01 11 00.00 26 R0003.pdf

PDF 19 KB Posted

Attached to
W912DW24R0019 - Albeni Falls Dam (AFD), Powerhouse Bridge Crane (PHBC), Oldtown, ID
Solicitation number
W912DW24R0019
Issued by

About this file

This document is a section of the specifications for the Albeni Falls Dam (AFD) Powerhouse Bridge Crane (PHBC) Rehabilitation project, Solicitation Number W912DW24R0019, issued by the U.S. Army Corps of Engineers, Seattle District.

The key details are:

The project involves removing and replacing various components of the existing bridge crane, including the trolleys, hoists, controls, and access walkways. The work is located at the Albeni Falls Dam Powerhouse in Oldtown, ID. The facility will remain occupied and operational during the construction activities. The contractor is required to prevent damage to existing equipment and infrastructure, and repair or replace any portions altered during the work. The specification covers the summary of work, but does not provide the technical details for the particular work activities. The contractor is required to provide operation and maintenance manuals, as-built drawings, and commissioning support for the completed installation.

View the file

Other files

File Type Posted
Amendment 0005 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
Specs Section 41 22 13.74 26 R0004.pdf PDF
Amendment 0004 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
Reference Drawing E-52-18-4-88 R0004.pdf PDF
G-202 R0003.pdf PDF
M-101 R0003.pdf PDF
Photo I R0003.pdf PDF
E-52-18-4-102 R0003.PDF PDF
Submittal Register R0003.pdf PDF
G-002 R0003.pdf PDF
01 33 16.00 28 R0003.pdf PDF
Photo D R0003.pdf PDF
South Bridge Crane Trolley Rail HLL R0003.pdf PDF
CENWS ODA HECP Appendix D R0003.pdf PDF
01 35 26 R0003.pdf PDF
AFD Fall Protection Submittal R0003.pdf PDF
E-52-18-1-101 R0003.PDF PDF
e-52-18-3-66 R0003.PDF PDF
E-52-18-7-4 R0003.PDF PDF
Photo E R0003.pdf PDF
41 22 13.76 26 R0003.pdf PDF
Photo G R0003.pdf PDF
E-52-18-7-1 R0003.PDF PDF
01 11 00.01 28 R0003.pdf PDF
01 22 00.00 26 R0003.pdf PDF
E-52-18-4-101 R0003.PDF PDF
E-52-18-4-100 R0003.PDF PDF
Photo C R0003.pdf PDF
41 22 13.72 26 R0003.pdf PDF
North Bridge Crane Trolley Rail HLL R0003.pdf PDF
HECP NWS 11519 revision 2 R0003.pdf PDF
Reference Drawing Plate 39619 R0003.pdf PDF
E-52-18-4-99 R0003.PDF PDF
Photo B R0003.pdf PDF
Photo J R0003.pdf PDF
Table of Contents R0003.pdf PDF
Amendment 0003 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
E-52-20-2-9 R0003.PDF PDF
E-52-18-3-56 R0003.PDF PDF
Upstream Corbel HLL R0003.pdf PDF
Downstream Corbell HLL R0003.pdf PDF
E-52-20-2-11 R0003.PDF PDF
CENWS ODA HECP Local Supplement R0003.pdf PDF
G-203 R0003.pdf PDF
E-52-20-7-2 R0003.PDF PDF
41 22 13.75 26 R0003.pdf PDF
Amendment 0002 W912DW24R0019 (AFD Powerhouse Bridge Crane).pdf PDF
AFD-24-RE R0001.pdf PDF
20240805 Site-Visit Attendance List R0001.pdf PDF
REGISTER R0001.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFD Powerhouse Bridge Crane Rehab 23011 Oldtown, ID W912DW24R0019

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00.00 26

SUMMARY OF WORK

12/22

PART 1 GENERAL

1.1 SUMMARY

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 OCCUPANCY OF PREMISES

1.4 EXISTING WORK

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00.00 26 Page 1 R0003

SECTION 01 11 00.00 26

SUMMARY OF WORK

12/22

PART 1 GENERAL

1.1 SUMMARY

This section provides a summary of the various Contract work elements and their relationship to each other. This summary describes work activities within interim construction completion date. This Section does not provide the technical detail for particular work activities, but describes work as a whole, providing overall perspective to the separate tasks and their interrelationships. Use this Section in conjunction with all the Specification Sections and the Drawings to establish the total work requirements.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

This section is a general summary of the required work and is not all-inclusive. The work described within these specifications include, but not necessarily be limited to the following:

a. Removal and disposal of the existing equipment not to be reused including: two trolleys, bridge crane motor and brakes, operators cab, trolley access ladders, etc.

b. Design and provide two bridge crane trolleys, including new main and auxiliary hoists, trolley drives, sheave nests, wire rope, load cells, tandum linkage, etc.

c. Design and provide new main and auxiliary hoist lower sheave blocks and hooks.

d. Design and provide bridge drive motor and brake.

e. Inspection of bridge drive open gears with the optional items to replace gears and shaft.

f. Oil flush of bridge drive enclosed reducer gearboxes. Refill with new oil.

g. Design and provide new crane control system, including radio remote controller, operator chair, variable frequency drives, limit switches , and auxiliary control devices.

h. Design and provide operator control cab.

i. Complete load testing of the crane and all hoists.

j. Design and provide north and south trolley access walkways at trolley elevation. Design and provide new bridge to trolley access all four corners of crane.

SECTION 01 11 00.00 26 Page 2

k. Modify powerhouse wall access hatch located at the cab bridge elevation to a full-size standard door.

l. Load testing of Below the Hook Devices in accordance with ASME BTH-1 and ASME B30.20. Optional Items to weld repair BTH devices.

Optional Items to design and provide new BTH devices.

m. Prepare and furnish O&M manuals and as-built drawings for the completed installation.

n. Provide all necessary commissioning activities and support Government commissioning activities.

o. Design and Install replacement horizontal life lines for upstream and downstream bridge rails north and south trolley rails.

1.2.2 Location

The work is located at the Albeni Falls Dam Powerhouse.

1.3 OCCUPANCY OF PREMISES

Albeni Falls Dam and Powerhouse is a working facility and daily routines require frequent operations to be conducted. In addition, other equipment at the powerhouse must remain accessible for routine inspections, testing, and maintenance activities. Buildings will be occupied during performance of work under this Contract

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --