This document is a section from the specifications for the Albeni Falls Dam (AFD) Powerhouse Bridge Crane (PHBC) rehabilitation project in Oldtown, ID, under solicitation W912DW24R0019 from the U.S. Army Corps of Engineers Seattle District.
The specifications cover the electrical work required for the bridge crane rehabilitation, including the removal of the existing electrical equipment and wiring, and the design, fabrication, factory testing, and field testing of new electrical and control equipment and associated systems. Key requirements include new crane runway conductors and collectors, cable carrier systems, control systems and equipment, motors, holding brakes, power/lighting/convenience systems, conduit and wiring, and accessories such as load cells, position indication, and warning signals. The specifications outline detailed technical requirements, submittals, and testing procedures for the electrical work. The overall project involves the full mechanical and structural rehabilitation of the 250-ton bridge crane at the Albeni Falls Dam powerhouse.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFD Powerhouse Bridge Crane Rehab 23011 Oldtown, ID W912DW24R0019
SECTION TABLE OF CONTENTS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 41 22 13.74 26
BRIDGE CRANE REHABILITATION ELECTRICAL WORK
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.5 QUALITY ASSURANCE
1.5.1 General
1.5.2 Electrical Drawing Index
1.5.3 Bill of Electrical Materials
1.5.4 Main One-Line Drawing
1.5.5 Schematic Drawings
1.5.6 Electrical Interconnecting Diagrams
1.5.7 Electrical Installation Drawings
1.5.8 Cable and Conduit Schedule
1.5.9 Cable Carrier Systems Drawings
1.5.10 Final Approved Versions Of Contractor Prepared Drawings
1.5.11 Submission of Product Data
1.5.12 Submission of Design Calculations
1.5.13 Submission of Test Results
PART 2 PRODUCTS
2.1 CRANE ELECTRIFICATION
2.1.1 General
2.1.2 Crane Runway Conductor and Collector System
2.1.2.1 General
2.1.2.2 Conductor
2.1.2.3 Collectors
2.1.3 Cable Carrier System
2.1.3.1 Cable Chain
2.1.3.2 Festoons
2.1.4 Generator Floor "Emergency STOP" Pushbuttons
2.1.4.1 "Emergency STOP" Pushbutton Conductors
2.2 SYSTEM PROTECTION
2.2.1 General
2.2.2 Main Line Disconnect
2.2.3 Utility Disconnect
2.2.4 Main Line Contactor
2.2.5 Main Line Phase Monitor
2.2.6 Surge Protection
2.3 CONTROL SYSTEMS AND EQUIPMENT
2.3.1 General
2.3.2 Control Power
2.3.3 Hoist and Travel Operating Features
2.3.3.1 Hoisting and Lowering
2.3.3.2 Hoisting and Lowering Performances
2.3.3.3 Tandem Main Hoisting and Lowering Performances
SECTION 41 22 13.74 26 Page 1 R0004
2.3.3.4 Bridge Travel and Trolley Travel
2.3.3.5 Travel Performances
2.3.3.6 Tandem Travel Performance
2.3.3.7 Positioning Accuracy
2.3.4 Variable Frequency Drives (VFDs)
2.3.4.1 General
2.3.4.2 VFD Operating Features
2.3.4.3 Line And Load Reactors
2.3.4.4 Dynamic Braking
2.3.4.5 Elapsed Time Meter
2.3.5 Limit Switches
2.4 OPERATOR CONTROL STATION
2.4.1 General
2.4.2 Location Of Controls And Control Equipment
2.4.3 Operator Chair
2.4.4 Operator Control Station Apparatus
2.4.4.1 Operator Control Station Apparatus Performances
2.4.4.2 Shop Inspection and Testing
2.4.5 REMOTE (RADIO) CONTROL SYSTEM
2.4.5.1 General
2.4.5.2 Crane Radio Control Transmitter
2.4.5.2.1 Radio Control Storage Enclosure
2.4.5.3 Transmitter Frequency Allocation
2.5 ACCESSORIES
2.5.1 Load Cells And Indication
2.5.1.1 Overload Annunciation
2.5.1.2 Overload Limit Bypass
2.5.2 Rigging Display
2.5.3 Warning Signals
2.5.3.1 Travel Warning Bell
2.5.3.2 Horn
2.5.3.3 Crane Operation Warning Lights
2.6 MOTORS
2.6.1 General
2.6.2 Motor Size, Speed, and Time Ratings
2.6.3 Motor Encoders
2.7 HOLDING BRAKES
2.7.1 Brake Type
2.7.2 Brake Release
2.7.3 Brake Mechanical Construction
2.7.4 Brake Torque Rating, Duty, and Adjustment
2.8 POWER, HEATING, LIGHTING AND CONVENIENCE OUTLET SYSTEMS
2.8.1 Utility Transformer
2.8.2 Power and Lighting Panelboards
2.8.3 Molded Case Circuit Breakers
2.8.4 Lighting
2.8.4.1 General
2.8.4.2 Working Area Floodlights
2.8.4.3 Cab Lights
2.8.5 Convenience Outlets
2.8.6 480VAC Power Outlet
2.9 CONDUIT AND WIREWAYS
2.9.1 Conduit
2.9.2 Conduit Fittings
2.9.3 Outlet, Junction, and Pull Boxes and Cover Plates for Conduit
2.9.4 Wireways
2.10 INSULATED WIRE AND CABLE
2.10.1 General
2.10.2 Material
SECTION 41 22 13.74 26 Page 2
2.10.3 Insulation
2.10.4 Jackets
2.10.5 Size
2.10.6 Stranding
2.10.7 Special Wire and Cable Requirements
2.10.7.1 Control Panel Wiring
2.10.7.2 Instrumentation Cable
2.10.7.3 Wire Near Resistors
2.10.7.4 Cable Carrier System Cable
2.10.8 Flame Tests
2.10.9 Wire Markers
2.11 TERMINAL BLOCKS
2.11.1 General
2.11.2 Control Signal Type
2.11.3 Power Terminal Blocks
2.11.4 Rail Terminal Blocks
2.12 CABINETS AND ENCLOSURES
2.12.1 General
2.12.2 Working Clearances
2.12.3 Control Cabinets
2.12.4 Control Cabinet Cooling
2.13 POSITION INDICATION
PART 3 EXECUTION
3.1 EQUIPMENT INSTALLATION
3.1.1 Crane Electrification
3.2 ARC FLASH ANALYSIS INFORMATION
3.3 ELECTRICAL TESTS
3.3.1 General
3.3.2 Motor Factory Testing
3.3.3 Holding Brakes Factory Testing
3.3.4 Control System and Equipment Factory Testing
3.3.5 Wiring Field Testing
3.4 FIELD TRAINING
3.5 OPERATION AND MAINTENANCE DATA
-- End of Section Table of Contents --
SECTION 41 22 13.74 26 Page 3
SECTION 41 22 13.74 26
BRIDGE CRANE REHABILITATION ELECTRICAL WORK
PART 1 GENERAL
In these Specifications, the word 'provide' means 'furnish and install' (applicable to materials, equipment, products, systems, etc. to be furnished and installed as part of the crane rehabilitation.
