail HLL R0003.pdf PDF
01 11 00.00 26 R0003.pdf PDF
HECP NWS 11519 revision 2 R0003.pdf PDF
Reference Drawing Plate 39619 R0003.pdf PDF
E-52-18-4-99 R0003.PDF PDF
Photo B R0003.pdf PDF
Photo J R0003.pdf PDF
Table of Contents R0003.pdf PDF
Amendment 0003 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
E-52-20-2-9 R0003.PDF PDF
E-52-18-3-56 R0003.PDF PDF
Upstream Corbel HLL R0003.pdf PDF
Downstream Corbell HLL R0003.pdf PDF
E-52-20-2-11 R0003.PDF PDF
CENWS ODA HECP Local Supplement R0003.pdf PDF
G-203 R0003.pdf PDF
E-52-20-7-2 R0003.PDF PDF
41 22 13.75 26 R0003.pdf PDF
Amendment 0002 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
AFD-24-RE R0001.pdf PDF
20240805 Site-Visit Attendance List R0001.pdf PDF
REGISTER R0001.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

APENDIX D – HECP (Personnel) Authorizations

ALBENI FALLS DAM

Responsible Official In accordance with Engineering Regulation 385-1-31, Amanda Smith, OPM is designated as the Responsible Official for the Albeni Falls Project.

In the case of emergency situations identified in Chapter 4, the Issuing Individual may act on behalf of the Responsible Official or designee if neither is present or cannot be contacted.

Personnel Authorizations In Accordance with Engineering Regulation 385-1-31, the following list provides personnel qualifications and training dates for the purposes of this Hazardous Energy Control Program (HECP). An Authorized Individual is also authorized to hold personal lockouts and request operational permits.

LIST OF AUTHORIZED PERSONNEL

AUTHORIZED INDIVIDUALS (INDIVIDUALS AUTHORIZED TO

RECEIVE SAFE CLEARANCES AND PERSONAL LOCKOUTS).

In accordance with ER 385-1-31, the individuals listed below are authorized to receive and release Safe Clearances. The type of Clearances each individual may be issued is listed. Clearances will be issued to individuals by name only, never by position or title. The only exceptions to this will be the Powerplant Operator and the Bonneville Power Administration (BPA) dispatcher.

A. ELECTRICAL.

The following individuals may receive Safe Clearances for all electrical work to be performed on any project equipment and its connected electrical circuits. Mechanical devices associated with this equipment may be included.

(1) Chambers, Jake

(2) Smith, Bret

(3) Cork, Tim

(4) Gazaway, Kyle

2 | P a g e

B. MECHANICAL.

mechanical work to be performed on any project equipment and its connected piping. Electrical devices associated with this equipment may be included.

(1) Mellick, Stuart

(2) Lyon, James

(3) Carlock, Anthony

(4) Johnson, Spencer

C. SUPERVISORY.

types of work on the project:

(1) Fegert, Tony Chief of O&M

D.ON-SITE CONSTRUCTION.

construction related work in conjunction with contractors, including checkouts and testing:

NAME POSITION

(1) Fegert, Tony Chief O&M

(2) Mellick, Stuart Mechanical Worker in Charge

(3) Chambers, Jake Electrician Worker in Charge

(4) Gazaway, Kyle Electrician

(5) Smith, Bret Electronics Crafts worker

(6) Cork, Tim Electrician

(7) Lyon, James Mechanic

(8) Carlock, Anthony Mechanic

(9) Johnson, Spencer Mechanic

(10) Bebow, Cole Operator

(11) Jordan, James Operator

(12) Ohman, Nathan Operator

(13) Karney, Jim Operator

(14) Toups, Jeff Operator

3 | P a g e

E. DESIGNATED REPRESENTATIVE TO THE ISSUING INDIVIDUAL.

The following individuals are authorized to perform switching and lockout or tagout of equipment associated with clearances which they are personally receiving when delegated by the Issuing Individual.

(1) Chambers, Jake

(2) Lyon, James

(3) Mellick, Stuart

(4) Smith, Bret

(5) Jordan, James

(6) Bebow, Cole

(7) Karney, Jim

(8) Carlock, Anthony

(9) Cork, Tim

(10) Toups, Jeff

(11) Ohman, Nathan

(12) Gazaway, Kyle

(13) Johnson, Spencer

F. BPA DISPATCHER.

Will receive Clearances on high voltage systems to prevent energizing of transmission lines between the powerplant and the BPA substation.

2. ISSUING INDIVIDUAL(S).

A. DUTIES, RESPONSIBILITIES, AND TYPES OF CLEARANCES:

In addition to the duties and responsibilities described in the project Hazardous Energy Control Plan and ER 385-1-31, the Issuing Individual (normally the Shift Operator will receive Safe Clearances issued to the position for the following conditions:

1. Line terminal Clearances on tie lines and supply lines to and from outside utilities or the power marketing agency (BPA) to establish safe working conditions within areas of high voltage equipment energized by these authorities.

2. To hold defective equipment out of service, or to prevent operation of malfunctioning equipment which

4 | P a g e might be damaged if operated.

3. In cases where emergency repair work is needed in order to restore critical equipment to service, and no Authorized Individuals are available to take Clearances.

B. ISSUING INDIVIDUAL(S) FOR THE PROJECT

are listed below. Special shift change considerations are listed following the names of the Issuing Individual(s).

(1) Jordan, James Operator

(2) Toups, Jeff Operator

(3) Karney, Jim Operator

(4) Ohman, Nathan Operator

(5) Bebow, Cole Operator

3. RESPONSIBLE OFFICIAL.

The Responsible Officials for the project will be the Project Manager.

The Responsible Official listed below shall fulfill all Hazardous Energy Control Program requirements for the Responsible Official as outlined in the project Hazardous Energy Control Plan and ER 385-1-31.

Amanda Smith Operating Project Manager

Approved by:

Responsible Official/Operating Project Manager Date

Revision Date ACTION Notes

0 8/18/2023 Make Appendix D separate file.

Create Appendix D as a separate file for efficient management of changes in personnel.

1 9/26/23 Add name Added Spencer Johnson to the list of authorized

Individuals.

5 | P a g e

2023-09-26T09:49:35-0700
SMITH.AMANDA.MARIE.1230740964

File details come from the government source that posted it. Updated .