This document is a Submittal Register for a federal contract opportunity, Contract Number W912DW24R0019 titled "AFD Powerhouse Bridge Crane Rehab". It lists numerous submittal requirements and associated details such as specification sections, item descriptions, paragraph numbers, submittal classifications, and approving authorities for the rehabilitation of an existing powerhouse bridge crane.

The key requirements include submittals for design data, test reports, product data, shop drawings, certificates, and operation and maintenance manuals across various specification sections covering topics such as concrete, steel, painting, crane components, electrical systems, and lifting devices. Specific details are provided for items like welding procedures, crane clearances/coverage, control systems, load testing, and material certifications. The Submittal Register indicates a significant level of documentation and testing will be required throughout the project.

View the file

Other files

File Type Posted
Amendment 0005 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
Specs Section 41 22 13.74 26 R0004.pdf PDF
Amendment 0004 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
Reference Drawing E-52-18-4-88 R0004.pdf PDF
G-202 R0003.pdf PDF
M-101 R0003.pdf PDF
Photo I R0003.pdf PDF
E-52-18-4-102 R0003.PDF PDF
G-002 R0003.pdf PDF
01 33 16.00 28 R0003.pdf PDF
Photo D R0003.pdf PDF
South Bridge Crane Trolley Rail HLL R0003.pdf PDF
CENWS ODA HECP Appendix D R0003.pdf PDF
01 35 26 R0003.pdf PDF
AFD Fall Protection Submittal R0003.pdf PDF
E-52-18-1-101 R0003.PDF PDF
e-52-18-3-66 R0003.PDF PDF
E-52-18-7-4 R0003.PDF PDF
Photo E R0003.pdf PDF
41 22 13.76 26 R0003.pdf PDF
Photo G R0003.pdf PDF
E-52-18-7-1 R0003.PDF PDF
01 11 00.01 28 R0003.pdf PDF
01 22 00.00 26 R0003.pdf PDF
E-52-18-4-101 R0003.PDF PDF
E-52-18-4-100 R0003.PDF PDF
Photo C R0003.pdf PDF
41 22 13.72 26 R0003.pdf PDF
North Bridge Crane Trolley Rail HLL R0003.pdf PDF
01 11 00.00 26 R0003.pdf PDF
HECP NWS 11519 revision 2 R0003.pdf PDF
Reference Drawing Plate 39619 R0003.pdf PDF
E-52-18-4-99 R0003.PDF PDF
Photo B R0003.pdf PDF
Photo J R0003.pdf PDF
Table of Contents R0003.pdf PDF
Amendment 0003 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
E-52-20-2-9 R0003.PDF PDF
E-52-18-3-56 R0003.PDF PDF
Upstream Corbel HLL R0003.pdf PDF
Downstream Corbell HLL R0003.pdf PDF
E-52-20-2-11 R0003.PDF PDF
CENWS ODA HECP Local Supplement R0003.pdf PDF
G-203 R0003.pdf PDF
E-52-20-7-2 R0003.PDF PDF
41 22 13.75 26 R0003.pdf PDF
Amendment 0002 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
AFD-24-RE R0001.pdf PDF
20240805 Site-Visit Attendance List R0001.pdf PDF
REGISTER R0001.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 23 PAGES

W912DW24R0019

AFD Powerhouse Bridge Crane Rehab

01 11 00.01 28 SD-01 Preconstruction Submittals

1.10.7 GWelding Procedure Specifications

(Wps)

1.10.2 GInstaller Qualifications

1.10.3 GDesigner And Installer's

Qualifications

3.4 GConcrete Quality Control Program

SD-06 Test Reports

3.6Certified Test Reports

SD-07 Certificates

1.10.6 GWelder's Qualifications

1.10.4 GCertified Welding Inspector

SD-11 Closeout Submittals

2.7 GOperation And Maintenance

Manual

01 14 00 SD-01 Preconstruction Submittals

1.7List of Contact Personnel

1.7List of Contact Personnel

1.5 GContractor Access and Use of

Premises

1.8Employee Listing

1.9Vehicle Listing

1.10 GTransportation of Materials

1.11 G HDCLOADING PLAN AND LIFTING

DIAGRAM FOR CRANES AND

HEAVY EQUIPMENT

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

R0003 g3endlqm Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.10.2Certificate of Understanding