1.1 DESCRIPTION OF WORK
The work specified under this Section includes the removal of the operator controls,of all electrical equipment and wiring on the 250-ton bridge crane, and the design, fabrication, factory testing and field testing, furnishing, and installation of electrical and control equipment and associated systems. The equipment and associated systems includes motors, brakes, limit switches, complete control systems including remote (radio) control system, collectors and conductors, conduit, wiring, load cells and indication, and auxiliary devices required to replace and enhance crane electrical power, lighting, and control systems. Additional requirements are given in Section 26 05 00.01 26 BASIC ELECTRICAL MATERIALS AND METHODS FOR CRANES, and Section 41 22 13.71 26 BRIDGE CRANE DATA, TESTING AND
TRAINING.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASSOCIATION FOR IRON AND STEEL TECHNOLOGY (AIST)
AISE Technical Report No. 11 (1997) Brake Standards for Mill Motors
ASTM INTERNATIONAL (ASTM)
ASTM B3 (2013) Standard Specification for Soft or Annealed Copper Wire
ASTM B8 (2011; R 2017) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
ASTM B33 (2010; R 2014) Standard Specification for Tinned Soft or Annealed Copper Wire for Electrical Purposes
ASTM B172 (2017) Standard Specification for Rope-Lay-Stranded Copper Conductors Having Bunch-Stranded Members, for Electrical Conductors
ASTM B173 (2017) Standard Specification for Rope-Lay-Stranded Copper Conductors Having Concentric-Stranded Members, for
SECTION 41 22 13.74 26 Page 4
Electrical Conductors
ASTM B174 (2017) Standard Specification for Bunch-Stranded Copper Conductors for Electrical Conductors
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE Std 112 (2004) Standard Test Procedure for Polyphase Induction Motors and Generators
IEEE 383 (2015) Qualifying Class 1E Electric Cables and, Field Splices for Nuclear Power Generating Stations 2004
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 1940-1 (2003) Mechanical Vibration - Balance Quality Requirements for Rotors in a Constant (Rigid) State - Part 1:
Specification and Verification of Balance
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA C80.1 (2015) Standard for Electrical Rigid Steel Conduit (ERSC)
NEMA FB 1 (2014) Standard for Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable
NEMA ICS 1 (2000; R 2015) Industrial Control and Systems - General Requirements
NEMA ICS 2 (2000; R 2005) Industrial Control and Systems Controllers: Contactors and Overload Relays Rated 600 Volts
NEMA ICS 5 (2017) Industrial Control and Systems:
Control Circuit and Pilot Devices
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NEMA ICS 8 (2011) Crane and Hoist Controllers
NEMA MG 1 (2016) Motors and Generators
NEMA OS 1 (2013) Sheet-Steel Outlet Boxes, Device Boxes, Covers, and Box Supports
NEMA ST 20 (2014) Standard for Dry-Type Transformers for General Applications
NEMA PB 1 (2011) Panelboards
NEMA WC 57 (2014) Standard for Control, Thermocouple Extension, and Instrumentation Cables
SECTION 41 22 13.74 26 Page 5
NEMA WC 58/ICEA S-75-381 (2008) Portable and Power Feeder Cables for Use in Mines and Similar Applications
NEMA WC 70 (2009) Power Cable Rated 2000 V or Less for the Distribution of Electrical Energy--S95-658
NEMA WD 6 (2016) Wiring Devices Dimensions Specifications
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 1 (2005; Reprint Jan 2020) UL Standard for Safety Flexible Metal Conduit
UL 6 (2007; Reprint Sep 2019) UL Standard for Safety Electrical Rigid Metal Conduit-Steel
UL 44 (2018) UL Standard for Safety Thermoset-Insulated Wires and Cables
UL 62 (2018) UL Standard for Safety Flexible Cords and Cables
UL 66 (2002) Fixture Wire
UL 1686 (2012; Reprint Jan 2014) Standard for Pin and Sleeve Configurations
UL 360 (2013; Reprint Oct 2020) UL Standard for Safety Liquid-Tight Flexible Metal Conduit
UL 467 (2013; Reprint Jun 2017) UL Standard for Safety Grounding and Bonding Equipment
UL 489 (2016) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
UL 514A (2013; Reprint Aug 2017) UL Standard for Safety Metallic Outlet Boxes
UL 514B (2012; Reprint May 2020) Conduit, Tubing and Cable Fittings
UL 870 (2016; Reprint Mar 2019) UL Standard for Safety Wireways, Auxiliary Gutters, and Associated Fittings
UL 886 (1994; R 1999, Rev thru Nov 2005) Outlet Boxes and Fittings for Use in Hazardous (Classified) Locations
SECTION 41 22 13.74 26 Page 6
UL 1449 (2014; Reprint Jul 2017) UL Standard for Safety Surge Protective Devices
UL 1581 (2001; Reprint May 2020) UL Standard for Safety Reference Standard for Electrical Wires, Cables, and Flexible Cords
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
30 CFR 7.407 (2003) Test for Flame Resistance of Electric Cables and Cable Splices
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation or designations following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Control System Factory Test Plan; G, HDC
SD-02 Shop Drawings
Electrical Drawing Index; G HDC
Bill of Electrical Materials; G HDC
Main One-Line Drawing; G HDC
Schematic Drawings; G HDC
Electrical Interconnecting Diagrams; G HDC
Electrical Installation Drawings; G HDC
Cable and Conduit Schedule; G HDC
Cable Carrier Systems Drawings; G HDC
SD-03 Product Data
Pushbuttons and Selector SwitchesG HDC
Cable Carrier System; G HDC
Main Line Disconnect; G HDC
Control Systems and Equipment; G HDC
Conductor and Collector System; G HDC
SECTION 41 22 13.74 26 Page 7
Variable Frequency Drives (VFDs); G HDC
Drive Isolation Transformers; G HDC
Elapsed Time Meter; G HDC
Limit Switches; G HDC
Operator Chair; G HDC
Indicating Lights; G HDC
Master Switches; G HDC
Remote (Radio) Control System; G HDC
Load Cells and Indication; G HDC
POSITION INDICATION; G HDC
Warning Signals; G HDC
Motors; G HDC In addition to product data, provide performance characteristic curves for each motor to be furnished indicating current, torque, output, speed, efficiency, power factor, voltage, and input power, expressed in accordance with clause 12.31 of NEMA MG 1, per paragraph MOTOR FACTORY TESTING. Provide characteristics of the position encoders furnished with motors.
Holding Brakes; G HDC In addition to product data, provide dimension sheets for brakes and brake wheels, in accordance with Part 10 of NEMA ICS 8 .
Power, Heating, Lighting and Convenience Outlet Systems G HDC
Conduit and Wireways; G HDC
Insulated Wire and Cable; G HDC
Terminal Blocks; G HDC
Cabinets and Enclosures; G HDC
Panelboards; G HDC
Air Conditioning Equipment G HDC
Molded Case Circuit Breakers; G, HDC
Line And Load Reactors; G, HDC
Utility Disconnect; G, HDC
SD-05 Design Data
Electrical Calculations; G HDC
SECTION 41 22 13.74 26 Page 8
Arc Flash Analysis Information; G HDC
Dynamic Braking; G, HDC
SD-06 Test Reports In accordance with paragraph TEST RESULTS. Submit no later than 10 days after completion of tests:
Motor Test Reports
Brake Test Reports
Control System Factory Test Results
Field Wiring Test Reports
Operator Cab Wiring Testing
SD-07 Certificates
Brake Torque Rating
Registered Professional Electrical Engineer; G HDC
Factory Adjusted Torque Rating Of Holding Brakes; G, HDC
SD-10 Operation and Maintenance Data
Final Approved Versions Of Contractor Prepared Drawings; G HDC
1.4 GENERAL REQUIREMENTS
General requirements are given in Section 26 05 00.01 26 BASIC ELECTRICAL
MATERIALS AND METHODS FOR CRANES.
1.5 QUALITY ASSURANCE
1.5.1 General
Stamp and sign all electrical computations and drawings by a Registered Professional Electrical Engineer who has done the design himself/herself or supervised and reviewed work if done by other engineers.
1.5.2 Electrical Drawing Index
Submit a comprehensive index of shop drawings for each drawing set. The index must be part of the accompanying drawing set, having a title block, border, and sheet number that is compatible with the drawing set.
1.5.3 Bill of Electrical Materials
Submit a bill of electrical materials (schedule of equipment) for each shop drawing set. Provide a schedule that is part of the drawing set, having a title block, border, and sheet number compatible with the drawing set. The schedule must include the total quantity, manufacturer, part number, and location of each item of equipment supplied. Include a cross
SECTION 41 22 13.74 26 Page 9 reference between manufacturer data and shop drawings (schematic drawings component identification within the schedule). Incorporate corresponding product data sheets with the submittal of bill of electrical materials.
1.5.4 Main One-Line Drawing
Submit an overview drawing, or one-line, of crane's power and lighting systems. The one-line must be confined to one (1) drawing sheet and have a title block and border compatible with the schematic drawings.
1.5.5 Schematic Drawings
Submit wiring schematics for power, lighting, and control circuits, enclosures, and equipment. Schematic drawings must indicate crane runway conductor system collectors and trolley supply conductors. Indicate terminal board connections, wire designations, and size and type of wire on schematic drawings.
1.5.6 Electrical Interconnecting Diagrams
Submit drawings showing interconnections between devices internal to equipment enclosures (control panels) and external equipment and assemblies. Indicate terminal board connections and wire designations on interconnecting diagrams.
1.5.7 Electrical Installation Drawings
Submit plan and elevation views of the crane, indicating locations and layout of all electrical equipment, including cabinets, motors, brakes, limit switches, lighting, controls, and cable carrier systems, with dimensions. Indicate adequate working clearances and conduit and cable routes. Show elevation view of control panels including internal devices, as seen by an observer standing in front of the open cabinet. Include detailed locations of all drilling required in structural members to mount new equipment. Include weights of major items (control panel, motors, brakes, etc.) on the drawings.
1.5.8 Cable and Conduit Schedule
Submit a comprehensive schedule of cable and conduit that cross references with the schematic drawings. The schedule must have a title block and border compatible with the schematic drawings. At a minimum the schedule must include conduit and cable size, name, type, length, insulation and rated voltages, function, and from/to termination descriptions.