1.8Seismic Plan

SD-07 Certificates

1.4.2Project Photographs

SD-11 Closeout Submittals

1.4.3Completion Photographs

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 16.00 28 SD-01 Preconstruction Submittals

2.5.2.1 GSubmittal Register

1.4 GPacking

3.2.1 G30 Percent Design Submittal

Packaging

3.2.2 G100 Percent Design Submittal

Packaging

3.2.3 GComplete Design Submittal

Packaging

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

g3endlqm Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

01 35 26 SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.3.2 GStandard Lift Plan

1.7.3.3 GCritical Lift Plan

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

01 45 35 3.1.1 GProject Manual

3.1.1Written NDT Practices

3.1.3Written NDT Practices

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Steel Truss Plant Quality

Assurance Program

2.1Wood Truss Plant Quality

Assurance Program

2.1AC472 Accreditation

2.1Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5.17 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1 GInterim Report

3.1.3 GInterim Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

01 45 35 3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

1.4.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.4.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.9 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

1.5.5 GEmployee Training Records

1.5.4 GEnvironmental Manager

Qualifications

SD-06 Test Reports

1.9.1 GMonthly Solid Waste Disposal

Report

SD-07 Certificates

1.5.5 GEmployee Training Records

SD-11 Closeout Submittals

3.4.1 GWaste Determination

Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

01 57 19 3.4.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 GAssembled Employee Training

Records

1.9 GSolid Waste Management Permit

3.4.2.1 GProject Solid Waste Disposal

Documentation Report

3.4.3.1 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

3.4.2.1 GSales Documentation

3.4.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Quarterly Reports

1.8.3Annual Report

SD-11 Closeout Submittals

1.9Final Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

01 78 00 1.8.1Instructions

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.8.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

2.2 GCertification of EPA Designated

Items

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G HDCO&M Database

02 41 16.00 26 SD-01 Preconstruction Submittals

1.5 G HDCRemoval Plan

1.5 G HDCRemoval Plan

3.1.3 G HDCRemoval Plan

1.8 G HDCOn-Site Work Notification

3.1.6Copies of Notifications

1.6 G HDCRepair Plan

1.5 GCritical Lift Plan

02 82 13.00 26 SD-01 Preconstruction Submittals

3.3 G EC-RSampling Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

02 82 13.00 26 3.4.2 G EC-RAsbestos Plan

1.8.1Respirators

2.1.5Encapsulants

2.1.6Surfactants

1.9Local Exhaust Equipment

1.9Recording Manometer

SD-06 Test Reports

1.6.2Work Site Entry Logbook

1.16.1Daily Narrative Log

3.3Asbestos Bulk Sample Results

3.7.1Personnel and Area Air

Monitoring Logs

SD-07 Certificates

1.16.2Waste Disposal Site (WDS)

1.7.1Asbestos Abatement Worker

Training

1.12Asbestos Abatement Contractor

1.14Bulk Sampling Personnel

1.7.2Asbestos Abatement Supervisory

Personnel Training

1.8.2Respirator Fit Test Results

1.10Medical Examinations

1.11Permits and Notifications

1.13Certified Industrial Hygienist

(CIH)

1.15Air Monitoring Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

02 82 13.00 26 1.15Testing Laboratory

3.10Waste Shipment Record (WSR)

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.4Medical Examinations

1.5.2.8 GLead Waste Management Plan

1.5.3 GLicenses, Permits and

Notifications

1.5.4 GOccupant Protection Plan

1.5.2.2Lead Compliance Plan

3.1.1.5Lead Compliance Plan

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

1.6.7Negative Air Pressure System

2.1Materials and Equipment

2.1.1Expendable Supplies

3.1.1.4Local Exhaust Equipment

3.1.1.4 GPressure Differential Automatic

Recording Instrument

3.1.1.5Pressure Differential Log

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

02 83 00 SD-06 Test Reports

1.3.3 GSampling and Analysis

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

SD-07 Certificates

1.5.1.3 GTesting Laboratory

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

3.5.1.1 GClearance Certification

03 60 00.01 26 SD-01 Preconstruction Submittals

3.4.1 G HDCConcrete Removal and Disposal

Plan

3.4.3 G HDCSaw Cutting Procedure

3.4.4 G HDCCore Drilling Procedure

3.4.8 G HDCConcrete Imaging Report

3.4.12 G HDCRepair Procedure of Concrete

Surfaces

SD-03 Product Data

2.4 G HDCReinforcing Steel

05 05 23.17 26 SD-01 Preconstruction Submittals

1.4.1 G AOFabricator's Welding Quality

Control Plan

1.4.1.2 GWitness Points

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

05 05 23.17 26 1.4.2 GWelding Procedure Specifications

(WPS)