1.5.9 Cable Carrier Systems Drawings
In addition to product data, submit dimensioned outline drawings detailing placement and operation of trolley cable carrier systems .
1.5.10 Final Approved Versions Of Contractor Prepared Drawings
Submit final approved versions of Contractor prepared drawings in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Update Contractor prepared drawings if there are any outstanding comments. Record and incorporate modifications made during fabrication and installation (as-built). Insert a set of 11 by 17 inch final approved versions of
SECTION 41 22 13.74 26 Page 10
Contractor prepared drawings into the operation and maintenance manuals.
1.5.11 Submission of Product Data
Submit all product data in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit product data in conjunction with the Bill of Electrical Materials. Include complete descriptive literature and specifications of each product or system of products listed in the submittal article with original, legible manufacturer's cut sheets and data sheets to clearly indicate physical construction, operation, electrical characteristics, ratings, and associated hardware. Show conformance with these specifications within the product data, including, but not being limited to, product manufacturers' declarations of conformance to applicable technical standards. Product data will be used for supporting approval of components shown or listed on the drawings.
Acceptance of product data alone does not give approval for procurement of associated materials and equipment. Approval of items for which product data is submitted will be by approving drawings that list these items on the corresponding bill of electrical materials.
1.5.12 Submission of Design Calculations
Submit electrical calculations for approval in conjunction with the submission of corresponding product data and shop drawings. Within the calculations, include: worst-case loading of the crane (cite assumptions, Codes, and Standards applied to calculation); minimum required horsepower for each drive motor; conductor sizing; overcurrent protection;
size/rating of each transformer; lighting calculations demonstrating specified illumination level; torque rating required for holding brakes;
and other computations as required to show conformance with these specifications and suitability of the existing breaker sizes.
1.5.13 Submission of Test Results
Document and submit results of tests performed in accordance with paragraph ELECTRICAL TESTS to the Government within ten (10) days after completion of the test .
PART 2 PRODUCTS
2.1 CRANE ELECTRIFICATION
2.1.1 General
Electrical power for the bridge crane is supplied to the existing rigid copper angle conductors from a nominal 480-volt, 3-phase, 60 Hz HRG grounded system. Existing power feed is from the station power center Main Auxiliary Board, Breaker B9 using 3/0 AWG conductors.
2.1.2 Crane Runway Conductor and Collector System
For structural aspects of work related to the overhead conductor and collector system refer to Section 41 22 13.73 26 BRIDGE CRANE
APPURTENANCES.
2.1.2.1 General
a. The crane runway conductor/collector system must have three (3) phase conductors, a separate ground conductor and complete insulated mounting
SECTION 41 22 13.74 26 Page 11 hardware. Voltage rating must be 600 volts, minimum. The crane runway conductor system must have a separate bonding conductor. The bridge structure must not be considered "electrically grounded" through the contact between the bridge wheels and the rail.
2.1.2.2 Conductor
The conductors must be copper, or aluminum with stainless steel contact surface with flexible insulating shrouds that prevent inadvertent contact of live parts. Conductor system must be 3-phase, and rated large enough to service the worst-case loading, and limit the voltage drop to 2 percent at the point of contact with the collectors. Minimum ampacity must be 200 amps. Provide conductor expansion sections for the system as recommended by the conductor system manufacturer.
2.1.2.3 Collectors
Collectors must be the sliding shoe type, spring-loaded, with a rating adequate to serve worst-case loading of the bridge crane, but not less than the rating of the feeder breaker. Each phase must have an assembly with two (2) shoes placed in tandem and spaced approximately 20 inches apart. Each collector shoe of the tandem assembly must be rated for full-capacity. Collector shoes must be compatible with the crane runway conductor system and must be easily replaceable. Provide complete collectors with manufacturer-approved mounting assembly for installation on the bridge structure.
2.1.3 Cable Carrier System
Provide power and controls to the trolley by one of the following means:
2.1.3.1 Cable Chain
The cable carrier system must be a "Cable Chain" type. The cable carrier system must be heavy-duty, maintenance-free, corrosion-resistant, and designed for long-travel applications. The cable carrier system must have a bend radius of greater than the minimum bending radius of the largest cable to prevent cable stress. The cable carrier system must be designed to support the application on the crane with regard to cable fill, travel length, and environmental ratings. Follow the manufacturer's recommendations for installation. Provide junction boxes and additional manufacturer-approved hardware necessary for installation on the bridge structure. With the exception of encoder and signal level cables, terminate all cables at both ends in dedicated cable carrier junction boxes. The cable carrier system must support jacketed and color-coded multiple-conductor power and control cables conforming to the requirements of paragraph INSULATED WIRE AND CABLE. Provide a dedicated grounding conductor for the trolleys.
2.1.3.2 Festoons
Festoon cables must be supported by four-wheel, heavy- or mill-duty carriers running on a common "I"-beam type rail. Festoon carrier wheels must be provided with lifetime-lubricated, anti-friction bearings.
Securely clamp festoon cables at each crest and each trough to prevent movement, twisting, and binding. Provide manufacturer-approved clamping saddles for crests and troughs. Festooned cable loops must not extend
SECTION 41 22 13.74 26 Page 12 below the bottom of the bridge girders. Provide junction boxes and additional manufacturer-approved hardware necessary for installation on the bridge structure. With the exception of encoder and signal level cables, terminate all cables at both ends in dedicated junction boxes.
The festoon system must support jacketed and color-coded multiple-conductor power and control cables conforming to the requirements of paragraph INSULATED WIRE AND CABLE. Provide a dedicated grounding conductor for the trolleys.
2.1.4 Generator Floor "Emergency STOP" Pushbuttons
Replace the generator floor "Emergency STOP" pushbutton and associated shunt trip control conductors. The "Emergency STOP" pushbutton is located at Elevation 2060the main generator floor. "Emergency STOP" pushbutton must be red "Twist-to-Release" mushroom style and have a guard to prevent accidental activation. Label pushbuttons stations as "CRANE EMERGENCY
STOP".
2.1.4.1 "Emergency STOP" Pushbutton Conductors
Replace the existing conductors from each "Emergency STOP" pushbutton to the crane runway conductor feeder circuit breaker in the Main Auxiliary Board. The replacement conductors must meet paragraph INSULATED WIRE AND CABLE and be no smaller than 12 AWG.
2.2 SYSTEM PROTECTION
2.2.1 General
Mount protective equipment specified herein on steel panels and terminate wires to terminal blocks or studs, complete and ready for making external connections. Panels must be enclosed in cabinets as specified in Paragraph "CABINETS AND ENCLOSURES." Control panels and the main line disconnect must be located as shown. Mount the main line phase monitor and surge protection inside control panels.
2.2.2 Main Line Disconnect
Provide a main line circuit breaker disconnect listed to UL 489 to remove power from the crane's motion circuits. The breaker must be 600-volt, 3-pole, 25kAIC (minimum), manually-operated, molded case circuit breaker having suitable continuous rating. Mount the breaker in its own dedicated panel enclosure and provide means to permit operation of the breaker without opening the enclosure door. The breaker must be capable of being locked in the open position and have a minimum rating of 10,000 mechanical (manual) operations. Install the main line disconnect on the bridge walkway.
2.2.3 Utility Disconnect
Provide a utility disconnect circuit breaker listed to UL 489 to remove power from the crane's utility (auxiliary) circuits including motor heaters, convenience outlets, area lighting, and panel heaters. The intent of the utility disconnect is to remain ON (CLOSED) when the crane is not in use. The breaker must be 600-volt, 3-pole, 25kAIC (minimum), manually-operated, molded case circuit breaker having a suitable continuous rating. Mount the breaker in its own dedicated panel enclosure and provide means to permit operation of the breaker without opening the
SECTION 41 22 13.74 26 Page 13 enclosure door. The breaker must be capable of being locked in the open position and have a minimum rating of 10,000 mechanical (manual) operations. Install the utility disconnect the bridge walkway adjacent to the control panels.
2.2.4 Main Line Contactor
Provide a main line contactor that is 3-pole magnetic contactor to switch power to the crane's motion control circuits, with provisions to de-energize and drop-out the contactor during any condition of undervoltage, reverse-phase, or open-phase by the main line phase monitor. Include three installed spare auxiliary contacts, which can be easily changed from normally open to normally closed, in addition to those required by the control system design.
a. Contactor Rating, Performance, and Service Characteristics:
(1) The contactor must be the electrically-operated, magnetically-held type, insulated for 600 volts AC.
(2) Coils must be suitable for continuous operation at 120 volts AC, or as otherwise approved.
(3) The contactor's rating, performance, and service characteristics must conform to requirements of NEMA ICS 2 for contactors with continuous current ratings for the duty indicated.
(4) The contactor must be rated for full-voltage starting (Class A controllers) and be suitable for at least 200,000 complete operations under rated load without more than routine maintenance.
(5) Contacts must be easily replaceable.
(6) The contactor's current-carrying contact surfaces must be surfaced with silver or other approved material to prevent the formation of high-resistance oxides.
b. Contactor Operating Features:
Provide the contactor with its operating coil energized from the main line through a control power transformer. If the contactor is de-energized it must be necessary to return all cab master switches to the "OFF" position before the main line contactor can be re-closed. The contactor must de-energize when any of the "Emergency STOP" or power "STOP/OFF" pushbuttons is operated and as directed in these specifications. The contactor must operate without chatter or perceptible hum while energized.
2.2.5 Main Line Phase Monitor
Provide a main line phase monitor located on the line side of the main line contactor; the phase monitor must provide protection against phase unbalance, phase loss, phase reversal, undervoltage, and overvoltage.
Upon sensing fault, the protector must de-energize and drop-out the main-line contactor. The protector must use a combination of voltage and phase-angle sensing to detect phase loss even when regenerated voltages are present. The protector must have an adjustable line voltage trip
SECTION 41 22 13.74 26 Page 14 level, adjustable trip delay, and both automatic and manual reset.
Protector operation must have repeatability of +1 percent of set point, maximum, and a dead band of 2 percent maximum. Protector must have LED indicators to show normal and tripped status.
2.2.6 Surge Protection
Provide Type 2 transient voltage and current surge protection to protect all of the crane electrical power and control systems. Surge protection equipment must be listed to UL 1449 . Surge protection must be rated for their service (i.e. rated for delta connection when installed on an ungrounded (delta or high resistance grounded) system).
2.3 CONTROL SYSTEMS AND EQUIPMENT
2.3.1 General
Provide crane control systems and components that comply with the applicable provisions of NEMA ICS 8 . Design the control system such that operator interface, control commands, and load indication are not processed through a programmable logic controller (PLC). Controls must have static reversing of the direction of hoist or travel and provide smooth acceleration, deceleration, and stopping at all speeds and loads while operating within safe limits of overload currents. Design controls to be fail-safe, causing motor holding brakes to set automatically on control malfunction, protective device operation, or loss of power and so that, no matter how erratically the master switch handle may be operated, there must be no damage to controls or equipment, nor any danger of uncontrolled lowering of the load. Control voltage must be 120 VAC or 24
VDC.