1.4.2 GProcedure Qualification Records

(PQR)

1.4.3 G AOWelder Performance Qualification

Records (WPQR)

3.1.3.10 G HDCPostweld Heat Treatment Plan

3.2.3.1 G HDCBolt Installation Plan

3.2.3.2Pre-Installation Verification

SD-03 Product Data

3.5.1 G AONonconformance Reports

1.4.2.2 GPre-Qualified Welding

Procedures

2.2 GWelding Electrodes and Rods

2.2 GShielding Gas

SD-06 Test Reports

3.5.1 G HDCTest and Inspection Report

1.4.1.1NDT Equipment Calibration

Records

3.5.2NDT Equipment Calibration

Records

SD-07 Certificates

1.4.4 GInspector Qualifications

1.4.1.1 GNDT Equipment Calibration

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

05 05 23.17 26 3.5.2 GNDT Equipment Calibration

Records

05 05 33.20 26 SD-06 Test Reports

3.1.1 GNDT Inspection Reports

SD-07 Certificates

3.1.1 G HDCQualifications of Nondestructive

Testing Personnel

3.1.5 G HDCIndependent Party's Ultrasonic

Inspection Qualifications

3.1.6 G HDCIndependent Party's Radiographic

Inspection Qualifications

3.1.1Witness NDT Testing

SD-08 Manufacturer’s Instructions

3.1.1 G HDCManufacturer's Methods and

Procedures of Inspection

05 50 04.00 26 SD-03 Product Data

2.2.3Product Data

SD-06 Test Reports

2.2.1 G HDCMaterials List

2.2.1 G HDCMaterial Test Reports

2.2.2 G HDCMaterial NDT Reports

SD-07 Certificates

2.4.3.4 G HDCStructural Bolts

08 11 13.00 26 SD-02 Shop Drawings

2.1 G HDCDoors

2.3 G HDCFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

08 11 13.00 26 SD-03 Product Data

2.1 G HDCDoors

2.1 SRecycled Content for Steel Door

Product

2.3 G HDCFrames

2.3 SRecycled Content for Steel Frame

Product

SD-04 Samples

2.7.3 G ODFactory-applied Enamel Finish

08 71 00.00 26 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

09 90 00.01 26 SD-01 Preconstruction Submittals

1.5 G HDCSafety and Health Provisions

SD-03 Product Data

2.1 G HDCPaint Formulas

2.2 G HDCSolvents and Thinners

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

09 90 00.01 26 2.1 G HDCPaint Formulas

2.2 G HDCSolvents and Thinners

SD-06 Test Reports

3.4 G HDCInspection Reports

SD-07 Certificates

1.8.2 G HDCSSPC QP 2 Certificate

1.8.5 G HDCCoating Thickness Gage

Qualification

1.8.1 G HDCQuality Control Personnel

1.8.4 GQualification Of Applicator

26 05 00.01 26 SD-03 Product Data

2.5 G HDCSpare Parts and Special Tools

41 22 13.71 26 SD-01 Preconstruction Submittals

3.6.1 G HDCFinal Inspection and Acceptance

Test Procedure

1.6 G HDCTest Weight Plan

SD-06 Test Reports

3.3 G HDCCrane Weight

3.1.1 G HDCShop Inspection and Testing

Procedure

3.1.4 G HDCShop Inspection and Testing

Procedure

3.4 G HDCCrane Clearance/Coverage

Measurements

3.1.5 G HDCShop Inspection and Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.71 26 3.5.4 G HDCPre-Final Inspection and

Preliminary No-Load Performance

Test Report

3.6.7 G HDCFinal Inspection and Acceptance

Test Report

3.10 G HDCOil Test Results (After Load

Testing)