In addition:
a. Master Switches: All hoist and travel motions must be individually controlled with separate controllers and capable of simultaneous usage.
b. Variable Frequency Drives: All motions must have separate controllers, as directed by Paragraph VARIABLE FREQUENCY DRIVES (VFD).
c. Hoist Ultralift Control: Provide controls with field-selectable settings to allow driving each main and aux hoist motor at greater than rated speeds (ULTRASPEED) when loads are light, up to 200 percent rated speed, inversely proportional to load. Provide Selector switches and control circuits to allow the operator to use this feature only when desired.
d. Hoist/Trolley/Bridge Microspeed Control: Provide hoist, trolley, and controls with speed range selector switches to allow the operator to select full- or reduced-range speed control over full travel of the master switch. Provide reduced-range control that, when selected, the master switch continuously varies the speed setting from zero to a lower value within the full speed range. The reduced-range value must be field- programmable to between 10 and 30 percent of full speed, initially set to 25 percent.
NOTE: The microspeed selection switch and ultralift selection switch (detailed above) may be incorporated in a single three-position maintained selector switch (MICRO-NORMAL-ULTRA or SLOW-NORM-FAST);
when the speed selection switch is in the ULTRA (Ultralift) position
SECTION 41 22 13.74 26 Page 15 the trolley travel functions must operate in the normal speed mode of operation.
e. "START & STOP" Pushbuttons: Provide controls with two pushbuttons, Momentary-contact type, for activating and deactivating the main line contactor. Pushbuttons must be located on the operator control station, as shown and be colored "Green" for "START" and "Red" for "STOP". Provide main line contactor controls in the form of pushbuttons or a maintained selector switch on the radio remote.
f. Crane Energized Indicating Lights: Provide white lamps on the operator control station console and remote (radio) control to indicate that the crane's motion circuits are energized.
g. "Emergency STOP" Pushbutton: Locate controls on the left console on the operator control station. "Emergency STOP" Pushbutton must remove all power for the crane motion circuits. The "Emergency STOP" Pushbutton must not be designed to be used for normal operation of the crane power-off. "Emergency STOP" Pushbutton must be red "Twist-to-Release" mushroom style with e-stop guard to prevent accidental activation and provide warning when activated. Label emergency stop pushbuttons as "EMERGENCY STOP".
h. Provide an "Emergency STOP" Pushbutton for the remote (radio) control.
i. Brake Failure Indicating Lights: Provide a flashing red lamp to indicate holding brake failure for any hoist brake, located on the operator control station console. Provide annunciation of brake failure on the stack lights per Paragraph "Crane Operation Warning Lights".
j. Warning Signal Pushbuttons: Provide a pushbutton for manual activation of the travel bell and warning lights located at the operator control station. Operational requirements of the warning signals are given in Paragraph "WARNING SIGNALS."
k. Remote (Radio) Control: Provide a "Remote (Radio) Control Switch" on the console of the operator control station to allow the operator to select either remote or local control. The selection of remote control must still permit only the use of the "STOP" pushbutton and the "Emergency STOP" pushbutton inside the operator cab. A blue pilot light must be provided on the operator control station console to indicate that cab control has been transferred to remote (radio) control.
l. Tandem Selector Switch: Provide a selector switch in the cab for main hoists and trolleys to operate in tandem. In tandem mode, main hoist or trolley motions must be synchronized and controlled by the use of one master switch. This control will not be allowed on the radio remote.
2.3.2 Control Power
Supply control power from a provided encapsulated control transformer meeting NEMA ST 20 . The transformer must be two-winding, 480/120-volt, single-phase, 60-Hz, dry-type, air-cooled, and continuous-rated. Secondary power circuits must be individually fused or protected by a circuit breaker. Provide individual circuit protection for the Radio Remote
SECTION 41 22 13.74 26 Page 16
Control System, Load Cell System, and others as per the approved control systems design.
2.3.3 Hoist and Travel Operating Features
2.3.3.1 Hoisting and Lowering
a. Provide variable speed control from zero to 100 percent for both hoisting and lowering. Additionally, provide fast speed operation above rated speed as described in this section. Include means to limit the maximum torque a hoist motor can develop and configure the controls such that hook loads greater than 150 percent rated capacity of each hoist cannot be lifted. The load-speed characteristics must be inherent in the controls at all speed positions. Positive control of the lowering movement of all hoist hooks must be maintained under all conditions of load.
b. Controls must be provided with adjustable compensation that allows initial electronic adjustment of the speed between hoists operating at the same selected speed and load to be within 0.1 percent of each other during synchronized operation.
2.3.3.2 Hoisting and Lowering Performances
The following hoisting and lowering performances are required, and must be suitable for administering all loads, from no load on the hook to rated load.
a. The speed control setting for hoisting and lowering must provide one-tenth of one (0.1) percent speed regulation, 1000 to one (1000:1) speed control range, and position control at zero speed. The starting speed control setting must start at the beginning of the master switch range (directional microswitch run command to the VFD). Hoist motion must meet the requirements of Paragraph Positioning Accuracy of this section.
b. Hoists. The highest (fastest) normal speed control setting for hoisting and lowering must provide a hoisting speed of 100 percent rated speed at rated load. This setting must be field-programmable for a range of 100 to 250 percent rated speed, operable above 100 percent rated speed only when there are light loads on the hook/block and when the ultra-lift is selected via the ultra-lift selector switch. The initial setting for ultra-lift must be 200 percent rated speed.
c. All intermediate speed control settings for hoisting and lowering must operate linearly between the starting speed control setting and the highest (fastest) speed control setting.
d. Sufficient starting torque such that when motion is initiated from standstill with 100% of rated load on any hoist less than one-sixteenth (1/16) inch of roll back is measured at the load.
2.3.3.3 Tandem Main Hoisting and Lowering Performances
There must be no more than one-quarter of an inch difference per twenty feet of hoisting or lowering measured in one direction, or as otherwise approved, between all hoist in tandem. All "Hoisting and Lowering Performances" must be achieved in tandem.
SECTION 41 22 13.74 26 Page 17
2.3.3.4 Bridge Travel and Trolley Travel
Provide variable speed control from zero to 100 percent for each direction of travel regardless of hook loads. Provide sufficient speed droop or other acceptable means in the trolley travel drives to permit satisfactory operation when both drive motors are operating together while in tandem mode. Steady-state operating deviation must each not exceed one-tenth (1/10) percent of the rated speed for all hook loads.
2.3.3.5 Travel Performances
Provide Bridge and trolley travel performances as follows:
a. The speed control setting for travel must have a minimum operating travel speed of no more than one percent of the 100 percent rated travel speed. The starting speed control setting must start at the beginning of the master switch range (directional microswitch run command to the VFD). Travel motions must meet the requirements of Paragraph "Positioning Accuracy" of this section.
b. The highest (fastest) speed control setting for travel must be 100 percent rated travel speed (for normal operating speed).
c. All intermediate speed control settings for travel must operate linearly between the starting speed control setting and the highest (fastest) speed control setting.
2.3.3.6 Tandem Travel Performance
There must be no more than one-quarter of an inch difference per twenty feet of trolley motion measured in one direction, or as otherwise approved, between trolleys operating in tandem. Provisions must be made to prevent inadvertent separation of the trolleys while physically or electrically still connected.
2.3.3.7 Positioning Accuracy
Design the control system so that it is possible to limit the motion of any hoist or travel motion to not more than 1/16 inch by quick actuation of the respective master switch controller in the microspeed selection, with any load, up to and including, the rated load. The intent of this requirement is that the crane may position the load accurately with small movements of the crane functions. The Government will verify positioning accuracy during acceptance testing.
2.3.4 Variable Frequency Drives (VFDs)
2.3.4.1 General
Provide variable frequency drives (VFDs) of a type regularly supplied and specifically designed for use on cranes. VFD type and revision must be the current offering from the manufacturer and still in production at the time of the transmittal of the submittal. All VFDs must be from the same manufacturer. Drive controllers for hoists must be variable-frequency AC with closed-loop flux vector control with feedback from a motor-shaft-mounted encoder. Drives for trolley and gantry travel must be
SECTION 41 22 13.74 26 Page 18 capable of both variable-frequency AC with open-loop vector or V/Hz control.
2.3.4.2 VFD Operating Features
a. Provide a separate VFD for each motion. VFDs for each motion must provide true four-quadrant control and be the solid state, pulse width modulated (PWM) type with adequate capacity to drive motors at all specified loads and speeds. VFDs must be rated for continuous duty with an ambient temperature of 40 degrees C at the motor rated current. VFDs must have an overload capacity rating of 150 percent rated load for 1 minute. Speed regulation must be less than 1.0 percent from no-load to full-load, over the entire frequency range.
Acceleration and deceleration must be separately adjustable from 0.1 to 25 seconds. Include motor overload protection with the VFD. The control circuits must include an adjustable-operating current-limiting circuit capable of limiting maximum current to not more than the current necessary to obtain 200 percent motor torque.
b. VFDs must be capable of monitoring current and speed to verify that enough motor torque has developed before the holding brakes are released ("torque proving" for hoist functions) and monitoring current and speed to verify that holding brakes are maintaining load before removing power from the motor (for hoist functions).
c. VFDs used for hoists must monitor for failure of the hoist brakes.
When brake failure or slipping is detected based on encoder feedback the drive must maintain the load in position and allow for lowering the load. Means of enabling, disabling, and adjusting the sensitivity of the brake failure alarm must be provided with adjustable VFD parameters. When a brake failure event is detected a warning light must activate accompanied by an audible alarm, distinct from other crane audible annunciations. When a brake failure event is detected, the red lamp on the crane operation warning light stack must illuminate. Provide a brake failure red indication lamp on the operator console that illuminates when a brake failure event is detected.
d. Each VFD must be equipped with a control pad to adjust drive parameters, display drive faults, display drive recorded status at the most recent fault (including, as a minimum: current, output frequency, output voltage, and digital input and output status), display elapsed time of operation, and display drive status including VFD output voltage, current, and frequency. Mount the control pad on the outside of the control panel such that it may be accessed without working in an energized panel. VFDs must be capable of storing, as a minimum, the five most recent fault conditions which must remain accessible after cycling power to the drive. Control pads must be no lower than four (4.0) feet and no higher than five and one half (5.5) feet from the walking surface in front of the panels.
2.3.4.3 Line And Load Reactors
Provide line and load reactors where recommended by the manufacturer of the variable frequency drives. Reactors must be of the type specifically designed for use with variable frequency drive systems and be applied in accordance with the VFD manufacturer's documented recommendations. All
SECTION 41 22 13.74 26 Page 19 reactors must be rated for continuous duty operation based upon the motor nameplate amperes and be designed for 60 Hz operation.
2.3.4.4 Dynamic Braking
Provide a submittal for dynamic braking showing calculations and/or VFD manufacturer specifications demonstrating adequate selection of dynamic braking resistors. Provide dynamic braking for each hoist and travel function VFD. Mechanical or electrical load brakes must not be used.
Resistors for dynamic braking circuits must: be corrosion-resistant type and have resistance values and power ratings as required by the VFD manufacturer for the application used. Hoists must be provided with resistors rated for continuous use at 150 percent braking torque per Part 11 of NEMA ICS 8 . Gantry and trolley travel resistors must be rated for 60 seconds on and 60 seconds off at 150 percent braking torque per Part 11 of NEMA ICS 8 . Each dynamic braking resistor must be shielded to allow for proper ventilation while providing adequate protection from objects falling or being dropped into the resistor enclosure from above.
2.3.4.5 Elapsed Time Meter
In addition to elapsed time of operation function required to be integral the VFDs, provide one elapsed time meter to measure overall operating time of the crane. The indicator must be non-resettable to accumulate total operating time of the main line contactor in increments of tenths of an hour and have a range of 99999.9 hours. Malfunction or failure of the meter must not adversely affect the crane's control systems.