SD-07 Certificates

1.6 G HDCNon-Contaminated Equipment

Certifications

1.5.1 G HDCCrane Inspectors and Craftsmen

and Operators

3.8.2 G HDCVFD Technician

SD-08 Manufacturer’s Instructions

3.11.1 G HDCGeneral Operation and

Maintenance Training Agenda

3.11.3 G HDCSolid State Maintenance Training

Agenda

SD-10 Operation and Maintenance

Data

1.7 G HDCOperating Manual For the Cab

SD-11 Closeout Submittals

3.11.2 G HDCTraining Manuals

3.9 G HDCAs-Commissioned VFD

Parameters

41 22 13.72 26 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.72 26 1.7Field Measurements

1.8 G HDCRehabilitation Procedure

3.11.3.1 G HDCSpeed Reducer Flushing

Procedure

3.11.5.1 G HDCGear Inspection Procedure

3.11.5.2 G HDCBridge Truck Open Gear

Rehabilitation Procedure;

2.12.9.2 G HDCDrum Shell Measuring Procedure

SD-03 Product Data

2.15.4 G HDCGear Dimension, Quality, and

Hardness Verification Reports;

2.2.3 G HDCNameplate;

1.9.1 G HDCAccessories and Special Tools;

SD-05 Design Data

1.5.1Design Package Submittals

1.5.1 G HDCCrane Design Data

1.5.4.3 G HDCClearance/Coverage Diagram

1.4.11.3.2G HDCBolt Tension Chart

2.12.9.3 G HDCDrum Groove Measuring

Procedure

2.15.4 G HDCGear Dimension, Quality, and

Hardness Verification Procedure

3.10.1 G HDCBridge Travel Operational Test

Procedure

3.7.1Hoist Brake Alignment and

Run-In Procedure

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.72 26 2.7.2.1 G HDCOil Test Results (New Oil

Delivery)

2.4 G HDCWire Rope Magnetic Flux

Leakage Test Results (prior to installation)

3.6 G HDCDynamic Balancing Report;

3.13 G HDCDynamic Balancing Report;

2.13.2 G HDCTrolley Wheel Hardness Test

Report

3.5 G HDCShaft Alignment Report;

3.12 G HDCShaft Alignment Report;

3.6 G HDCBalance Quality Report;

3.13 G HDCBalance Quality Report;

2.14.5.2 G HDCHook Proof Test Report

2.12.9.2 G HDCDrum Shell Measurements

Report;

2.12.9.3 G HDCDrum Groove Measurements

Report;

SD-06 Test Reports

3.10.3 G HDCPre-Rehab Bridge Travel

Operational Test Report

3.10.3 G HDCPost-Rehab Bridge Travel

Operational Test Report;

3.11.5.1 G HDCGear Inspection Report

2.14.5.1.1G HDCHook Non-Destructive Test (NDT)

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.72 26 3.7.2 G HDCHoist Brake Torque Test Report

3.9Oil test results (12 month service)

SD-07 Certificates

1.5.1 G HDCRegistered Professional

Mechanical Engineer;

1.5.1 G HDCRegistered Professional

Structural Engineer;

2.4 G HDCWire Rope Certificates;

SD-11 Closeout Submittals

1.6.1 G HDCFinal Approved Versions of

Contractor Prepared Drawings;

1.6.1 G HDCFinal Calculations;

1.9.2Spare Parts

41 22 13.73 26 SD-03 Product Data

2.5 G HDCConcrete Anchors

SD-05 Design Data

1.4 G HDCDesign Data For Crane

Appurtenances

SD-06 Test Reports

3.2.2.1 G HDCContractor Qualification Testing

3.2.3.4 G HDCPost Installed Anchor Inspection

Report

41 22 13.74 26 SD-01 Preconstruction Submittals

3.3.4 G HDCControl System Factory Test Plan

SD-02 Shop Drawings

1.5.2 G HDCElectrical Drawing Index

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.74 26 1.5.3 G HDCBill of Electrical Materials

1.5.4 G HDCMain One-Line Drawing

1.5.5 G HDCSchematic Drawings

1.5.6 G HDCElectrical Interconnecting

Diagrams

1.5.7 G HDCElectrical Installation Drawings

1.5.8 G HDCCable and Conduit Schedule

1.5.9 G HDCCable Carrier Systems Drawings

SD-03 Product Data

2.4.4 G HDCPushbuttons and Selector

Switches

2.1.3 G HDCCable Carrier System

2.2.2 G HDCMain Line Disconnect

2.3 G HDCControl Systems and Equipment

2.1.2 G HDCConductor and Collector System

2.3.4 G HDCVariable Frequency Drives

(VFDs)