2.3.5 Limit Switches
a. Provide limit switches in accordance with these specifications and as required per the manufacturer's approved design. All limit switches must: be UL Listed; be constructed in accordance with NEMA ICS 5 ; be provided with nonventilated NEMA Type enclosures constructed in accordance with NEMA ICS 6 ; and be mounted where they are readily accessible for adjustment and inspection by site maintenance personnel. Contact ratings must be not less than the maximum currents of the devices they switch. All limit switches must be the control circuit type and not interrupt power to the motor directly.
(1) Hoist Block Activated Upper Limit (Secondary Upper Limit).
Provide a normally-closed, momentary contact, weighted-lever type limit switch actuated directly by the lower blocks. Upon actuation of the limit, upward hoist movement must stop. When this limit is reached, hoist movement must be blocked in either direction.
Provide a local bypass switch installed on the hoist control panel to lower out of the secondary upper limit switch range. The secondary upper limit is used as back up limit if the upper rotary (primary) limit were to fail. The weighted upper limit switch must be set no lower than the height of the primary upper limit switch setting plus the primary limit runout distance, but not less than the secondary runout distance below the lowest contact point of the hoist or trolley structure (two-block condition). The runout distances are defined as the load block maximum drift, after switch activation, in the hoisting direction at maximum speed (ultralift selection, up to 200% of base speed) with no load on the hoist. Block activated upper limits are required on all hoists. Provide an alarm and associated means of indication in the operator cab for block activated upper limit switch actuation.
SECTION 41 22 13.74 26 Page 20
(2) Hoist Upper Rotary Limit (Primary Upper Limit). Provide a normally-closed, momentary contact, traveling-nut or rotating-cam rotary type limit switch, driven through gearing by the hoist.
Provide the rotary upper limit switch to allow the operator, when hoisting, to activate a first initial upper rotary limit switch that slows the hoisting speed down to 25 percent speed. Lowering out of the upper slowdown limit must allow for full speed. The initial setting of the slowdown limit must be approximately two feet below the rotary upper stop limit. Upon actuation of a second rotary limit, upward hoist movement must stop but the operator must still be able to lower the blocks out of the primary upper limit. When this limit is reached, lowering the load blocks must automatically reset the limit switch. The primary upper limit switch must be set at the maximum practical load block height but still allow for the distances required for the secondary (block activated) upper limit. Rotary upper limits are required on all hoists.
(3) Hoist Lower Limit. Provide a normally-closed, momentary contact, lever-arm type limit switch, actuated directly by the wire rope to stop downward hoisting. The limit switch must reset after reversing the movement (raising) of the hoist. Lever arm type lower limits are required on all hoists.
(4) Hoist Lower Rotary Limit. Provide a normally-closed, momentary contact, traveling-nut or rotating-cam rotary type limit switch, driven through gearing by the hoist. Provide the rotary lower limit switch to allow the operator, when lowering, to activate a first initial lower rotary limit switch that slows the hoisting speed down to 25 percent speed. Raising out of the lower slowdown limit must allow for full speed. The initial setting of the slowdown limit must be approximately ten feet above the rotary lower stop limit. Upon actuation of the limit, lowering hoist movement must stop but the operator must still be able to raise the load blocks out of the lower limit. When this limit is reached, raising the load blocks must automatically reset the limit switch. Set the lower limit switch at the minimum practical load block height. No less than two wraps of rope must remain on the drum when the hoist lower rotary limit is reached. Rotary lower limits are required on all hoists.
(5) Trolley Travel. Provide a normally-closed, maintained contact, adjustable lever type limit switch, capable of being reset by reversing the movement of the trolley. When the limit is reached, trolley movement must decelerate to a maximum of 25% of rated speed (field-programmable between 10% and 30% of full speed). Provide limits on each end of trolley runway to prevent the trolley from running into the trolley end stops at full speed.
The trolley must be able to reverse out of the limit at rated speed or slow speed, if selected. Travel limits are required on all trolleys.
(6) Bridge Travel Limits. Provide a normally-closed, maintained contact, adjustable lever type limit switch, capable of being reset by reversing the movement of the bridge. Provide the north and south ends of the bridge travel runway with apparatus used to actuate the limit switches on the crane. Provide initial limits on each end of the crane runway such that when the limit is reached, SECTION 41 22 13.74 26 Page 21 bridge movement decelerates to a maximum of 25% of rated speed (field-programmable between 10% and 30% of full speed). Provide limits on each end of crane runway. The bridge function must be able to reverse out of the limit at rated speed or slow speed, if selected. The bridge must be able to reverse out of the stop limits at rated speed or slow speed, if selected.
b. All limit switch trip mechanisms must be new and connected as necessary to accommodate new limit switches. Submit arrangement, placement, and construction of the limit switches and trip mechanisms for approval.
c. Provide a spring-returned two position keyed bypass switch for each hoist to bypass the rotary (primary) upper limit. Locate the keyed bypass switch on the respective hoist control panel door, accessible without opening the panel. The right position (actuated position) of the keyed switch must allow bypassing of the hoist upper rotary limit and upper slowdown limit to allow the hoist block activated upper limit (secondary upper limit) to be tested. The left position (un-actuated, spring return) position of the bypass switch must be the "normal" position with neither limit being bypassed.
2.4 OPERATOR CONTROL STATION
2.4.1 General
Operator control of crane motions must be accomplished by control switches located at the consoles of the operator chair in the cab and also at the radio transmitters. Annunciation must be accomplished by indicating lights placed in the operator chair. Control apparatus properties and construction must be in accordance with paragraph Operator Control Station Apparatus, Operator Chair and Crane Radio Control Transmitter.
2.4.2 Location Of Controls And Control Equipment
Install controls and control equipment as…