2.3.4.5 G HDCElapsed Time Meter

2.3.5 G HDCLimit Switches

2.4.3 G HDCOperator Chair

2.4.4 G HDCIndicating Lights

2.4.4 G HDCMaster Switches

2.4.5 G HDCRemote (Radio) Control System

2.5.1 G HDCLoad Cells and Indication

2.13 G HDCPOSITION INDICATION

2.5.3 G HDCWarning Signals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.74 26 2.6.1 G HDCMotors

2.7.1 G HDCHolding Brakes

2.8 G HDCPower, Heating, Lighting and

Convenience Outlet Systems

2.9 G HDCConduit and Wireways

2.10 G HDCInsulated Wire and Cable

2.11 G HDCTerminal Blocks

2.12 G HDCCabinets and Enclosures

2.8.2 G HDCPanelboards

2.8.3 G HDCMolded Case Circuit Breakers

2.3.4.3 G HDCLine And Load Reactors

2.2.3 G HDCUtility Disconnect

SD-05 Design Data

1.5.12 G HDCElectrical Calculations

3.2 G HDCArc Flash Analysis Information

2.3.4.4 G HDCDynamic Braking

SD-06 Test Reports

3.3.2Motor Test Reports

3.3.3Brake Test Reports

3.3.4Control System Factory Test

Results

3.3.5Field Wiring Test Reports

2.4.4.2Operator Cab Wiring Testing

SD-07 Certificates

2.7.4Brake Torque Rating

3.3.3Brake Torque Rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.74 26 1.5.1 G HDCRegistered Professional Electrical

Engineer

3.3.3 G HDCFactory Adjusted Torque Rating

Of Holding Brakes

SD-10 Operation and Maintenance

Data

1.5.10 G HDCFinal Approved Versions Of

Contractor Prepared Drawings

41 22 13.75 26 SD-01 Preconstruction Submittals

3.4.2 G HDCLoad Test Plan

3.4.3 G HDCLifting Device Weighing

Procedure

3.1Prepossession Lifting Device

Report

3.4.2 G HDCLifting Device Shop Test

Procedure

SD-02 Shop Drawings

2.1.1 G HDCNameplate for Lifting Device

2.1.2 G HDCSafety Label for Lifting Device

2.1.3 G HDCWorking Load Limit Markings

SD-06 Test Reports

3.4.5 G HDCLoad Test Report

3.4.3 G HDCLifting Device Weight Report

3.4.3 G HDCLifting Device Weight Report

3.4.3 G HDCWeighing Equipment Calibration

Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.75 26 SD-11 Closeout Submittals

3.5.1 G HDCLifting Devices O&M Manual

41 22 13.76 26 SD-01 Preconstruction Submittals

3.2 G HDCField Measurements and Lifting

Beam Pre-Test

2.1.3 G HDCWorking Load Limit Markings

3.3.1 G HDCShop Test Procedure

SD-02 Shop Drawings

2.1.1 G HDCNameplate for Lifting Beam and

or Lifting Devices

2.1.2 G HDCSafety Label for Lifting Beam and

or Lifting Devices

1.5.2.2 G HDCDetailed Shop Drawings

1.5.1 G HDCBill Of Materials and Schedule of

Equipment

1.5.2.1 G HDCDimensioned Design and

Assembly Drawings

SD-03 Product Data

1.5.3 G HDCProduct Data

2.5.1Hook Material Certification

2.4Pin Material Certification

SD-05 Design Data

1.5.4 G HDCPreliminary Design Calculations

1.5.5 G HDCDesign Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 23 PAGES

AFD Powerhouse Bridge Crane Rehab

41 22 13.76 26 3.2Existing Lifting Beam Weight

Report

3.3.3New Device Weight Report

1.5.6Lifting Beam Hooks NDE Report

3.3.1 G HDCShop Test Report

SD-07 Certificates

1.5Registered Professional

Mechanical Engineer

SD-11 Closeout Submittals

1.6.1 G HDCFinal Approved Versions of

Contractor-Prepared Drawings

1.6.2 G HDCFinal Calculations

3.5 G HDCLIFTING BEAM AND OR

LIFTING DEVICES O&M MANUAL

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR